Replacement of Existing Paging System

project 05a553408430a68e
Normalized: replacement of existing paging system
moreland_contracts
Entity Properties (gold project table)
project_id
05a553408430a68e
name
Replacement of Existing Paging System
client_id
canonical_metadata
created_at
2026-02-12 05:36:54.288209+00:00
updated_at
2026-02-12 05:36:54.288209+00:00
status
billable
recurring
squad
qa_partner
project_manager
lead_dev
description
Assisting MRP Solutions with the replacement of an existing paging system through software development resources.
state
team_name
closedate
dealstage
contract_type
fixed_fee
contract_hourly_rate
195.0
contract_estimated_hours
contract_total_fee
30340.0
58%
Separation Confidence How distinct this entity is from others. Higher means no close matches existed when it was created. Lower means a near-match was rejected just below the 80% threshold — worth reviewing.
Moderate — a somewhat similar entity exists
96%
Avg Match Confidence The average confidence score across all active source mappings. Shows overall quality of linkage between source records and this canonical entity.
Strong source linkage

Source Mappings (95)

Source Source ID Display Name Confidence Method Status Actions
moreland_contracts bx7va3OJhwk9CQ Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
time_and_materials
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-04-09T13:57:29.980141+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts TAWQl4ihydTNuw Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-03-26T02:04:49.625768+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts pVPanN+OmlTvIg Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assistance with the replacement of existing paging system including software development resources to build and deploy a paging system.
start_date
2024-10-16
extracted_at
2026-03-06T00:03:32.536592+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts FJ1Pc4/uadwTuA Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
time_and_materials
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-03-06T02:03:44.493588+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts bNfm3t+LZxDPiw Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
time_and_materials
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-03-05T00:02:59.724702+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts 85X+R33CaozsEg Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
time_and_materials
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-03-04T06:04:02.365731+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts SsMehIp+sPybpw Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
time_and_materials
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-03-04T18:03:33.138242+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts Kj3JVHmWE5h2qw Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-03-03T12:02:46.515053+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts 4xKsj3wv9aZstQ Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-03-04T00:03:27.644663+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts +O3LTVxo/dU5JA Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-03-03T02:04:00.156110+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts EI7Qmg/SKvkeDg Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-03-02T18:03:13.288877+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts l37ZkzO8xqq51Q Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
time_and_materials
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-02-24T18:03:48.073896+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts wTIvqZPi4oZZOQ Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
time_and_materials
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-02-26T00:03:40.558512+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts GmVQVuhDmdg0/g Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
time_and_materials
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-02-25T06:03:39.890029+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts zGzSYsP+tl9/OA Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
time_and_materials
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-02-21T00:03:59.844877+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts pW3clixkoRx5BQ Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-02-24T00:03:23.022136+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts l7RUS7BsXXjLbw Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-02-25T18:03:50.858490+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts pwjRO39koJLXGA Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
time_and_materials
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-03-03T06:03:14.012864+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts BrVOMehcwArveg Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system.
start_date
2024-10-16
extracted_at
2026-04-10T02:04:08.501326+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts DPM1cV4Ia3c2iQ Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
time_and_materials
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-04-12T02:03:16.495052+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts kTe9COpUzYr9eA Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system.
start_date
2024-10-16
extracted_at
2026-04-13T02:03:46.270413+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts iP+t8tSkKofSdw Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
MorelandConnect LLC will assist MRP Solutions with the replacement of an existing paging system by providing software development resources to build and deploy a new paging system.
start_date
2024-10-16
extracted_at
2026-04-14T02:04:02.241152+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts qshw++RCzEYPPg Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
time_and_materials
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-04-15T02:03:49.605747+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts mbjRt9BD7XcG7A Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
time_and_materials
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-04-16T02:03:49.749568+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts WUDaXSF2+tSxCw Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
time_and_materials
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-04-17T02:03:38.060545+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts fNYDLRwVS3rBqw Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
MorelandConnect LLC will provide consulting services to assist MRP Solutions with the replacement of an existing paging system.
start_date
2024-10-16
extracted_at
2026-04-18T02:03:50.196093+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts iSd8Aw/kbStGqw replacement of existing paging system 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
replacement of existing paging system
contact_person
Mark Negrelli
contract_type
time_and_materials
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-04-02T02:03:59.001104+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts crL4t5ivkU84FA Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-04-19T02:03:26.590963+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts QmvG70BTKukErg Replacement of existing paging system 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of existing paging system
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-04-06T02:03:59.358895+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts rQzMCd9v37kp3g Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
MorelandConnect LLC will assist MRP Solutions with the replacement of an existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-04-01T02:04:29.652488+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts mgLZdKnFkcK9rw Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
time_and_materials
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-02-19T03:09:53.807159+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts kpdg33MBw627EQ Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system.
