AI-First Architecture & ERP Transformation Proposal

project 1289805d308c48ec
Normalized: ai first architecture and erp transformation proposal
moreland_contracts
Entity Properties (gold project table)
project_id
1289805d308c48ec
name
AI-First Architecture & ERP Transformation Proposal
client_id
canonical_metadata
created_at
2026-02-12 05:36:54.288209+00:00
updated_at
2026-02-12 05:36:54.288209+00:00
status
billable
recurring
squad
qa_partner
project_manager
lead_dev
description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
state
team_name
closedate
dealstage
contract_type
fixed_fee
contract_hourly_rate
contract_estimated_hours
contract_total_fee
40.0
57%
Separation Confidence How distinct this entity is from others. Higher means no close matches existed when it was created. Lower means a near-match was rejected just below the 80% threshold — worth reviewing.
Moderate — a somewhat similar entity exists
98%
Avg Match Confidence The average confidence score across all active source mappings. Shows overall quality of linkage between source records and this canonical entity.
Strong source linkage

Source Mappings (159)

Source Source ID Display Name Confidence Method Status Actions
moreland_contracts CpPIyK53M/Ouig AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, and AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-04-01T02:10:02.002830+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts 5uj+7oA1QigYyA AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-04-02T02:08:51.602310+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts HArq9AmRipHASA AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-03-27T02:09:02.086697+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts fKEEXRuSFNyJ4g AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
135000.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-03-06T02:07:52.260595+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts wSKeVVOuQnUEmg AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-03-06T06:07:16.576963+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts Q66x+cYWstaGXw AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-03-05T00:06:38.416461+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts biRFckErNcxoVg AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting to a modern, flexible, and AI-first business architecture as it separates from EGLO Lighting.
start_date
extracted_at
2026-03-03T18:08:26.915428+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts QyBevyF8PxffrA AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-03-03T12:06:15.693491+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts 0GWolSlMEfoL8A AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, and AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-03-04T02:08:31.616455+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts 8Jzyg2EZQUOhVg AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-03-04T00:08:17.707031+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts tPVrfQMoL6EIfw AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40000.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-03-04T12:07:57.971062+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts 0Du3AOa9ehDrFA AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting to a modern, flexible, and AI-first business architecture, replacing inherited IT systems and implementing a new software ecosystem.
start_date
extracted_at
2026-02-26T18:08:06.758557+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts 5qX4v3ojRCsMQQ AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40000.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-03-02T17:51:22.718091+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts Kwg1j6MgCqMTTw AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-02-26T12:09:04.424983+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts KvRkHrTMDNCcAA AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting to a modern, flexible, and AI-first business architecture as it separates from EGLO Lighting.
start_date
extracted_at
2026-02-24T06:07:54.541348+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts +/+vGnLJLnkATQ AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
135000.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-02-23T12:07:50.636926+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2025-12-06T20:26:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts pxiy3lU4HAAC1g AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting to a modern, flexible, and AI-first business architecture, replacing inherited IT systems and implementing a new software ecosystem.
start_date
extracted_at
2026-03-03T02:08:23.835229+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts KeeUFBHwEcbt/A AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-03-03T06:07:23.450231+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts wRzZqDaHfWASdA AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
135000.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, and AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-03-05T12:08:19.652221+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts jUvcfFyLvFTEdQ AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-03-19T15:19:41.049748+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts 4oOw2/iiIQA7HQ AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-03-19T21:24:41.665063+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts Aw83hWVdTOTcBw AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-03-21T02:08:58.046412+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts TZYFggIOGDlYkg AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-03-22T02:07:55.011545+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts pY0SErrj3nzaAA AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, and AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-03-28T02:09:19.133573+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts uzkpl/MEBe2aRg AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
135000.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-04-10T02:08:46.974357+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts 2D3+g5c5eWsT0w AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-04-11T02:07:42.758372+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts +w68LDE9aaeMYw AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-04-11T02:07:39.719059+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts MDQYuYYiqpKy8Q AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
extracted_at
2026-04-12T02:07:02.093007+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts GALlrJHdpRlfPg AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-04-12T02:07:00.260543+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts 7mhyEAiIMd3GoA AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-04-13T02:08:14.241575+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts F6G2//2RTAsn+Q AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, and AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-04-13T02:08:11.890158+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts MFLH9nnDjCsN5w AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-04-14T02:08:01.160466+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts pAM3o1X9kXzANA AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-04-14T02:08:03.157884+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts QLTUgBgPN8L6oQ AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
135000.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture over a structured five-phase engagement.
start_date
2026-01-01
extracted_at
2026-04-09T14:01:42.548179+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts kBxKQTrBJhV22g AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-02-21T18:07:52.435940+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2025-12-06T20:26:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts 2mb3AtLAinVitg AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-02-20T18:07:17.950493+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2025-12-06T20:26:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts nEbgwEItdcH1kw AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-02-20T06:07:54.743428+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2025-12-06T20:26:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts YYdfM+ezeb+F1Q AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-02-20T12:07:49.707575+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2025-12-06T20:26:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts 25CRU+lrgAUBvA AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-02-23T18:08:40.974855+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts ZrtXlRZ1vKfntQ AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
extracted_at
2026-02-24T02:08:38.899272+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts jhfjncyekheIDg AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-02-25T12:08:04.366277+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts yenXGoxx53aeKg AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
135000.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture over a structured five-phase engagement.
start_date
2026-01-01
extracted_at
2026-02-25T06:08:16.310923+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts fNb1KgnqbtjiKw AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-03-05T06:07:25.257792+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts XP2wipElQ3mxDg AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-03-06T12:07:28.132498+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts GHdzDPwu8I1M5Q AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-03-19T15:19:43.685398+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts GRH19FuICpYybA AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-03-19T21:24:44.188947+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts sRcMu+MXYVFOKQ AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-03-21T02:08:55.227401+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts Y3Mqx/XV38Ouzw AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
135000.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture over a structured five-phase engagement.
start_date
2026-01-01
extracted_at
2026-03-29T02:08:05.848211+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts dxLbBOdnuPggNg AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-03-30T02:09:34.909717+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts ZfPxHi7QGV3DvA AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-04-07T02:09:43.869854+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts U9JDojoWclkNuw AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-04-07T02:09:47.380326+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts HA7L1ds0Yl6MMw AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-04-06T02:08:33.398668+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts /nxOdVGDtZ6u2w AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-04-02T02:08:48.686488+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts IA3M5o5+F5H/NA AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
extracted_at
2026-04-09T02:07:35.376327+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts vXk8JMGbQbu6zQ AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-04-01T02:10:04.493829+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts V1htH7tDStaKSA AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-03-28T02:09:21.932967+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts tzdIY0jGs66j0Q AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-03-06T12:07:24.963490+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts kHm7955sQZbhSg AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-03-05T02:07:50.756056+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts GZ5+FP7WIUggcg AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, and AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-03-04T12:07:55.714059+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts dPppVzwLYehwbQ AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-03-02T18:07:23.256515+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts +Ch170lPl0TMjA AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited systems to a modern, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-03-03T02:08:21.381135+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts WYKo7PdAGYrIDQ AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting to a modern, flexible, and AI-first business architecture, replacing inherited IT systems and implementing a new software ecosystem.
start_date
extracted_at
2026-02-26T02:08:10.365776+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts 5dNGwbn7bL4Xzg AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, and AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-02-26T02:08:08.075777+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts wbDcXSB+kpdkBQ AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-02-24T12:07:34.145255+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts U902vRwzWAgnlQ AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting to a modern, flexible, and AI-first business architecture, replacing inherited IT systems and implementing a new software ecosystem.
start_date
extracted_at
2026-02-23T00:09:33.166111+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts Keql2ZFQHaiyQg AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
extracted_at
2026-02-23T18:08:38.625766+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts dBh0ydfQwmSbUg AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
135000.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-02-20T00:06:50.364266+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2025-12-06T20:26:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts ZQDzHMvaeCdHRA AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-02-19T12:08:13.061656+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2025-12-06T20:26:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts WWhxSwIe7XNTbg AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-02-21T12:07:38.381727+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2025-12-06T20:26:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts +cPTBwJipSNlHA AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-02-22T00:07:17.680112+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2025-12-06T20:26:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts bB6ukfO7Qj3COg AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, and AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-02-20T02:08:39.089581+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2025-12-06T20:26:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts 9nKZvwcLnciY9w AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-02-21T00:08:50.225297+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2025-12-06T20:26:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts Xb9/SvYrPDTlIg AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-02-23T06:09:23.477334+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2025-12-06T20:26:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts 2pj67A+AkhH78Q AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting to a modern, flexible, and AI-first business architecture, replacing inherited IT systems and implementing a new software ecosystem.
start_date
extracted_at
2026-02-23T02:08:13.768960+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts rWuJBC83FN1pUw AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, and AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-02-24T00:07:33.850454+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts A0os9oWmFNiB0Q AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, and AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-02-24T18:08:11.489913+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts PumnQfcf86rZYw AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, and AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-02-25T00:07:13.416095+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts oLM6daLiINmZ3g AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-03-02T17:51:20.055928+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts 0EyaJ0vyXwlOAg AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
135000.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-03-03T06:07:20.422599+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts PQBZ3BRwtpyw/Q AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-03-05T02:07:48.111855+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts 8LJN61Po5pEMfA AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
135000.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-03-20T02:07:53.602616+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts RcD2bNwS8+N9uw AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-03-23T02:08:48.355039+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts M7WDUei32YGjqQ AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-03-24T02:08:34.059241+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts sn0Vr/8dJhhG+A AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-03-24T02:08:31.655861+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts CKn/wQJIySTepg AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-04-06T02:08:30.584605+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts HNSEga/02LvnKA AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-04-08T02:08:47.543491+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts QcF4ZRdwV2m+lA AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
extracted_at
2026-04-09T02:07:37.556747+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts PWHjteN6BVk0bw AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-04-08T21:10:35.960281+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts Oljt6wbF8SLr7A AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, and AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-04-03T02:08:19.092776+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts JMC+/iB8JIq6WA AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-03-30T02:09:32.102027+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts PwSqN5sGn+cRzA AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
135000.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-03-06T00:07:21.223777+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts 9OgeRUvC0VFoRw AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-03-03T12:06:18.560142+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts VWY3kDhsZv82Sw AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
extracted_at
2026-03-04T18:08:27.849141+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts OjxOzOtSZs+Abg AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, and AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-03-04T06:09:44.734555+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts mGqDXzHiT2DImw AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-02-26T18:08:03.621689+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts S/DCg+04kjdOqQ AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, and AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-03-02T17:51:32.601741+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts AG5rppI9jJhB2A AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-02-26T12:09:01.179003+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts ZJaL4AGASsqUTA AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, and AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-02-26T00:08:06.761014+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts M4VyDJZgnUHq0w AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-02-25T18:08:36.953861+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts /iwDAyeUFgjv8g AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-02-24T12:07:37.083994+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts fV3TV9oPzpFmVQ AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-02-24T00:07:36.564877+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts xAtcQ03Zt+/RPg AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-02-19T03:13:51.259002+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2025-12-06T20:26:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts rA4Ss6qpCNwdbQ AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-02-19T06:08:19.783856+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2025-12-06T20:26:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts Pg/dwx811gGWpw AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
135000.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-02-19T03:11:42.611124+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2025-12-06T20:26:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts kRtJDx49MQFdpQ AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting to a modern, flexible, and AI-first business architecture by replacing inherited IT systems and implementing a new software ecosystem.
start_date
2026-01-01
extracted_at
2026-02-21T02:08:18.755307+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2025-12-06T20:26:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts egz1aLz+F+1EAg AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-02-22T12:07:34.114898+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2025-12-06T20:26:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts ZHMJlQLyzqLA6A AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
135000.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-02-19T18:08:09.103308+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2025-12-06T20:26:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts 83VI6iWz6fKzfg AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40000.0
brief_project_description
Thesis Lighting is transitioning to establish itself as an independent North American lighting company by replacing inherited IT systems and building a modern, AI-first business architecture.
start_date
extracted_at
2026-02-25T12:08:06.837262+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts c8a2Yn2egAOHnQ AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting to a modern, flexible, and AI-first business architecture, replacing inherited IT systems and implementing a new software ecosystem.
start_date
extracted_at
2026-02-25T02:07:35.274302+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts bf3CUHPNqU49eA AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
135000.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-03-02T18:07:20.796882+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts AGrD+1ZugKWP8Q AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-03-03T18:08:23.879894+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts 1fiydvzW5NlDPw AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-03-05T06:07:27.380834+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts hXHpdZhNCWg1Hw AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-03-25T02:09:53.748755+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts U0KQsk5dxQkSAQ AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-04-10T02:08:49.505312+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts sNHS/WxRXxA26A AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, and AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-04-05T02:08:08.664454+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts LuVcrasGbEyRrA AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting to a modern, flexible, and AI-first business architecture by replacing inherited IT systems and implementing a new software ecosystem.
start_date
extracted_at
2026-04-04T02:09:07.350078+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts PJQpzHkEPafN/g AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
135000.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-04-04T02:09:03.977251+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts o3T3yJRD9yeXWA AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-04-03T02:08:21.995081+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts ns0CgkOF7xrbvA AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-03-31T02:09:14.296346+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts eDeiAN8zmA8bzw AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-03-27T02:09:05.005689+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts TUij6pD3fs+6iA AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-03-26T02:10:00.572660+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts DRnhPBA3NfjPpQ AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting to a modern, flexible, and AI-first business architecture as it separates from EGLO Lighting.
start_date
extracted_at
2026-03-26T02:10:03.829287+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts MohM6GsWfMeldg AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-03-23T02:08:46.171397+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts UxqpcQ0kfcfRGw AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-03-06T02:07:55.026664+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts /LfdTDh/0Ej9sA AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting to a modern, flexible, and AI-first business architecture, replacing inherited IT systems and implementing a new software ecosystem.
start_date
extracted_at
2026-03-04T00:08:20.582806+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts 4g+MHMDCAhYmhA AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting to a modern, flexible, and AI-first business architecture as it separates from EGLO Lighting.
start_date
extracted_at
2026-03-04T06:09:48.568092+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts 6fwHpd3LbZdVSA AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-03-04T18:08:25.555883+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts EVRV0K+9MRRB0w AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-03-03T00:07:09.777420+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts i3A/Yweb2ea8tA AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-02-26T00:08:09.906057+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts C3atTNYukA37gg AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, and AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-02-25T18:08:34.487517+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts aRv/2nahXvEnDw AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-02-24T06:07:52.056272+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts T3e8Og5rgpdh6w AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
135000.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, and AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-02-23T02:08:11.430031+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2025-12-06T20:26:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts 6S7rdvkcVQdymA AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-02-23T06:09:26.778875+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts AJ1AggYT2+2u6g AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-02-25T02:07:32.768517+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts 4j4F280YM/fWxg AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting to a modern, flexible, and AI-first business architecture, replacing inherited IT systems and implementing a new software ecosystem.
start_date
extracted_at
2026-02-25T06:08:18.886937+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts lPsYFKpYh+R2yw AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-02-23T00:09:28.605682+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2025-12-06T20:26:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts qcPajnTD3tV7Qw AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
135000.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture over multiple phases.
start_date
2026-01-01
extracted_at
2026-02-22T06:06:54.026153+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2025-12-06T20:26:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts N5c9zNpIS9kITg AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
135000.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-02-22T02:07:44.606027+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2025-12-06T20:26:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts u6dWZys17E3ZzQ AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-02-21T06:07:53.099129+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2025-12-06T20:26:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts /cvixznbapvm+g AI-First Architecture & ERP Transformation Proposal 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation Proposal
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
135000.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-02-24T02:08:36.072586+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts lvDBWYwQzUO6uQ AI-First Architecture & ERP Transformation 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting to a modern, flexible, and AI-first business architecture as it separates from EGLO Lighting.
start_date
extracted_at
2026-02-25T00:07:16.464134+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts lTHbjLTujt4ArA AI-First Architecture & ERP Transformation 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, flexible, AI-first business architecture.
start_date
extracted_at
2026-02-24T18:08:13.934241+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts J5qrdN8S36qXmg AI-First Architecture & ERP Transformation 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-04-08T21:10:39.375795+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts UQjYLwqMVAb9/g AI-First Architecture & ERP Transformation 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-03-04T02:08:34.884928+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts GAq6sJ5ttLwbIw AI-First Architecture & ERP Transformation 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-03-20T02:07:56.104568+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts vd44IUu+HATl+w AI-First Architecture & ERP Transformation 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-04-05T02:08:11.386441+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts ZWVjQ0XWwILPNg AI-First Architecture & ERP Transformation 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-03-05T12:08:23.021549+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts 4CvGNhGeYmbThw AI-First Architecture & ERP Transformation 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-03-31T02:09:18.097163+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts Ye0lsg7Z6dfZQQ AI-First Architecture & ERP Transformation 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting to a modern, flexible, and AI-first business architecture as it separates from EGLO Lighting.
start_date
extracted_at
2026-03-22T02:07:57.548224+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts KVaEsCkoNJ3q/A AI-First Architecture & ERP Transformation 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-03-03T00:07:06.731382+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts vhnCo/VQYHMCvg AI-First Architecture & ERP Transformation 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-04-09T14:01:44.892975+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts al9VKQA0t/EFTQ AI-First Architecture & ERP Transformation 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting to a modern, flexible, and AI-first business architecture as it separates from EGLO Lighting.
start_date
extracted_at
2026-03-05T00:06:40.653077+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts FoDjMxPR+WstLw AI-First Architecture & ERP Transformation 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-03-06T06:07:18.782557+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts +iFq3Aw4QEpjJA AI-First Architecture & ERP Transformation 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-03-06T00:07:24.215893+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts n5rxUbjSQfQaXg AI-First Architecture & ERP Transformation 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
c052b078401908fca6dea969a070a351
file_name
Thesis Lighting Strategy proposal from MorelandConnect.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BDC79103E-7945-4539-9A64-200BEDD5C27B%7D&file=Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
2026-01-01
extracted_at
2026-04-08T02:08:44.030371+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away from EGLO’s inherited SAP, PIM, and supporting IT systems—well within the 24-month runway EGLO has provided—and build a modern, flexible, and AI-first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five-phase engagement to help Thesis select and implement the next-generation software ecosystem that will power the company’s future. This includes a lighter-weight ERP system, high-impact AI-powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months Select a right-sized ERP designed for speed, usability, and integration Use AI strategically to simplify processes, improve decisions, and reduce long-term system costs Implement a flexible architecture mixing packaged software, custom build, and AI-first tools Ensure Thesis Lighting is operational on its new platforms beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities Conduct a 2-day deep-dive workshop with business leaders and key users Document high-level process flows across order-to-cash, procure-to-pay, inventory, financials, logistics, and customer management Identify all system requirements ("meat-and-potatoes" ERP needs and advanced features) Share FOUNDATION AI capabilities and define AI use cases tailored to lighting Develop a must-
file_created_at
2025-12-06T13:26:22+00:00
file_modified_at
2026-02-23T14:57:38+00:00
created_by
Jeff Kavlick
modified_by
Paul Franke
_dlt_meta
moreland_contracts 6SNzGbIgGUsxzQ AI-First Architecture & ERP Transformation 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-03-02T17:51:35.381661+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts Mv6M1KY+gaAwTQ AI-First Architecture & ERP Transformation 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-03-25T02:09:59.448507+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts rpaMZMFyiwFwlQ AI-First Architecture & ERP Transformation 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting to a modern, flexible, and AI-first business architecture, replacing inherited IT systems and implementing a new software ecosystem.
start_date
extracted_at
2026-02-23T12:07:53.946001+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
moreland_contracts 43TeA/Rdo/BhaQ AI-First Architecture & ERP Transformation 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
4909cd235e239ac13830df56b4ab3afa
file_name
Thesis Lighting Strategy proposal from MorelandConnect.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Thesis%20Lighting/Thesis%20Lighting%20Strategy%20proposal%20from%20MorelandConnect.pdf
company
Thesis Lighting
project_name
AI-First Architecture & ERP Transformation
contact_person
contract_type
fixed_fee
hourly_rate
estimated_hours
total_fee_estimate
40.0
brief_project_description
Transition Thesis Lighting from EGLO Lighting's inherited IT systems to a modern, AI-first business architecture.
start_date
extracted_at
2026-03-29T02:08:09.200919+00:00
raw_text_preview
MorelandConnect AI-First Architecture & ERP Transformation Proposal For Thesis Lighting Executive Summary Thesis Lighting is entering a pivotal transition as it separates from EGLO Lighting and establishes itself as a fully independent North American lighting company. To operate with modern efficiency, agility, and scale, Thesis will need to transition away fr om EGLO’s inherited SAP, PIM, and supporting IT systems —well within the 24 -month runway EGLO has provided —and build a modern, flexible, and AI -first business architecture. MorelandConnect, supported by our FOUNDATION AI platform, proposes a structured five - phase engagement to help Thesis select and implement the next -generation software ecosystem that will power the company’s future. This includes a lighter -weight ERP system , high-impact AI -powered custom solutions, and a unified architecture designed explicitly for the needs of a modern lighting business. This proposal outlines the recommended phases, costs, timeline, and partnership model. Project Overview Objectives • Replace EGLO IT systems (SAP, PIM, CRM, etc.) within twelve months • Select a right -sized ERP designed for speed, usability, and integration • Use AI strategically to simplify processes, improve decisions, and reduce long -term system costs • Implement a flexible architecture mixing packaged software, custom build, and AI - first tools • Ensure Thesis Lighting is operational on its new platform s beginning in 4Q26 Approach & Phasing PHASE 1 — Strategic Architecture (Discovery & Design) Duration: 2-day onsite workshop + 5 days of analysis Team: 3 FTEs Fee: $40,000 fixed Activities • Conduct a 2 -day deep -dive workshop with business leaders and key users • Document high -level process flows across order -to-cash, procure -to-pay, inventory, financials, logistics, and customer management • Identify all system requirements ("meat -and-potatoes" ERP needs and advanced featur
file_created_at
2026-02-22T19:09:28+00:00
file_modified_at
2026-02-22T19:09:25+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta