THOMPSON - 2018 IECC
project
24898f977aa4c299
Normalized: thompson 2018 iecc
moreland_contracts
36%
Separation Confidence
How distinct this entity is from others. Higher means no close matches existed when it was created. Lower means a near-match was rejected just below the 80% threshold — worth reviewing.
Moderate — a somewhat similar entity exists
100%
Avg Match Confidence
The average confidence score across all active source mappings. Shows overall quality of linkage between source records and this canonical entity.
Strong source linkage
Source Mappings (1)
| Source | Source ID | Display Name | Confidence | Method | Status | Actions | |
|---|---|---|---|---|---|---|---|
| moreland_contracts | 468b4d6f0e476a4e863b8de19a0796d7 | THOMPSON - 2018 IECC | 1.00 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
468b4d6f0e476a4e863b8de19a0796d7
file_name
rc-report-thompson-2018-iecc-nov-10-25.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Payne%20Tompkins/Payne%20%26%20Tompkins%20Upload/Thompson,%20Christy%20(Daughter)%20%26%20Sue%20(Mother)/04%20Production%20Package/02%20-%20Plans/rc-report-thompson-2018-iecc-nov-10-25.pdf
company
Thompson
project_name
THOMPSON - 2018 IECC
contact_person
—
contract_type
—
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
The proposed building design is consistent with the building plans and specifications submitted with the permit application, designed to meet the 2018 IECC requirements.
start_date
—
extracted_at
2026-07-26T02:25:34.987411+00:00
raw_text_preview
Report Title: THOMPSON - 2018 IECC Report Date: 11/10/25, 7:43 PM
1 of 3
Compliance Certificate
Project Information
Project Title:
Energy Code:
Location:
Construction Type:
Project Type:
Project Sub Type:
Orientation:
Glazing Area:
Climate Zone:
Project No:
All Electric:
Is Renewable:
Has Battery:
Has Charger:
Has Heat PumpTHOMPSON - 2018 IECC
2018 IECC
Mantua (Portage), Ohio
Single Family
Addition
None
Bldg. faces 270 deg. from North
13%
5a (6523 HDD)
1788018
false
false
false
false
false
Construction Site: Owner/Agent: Designer/Contractor:
9850 Peck Road
Mantua , OH 44255
Thompson
9850 Peck Road
Mantua , OH 44255
10690 Mayfield Rd
Payne & Tompkins Design Renovations
Chardon , OH 44024
440-226-5040
info@payne-tompkins.com
Project Notes:
Report Title: THOMPSON - 2018 IECC Report Date: 11/10/25, 7:43 PM
2 of 3Envelope Assemblies
AssemblyGross Area
or PerimeterCavity
R-ValueCont.
R-ValueProp.
U-
Factor/
F-FactorReq.
U-
Factor/
F-FactorProp.
UAReq.
UA
Ceiling: Flat Ceiling or Scissor
Truss906 38.0 0.0 0.030 0.026 27 24
Ceiling 1: Cathedral Ceiling:All
insulation air impermeable374 38.0 0.0 0.027 0.026 10 10
Wall - South: Wood Frame, 16"
o.c.
Orientation: Front1280 19.0 7.2 0.041 0.060 51 75
Window 1st Floor: Wood
Frame
Orientation: Front30 0.330 0.300 10 9
Wall West: Wood Frame, 16"
o.c.
Orientation: Right side1280 19.0 7.2 0.041 0.060 49 72
Window 1st Floor: Wood
Frame
Orientation: Right side58 0.330 0.300 19 17
Door: Glass Door (over 50%
glazing)
Orientation: Right side18 0.260 0.300 5 6
Wall - East: Wood Frame, 16"
o.c.
Orientation: Left side1280 19.0 7.2 0.041 0.060 37 54
Window 1st Floor: Wood
Frame
Orientation: Left side365 0.330 0.300 120 110
Door: Glass Door (over 50%
glazing)
Orientation: Left side18 0.260 0.300 5 6
Basement Wall - West: Solid
Concrete or Masonry
Orientation: Unspecified
Wall height: 3.00
Insulation depth: 3.00'
Insulation position: Integral
Insulation1280 30.9 14.2 0.029 0.050 37 64