start_date
2024-10-16
extracted_at
2026-02-22T02:03:57.065098+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts cpydW9UDxYXZnw Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
time_and_materials
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-02-21T02:04:04.746699+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts VTaRsyK6qHTqLQ Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
time_and_materials
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-02-22T06:03:16.202247+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts hjbNoHuu8n1c2A Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-02-20T12:03:37.248585+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts jyBmycWjCAmmIQ Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-02-23T06:04:14.883842+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts RwNkg0qTHAxrtA Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-03-02T17:46:48.317715+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts Gs2r5xaHne1hEw Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
time_and_materials
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-03-20T02:03:49.032377+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts dKFvKZTsqXKvdw Replacement of existing paging system 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of existing paging system
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-03-21T02:03:59.072309+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts jVJczNveX+tNCw Replacement of existing paging system 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of existing paging system
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-03-29T02:03:52.159753+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts XF97DJuwHPoRwQ Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-04-04T02:03:53.951443+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts kfb1ZnwOE4l1lQ Replacement of existing paging system 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of existing paging system
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-04-03T02:03:43.651007+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts nCoHVL96cifiVw Replacement of existing paging system 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of existing paging system
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-03-27T02:04:07.027688+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts vK2i/OJhBJnTpg Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
time_and_materials
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-03-22T02:03:39.879844+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts YpWy+FGDrgxb7g Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
time_and_materials
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-02-25T12:03:32.388196+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts Wib4WWzA1vb8ag Replacement of existing paging system 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of existing paging system
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-02-19T03:07:47.536598+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts SogALaibJuuHwg Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-02-21T12:03:31.009639+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts AgoU8am9nPDfwg Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
time_and_materials
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-02-20T00:03:19.922849+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts sepjyQfCDgzwFQ Replacement of existing paging system 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of existing paging system
contact_person
Mark Negrelli
contract_type
time_and_materials
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-02-19T12:04:00.404211+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts LgzG3SDI342Ddw Replacement of existing paging system 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of existing paging system
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-02-23T12:03:34.378025+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts yqAZ/vO7KusFhw Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
time_and_materials
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-03-05T02:03:50.971046+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts 5F3YwySy0p1gTA Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
time_and_materials
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-03-05T06:03:18.863477+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts uT4jFZn2SYeSGA Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
time_and_materials
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-03-19T21:20:14.963561+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts tLsgUPR1vrk8Fw Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
time_and_materials
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-04-08T21:06:42.736356+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts zkyrVYpT6eeVmA Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-04-05T02:03:50.500572+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts 0W1gKH3SwxSaiw replacement of existing paging system 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
replacement of existing paging system
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-03-31T02:04:15.425100+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts Sv0ZPKlspquUmw Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-03-06T06:03:19.654794+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts lFjKJVbajfPsvg replacement of existing paging system 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
replacement of existing paging system
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-03-02T17:46:57.316367+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts btudlXmShza+fw Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
time_and_materials
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-02-26T12:03:44.058112+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts AujybJ9v7LAstg Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-02-24T12:03:33.024081+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts f7QT2omCvp+pKA Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-02-25T02:03:55.045185+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts F6rDU1t+cDIOpQ replacement of existing paging system 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
replacement of existing paging system
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-02-24T02:04:07.520160+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts C8d3Pwjpqev0zw Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
time_and_materials
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-02-24T06:03:34.034291+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts sIDAmOFhe6ZBUA Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assistance with the replacement of existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-02-23T02:04:02.663158+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts WraEYkTjmcNDdg Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system.
start_date
2024-10-16
extracted_at
2026-02-19T06:03:47.099661+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts U5vpVBOD1kYcPg Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
time_and_materials
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-02-20T02:04:17.720815+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts L6OancHSkkde3w Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
time_and_materials
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-02-22T12:03:31.497896+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts T/3LWGPVWpKN9g Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-02-21T18:03:34.008015+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts kPPrC0jq7nK1XA Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system.
start_date
2024-10-16
extracted_at
2026-02-19T18:03:43.211076+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts LZQGAqYIXSw79g Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
MorelandConnect LLC will provide consulting services to assist MRP Solutions with the replacement of an existing paging system.
start_date
2024-10-16
extracted_at
2026-02-20T06:03:31.848199+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts 6jRhK1yEmgsaLw replacement of existing paging system 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
replacement of existing paging system
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-03-04T12:03:31.329316+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts m9QDqMPfdDZ/Ww Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
time_and_materials
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of an existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-03-05T12:03:35.134453+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts jzZ8utUm/TznrA Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-04-07T02:04:01.742307+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts 4TtAILqVYd2LEg Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-03-03T00:03:18.087394+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts +VGZ7VRNlso5pw Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assistance with the replacement of existing paging system including software development resources to build and deploy a paging system.
start_date
2024-10-16
extracted_at
2026-02-26T06:03:54.240318+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts LQihw01/RkM/yw Replacement of Existing Paging System 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
Replacement of Existing Paging System
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system through software development resources.
start_date
2024-10-16
extracted_at
2026-02-26T02:03:59.836111+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts VrxoOsdpA3yvGQ paging system 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
paging system
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-02-23T00:03:49.338029+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts TxrBD8LU/jp5VA paging system 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
paging system
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-03-19T15:15:05.798482+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts 0xKHTMnu+ByD9A paging system 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
paging system
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assistance with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-03-06T12:03:32.203292+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts uKQY1qF/qhFYOg paging system 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
paging system
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-03-03T18:03:35.432388+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts hyv0JiF8pVHxOA paging system 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
paging system
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-03-24T02:04:03.021725+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts VLN8LYZh5dmtfQ paging system 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
paging system
contact_person
Mark Negrelli
contract_type
time_and_materials
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assistance with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-02-22T00:03:23.067533+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts nIoQ5NC7s01r8A paging system 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
paging system
contact_person
Mark Negrelli
contract_type
time_and_materials
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assistance with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-02-20T18:03:27.854164+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts l3qagvP2yxfFbA paging system 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
paging system
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-03-28T02:04:12.312621+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts VL/jfla/0bqixQ paging system 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
paging system
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-02-25T00:03:21.305649+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts pQt1dZ99d185jQ paging system 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
paging system
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assistance with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-04-11T02:03:39.534122+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts O3aWoEBTp5qDHQ paging system 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
paging system
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-03-04T02:04:11.063126+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts SOiTIpe+/FS69A paging system 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
paging system
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assistance with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-02-21T06:03:29.711557+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts om2SPd5P7o/L9A paging system 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
paging system
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-03-25T02:04:34.719589+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts oafIjXY25dcTMg paging system 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
paging system
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-03-23T02:03:58.103948+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts lVtTmHsUUXnFuw paging system 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
paging system
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-04-08T02:04:05.690511+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts dAgDPgHKkM71XQ paging system 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
paging system
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-02-26T18:03:25.665328+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts OK+s1pRxLgU3VA paging system 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
paging system
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-04-09T02:03:38.188467+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts 4WNxt8j/LjvfbQ paging system 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
paging system
contact_person
Mark Negrelli
contract_type
fixed_fee
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-03-30T02:04:27.116269+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts GJHWlwe892qrSA paging system 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
985443ce4aff674732c11c918085a610
file_name
MRP Solutions - Moreland Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B60AA0E8C-9944-42F0-9A02-43FC42EDBC29%7D&file=MRP%20Solutions%20-%20Moreland%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
MRP Solutions
project_name
paging system
contact_person
Mark Negrelli
contract_type
time_and_materials
hourly_rate
195.0
estimated_hours
total_fee_estimate
30340.0
brief_project_description
Assisting MRP Solutions with the replacement of existing paging system.
start_date
2024-10-16
extracted_at
2026-02-23T18:03:53.374121+00:00
raw_text_preview
October 16, 2024 Mark Negrelli Maintenance Coordinator MRP Solutions 2222 Highland Rd Twinsburg, OH 44087 Dear Mark: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist MRP Solutions. (“MRP”) with the replacement of existing paging system (the "Project"). Background MRP Solutions, a plastic cap manufacturer is a leading provider of high-quality, injection molded plastic closures, jars and packaging components used every day by millions of consumers around the globe. MRP has asked Moreland to replace and existing software based paging application. Project Activities, Scope, and Approach Project Objectives and Activities The objective of the Project is for Moreland to provide software development resources to build and deploy a paging system. Moreland will assist MRP in the delivery of the Project. Moreland will work with MRP to complete project activities described below: Design, Develop, Test and Deploy Paging System Including Project Planning & Setup Build BackEnd Database Paging Application Build Admin Portal System and User Acceptance Testing Implementation Project Approach MRP will prioritize work and communicate to the Moreland resources using normal communication channels (e.g., email, phone, meetings). The Moreland team will work with MRP to coordinate the implementation of tested and approved modifications to the software. Responsibilities The following table outlines the key responsibilities for MRP and Moreland. Moreland will perform the Services at MorelandConnect and MRP office locations. Organization/Staffing It is anticipated that the Services will require effort from MRP personnel. This work will be coordinated by an appropriate engagement contact assigned by MRP. Moreland will provide resources to the Project to assist MRP in the Project activities. Fees and Expenses The Services will be performed as follows. Project Plann
file_created_at
2024-10-16T18:15:45+00:00
file_modified_at
2024-10-29T00:36:30+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta