Technology Strategic Plan
project
375357bce31708c1
Normalized: technology strategic plan
moreland_contracts
Entity Properties (gold project table)
project_id
375357bce31708c1
name
Technology Strategic Plan
client_id
—
canonical_metadata
—
created_at
2026-03-18 14:23:02.367060+00:00
updated_at
2026-03-18 14:23:02.367060+00:00
status
—
billable
—
recurring
—
squad
—
qa_partner
—
project_manager
—
lead_dev
—
description
Development of a Technology Strategic Plan
state
—
team_name
—
closedate
—
dealstage
—
contract_type
fixed_fee
contract_hourly_rate
—
contract_estimated_hours
—
contract_total_fee
300000.0
50%
Separation Confidence
How distinct this entity is from others. Higher means no close matches existed when it was created. Lower means a near-match was rejected just below the 80% threshold — worth reviewing.
Moderate — a somewhat similar entity exists
93%
Avg Match Confidence
The average confidence score across all active source mappings. Shows overall quality of linkage between source records and this canonical entity.
Good match quality
Source Mappings (120)
| Source | Source ID | Display Name | Confidence | Method | Status | Actions | |
|---|---|---|---|---|---|---|---|
| moreland_contracts | tamhFgd9yF+2yw | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan to guide enterprise-wide technology investments and organizational transformation.
start_date
2026-03-01
extracted_at
2026-04-09T13:58:47.973567+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | Z3z12v/4r0ZXAQ | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
project_name
Technology Strategic Plan
contact_person
Chief Information Officer
contract_type
fixed_fee
hourly_rate
—
estimated_hours
160.0
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-04-06T02:05:23.859135+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | BVQgWU1RMtG0AA | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan for the Ohio Turnpike and Infrastructure Commission.
start_date
2026-03-01
extracted_at
2026-04-04T02:05:35.520592+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | NjGNnnmdXGGyhw | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
project_name
Technology Strategic Plan
contact_person
Chief Information Officer
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-04-03T02:05:06.291693+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | qReOzA2t37GbAg | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan for the Ohio Turnpike and Infrastructure Commission.
start_date
—
extracted_at
2026-04-03T02:05:02.688468+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | 75bryafqCwPciw | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
Chief Information Officer
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-04-02T02:05:29.196261+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | WpRVTW83qQvQig | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
Chief Information Officer
contract_type
fixed_fee
hourly_rate
—
estimated_hours
160.0
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-04-01T02:06:15.153980+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | Lw4GM/jiQz+RKQ | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan to guide enterprise-wide technology investments and organizational transformation.
start_date
—
extracted_at
2026-04-01T02:06:11.048045+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | i4jzKlWSwZIq7Q | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan for the Ohio Turnpike and Infrastructure Commission.
start_date
—
extracted_at
2026-03-31T02:05:42.705049+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | urQPkAbA91XBpA | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan for the Ohio Turnpike and Infrastructure Commission.
start_date
—
extracted_at
2026-03-30T02:06:14.292810+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | b88gN422rknkKw | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
—
contract_type
—
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-03-30T02:06:18.245187+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | ykejv5HTsFlqFQ | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan for the Ohio Turnpike and Infrastructure Commission.
start_date
2026-03-01
extracted_at
2026-03-06T00:04:42.978032+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | tc55/+aT0G5Odw | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
Chief Information Officer
contract_type
—
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-03-05T06:04:34.372895+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | SeyPH8XmxTUUAA | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan to guide enterprise-wide technology investments and organizational transformation.
start_date
2026-03-01
extracted_at
2026-03-19T15:16:35.109913+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | HWoqIzqlCUhJug | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan for the Ohio Turnpike and Infrastructure Commission.
start_date
2026-03-01
extracted_at
2026-03-20T02:05:06.850751+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | dSbxp57AtgkV5Q | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
—
contract_type
—
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-03-29T02:05:13.305442+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | Ntlv5eZqf/tAXg | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
Chief Information Officer
contract_type
—
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-04-08T21:07:59.242313+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | Za3LgkGGs1Hl2Q | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan for the Ohio Turnpike and Infrastructure Commission.
start_date
—
extracted_at
2026-04-05T02:05:08.649396+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | gCpkiE/N4E56Pg | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
Chief Information Officer
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-04-04T02:05:39.140573+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | rKDDmkjrn29dGQ | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
project_name
Technology Strategic Plan
contact_person
Chief Information Officer
contract_type
—
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-03-27T02:05:48.291346+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | dR/VSt3tEp1l9Q | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
Chief Information Officer
contract_type
—
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-03-26T02:06:21.983814+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | UYXRefjESXFDDg | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan for the Ohio Turnpike and Infrastructure Commission.
start_date
2026-03-01
extracted_at
2026-03-26T02:06:17.684285+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | uUJH/gsBcvBSag | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan for the Ohio Turnpike and Infrastructure Commission.
start_date
2026-03-01
extracted_at
2026-03-19T21:21:34.861238+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | jB+fMU8xoGvhog | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
project_name
Technology Strategic Plan
contact_person
Chief Information Officer
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-03-05T00:04:11.223850+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | 8jKZDzXCGFf0Pw | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan to guide enterprise-wide technology investments and organizational transformation.
start_date
2026-03-01
extracted_at
2026-03-05T06:04:31.287518+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | WB3MvqCYs6zaSQ | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
Chief Information Officer
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-03-05T12:04:57.114441+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | 8oVe2xPsKFSvEw | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
Chief Information Officer
contract_type
fixed_fee
hourly_rate
—
estimated_hours
160.0
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-03-21T02:05:26.717125+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | vilKA5ZThkwIMg | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
—
contract_type
—
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-03-23T02:05:25.702165+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | EY0Wb0CCxiPeWg | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan for the Ohio Turnpike and Infrastructure Commission.
start_date
2026-03-01
extracted_at
2026-03-24T02:05:21.837211+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | 5lsERYfgijGF5g | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan to guide enterprise-wide technology investments and organizational transformation.
start_date
—
extracted_at
2026-03-25T02:06:06.524139+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | ZD6Xak/kzMqZ0A | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan to guide enterprise-wide technology investments and organizational transformation.
start_date
2026-03-01
extracted_at
2026-03-29T02:05:10.608791+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | jcQ+Cgb1oZh6Ow | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan for the Ohio Turnpike and Infrastructure Commission.
start_date
2026-03-01
extracted_at
2026-04-02T02:05:25.992126+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | GOy84CPn/hRC2A | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
—
contract_type
—
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-04-08T02:05:30.741471+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | HBagMitiGAzxGQ | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
Chief Information Officer
contract_type
—
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-04-11T02:04:55.920947+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | Nuq4ddNP0GjFhQ | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan to guide enterprise-wide technology investments and organizational transformation.
start_date
—
extracted_at
2026-04-11T02:04:53.247281+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | lQk4K0ZM09U5bw | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
Chief Information Officer
contract_type
—
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-04-12T02:04:25.673707+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | HxfdJMsQ6h47DQ | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan to guide enterprise-wide technology investments and organizational transformation.
start_date
2026-03-01
extracted_at
2026-04-12T02:04:22.455606+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | 9siwyb8tAzo6Fw | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan for the Ohio Turnpike and Infrastructure Commission.
start_date
—
extracted_at
2026-04-13T02:05:04.646686+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | zn1BXetcquPydw | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
Chief Information Officer
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-04-13T02:05:07.677335+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | yXpFu6tUhqxPdA | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
project_name
Technology Strategic Plan
contact_person
Chief Information Officer
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-04-14T02:05:17.922703+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | YB1HqxWP4ApIuA | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan for the Ohio Turnpike and Infrastructure Commission.
start_date
—
extracted_at
2026-04-14T02:05:13.971202+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | QT866jAkSg2c9Q | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan to guide enterprise-wide technology investments and organizational transformation.
start_date
2026-03-01
extracted_at
2026-04-15T02:05:05.409008+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | V8cMsPAyAImf8g | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
—
contract_type
—
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-04-15T02:05:12.016917+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | 72Zj6nmw4EyWDg | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan to guide enterprise-wide technology investments and organizational transformation.
start_date
—
extracted_at
2026-03-27T02:05:44.552361+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | I2Q7oj8s2CP/nw | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan to guide enterprise-wide technology investments and organizational transformation.
start_date
2026-03-01
extracted_at
2026-03-22T02:04:54.140606+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | FJrymOr36WSXtg | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
—
contract_type
—
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-03-06T12:04:46.102478+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | rAbA+ZlD7xZQNg | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan for the Ohio Turnpike and Infrastructure Commission.
start_date
2026-03-01
extracted_at
2026-03-06T12:04:42.887519+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | V37kXis92+T8MA | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan for the Ohio Turnpike and Infrastructure Commission.
start_date
2026-03-01
extracted_at
2026-03-06T06:04:25.216459+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | itSmwaEToAnT0w | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan for the Ohio Turnpike and Infrastructure Commission.
start_date
2026-03-01
extracted_at
2026-03-06T02:04:51.730445+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | rsxun9POvfBeAg | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
Chief Information Officer
contract_type
—
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-03-05T02:05:01.577854+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | xxuxVKk0vH+Esw | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan to guide enterprise-wide technology investments and organizational transformation.
start_date
2026-03-01
extracted_at
2026-03-05T00:04:07.734906+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | mYgIk79V69ClDw | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan to guide enterprise-wide technology investments and organizational transformation.
start_date
—
extracted_at
2026-03-04T18:04:58.838886+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | PhVNmnOqMmKsLQ | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
Chief Information Officer
contract_type
—
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-03-20T02:05:10.292373+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | VcuX3FQlHd9y/Q | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
—
contract_type
—
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-03-19T21:21:37.535040+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | xJSd/PAKQbv4rA | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
Chief Information Officer
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-03-19T15:16:38.168070+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | JBxKra5duULxjA | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
Chief Information Officer
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-03-24T02:05:26.111340+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | k4YYnj77oUwwUw | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan to guide enterprise-wide technology investments and organizational transformation.
start_date
2026-03-01
extracted_at
2026-03-28T02:05:47.345469+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | FXrgL/u+6XuT3w | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan for the Ohio Turnpike and Infrastructure Commission.
start_date
2026-03-01
extracted_at
2026-04-06T02:05:20.382335+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | NYtRNEvq0SQHYw | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan to guide enterprise-wide technology investments and organizational transformation.
start_date
2026-03-01
extracted_at
2026-04-08T21:07:56.546193+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | 9h38NTy7TLGtHA | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan for the Ohio Turnpike and Infrastructure Commission.
start_date
2026-03-01
extracted_at
2026-04-08T02:05:27.667243+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | 9JBj2nckP61/zQ | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
Chief Information Officer
contract_type
—
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-04-09T13:58:50.481127+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | szsWLcDfZICClA | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan for the Ohio Turnpike and Infrastructure Commission.
start_date
2026-03-01
extracted_at
2026-04-10T02:05:35.002037+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | bAOZCRqbALJ3oQ | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
project_name
Technology Strategic Plan
contact_person
Chief Information Officer
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-04-10T02:05:38.401117+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | U9hVhVVcch8UEw | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan for the Ohio Turnpike and Infrastructure Commission.
start_date
—
extracted_at
2026-04-09T02:04:50.463429+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | BJ3T9RepYQbUxQ | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan to guide enterprise-wide technology investments and organizational transformation.
start_date
—
extracted_at
2026-04-07T02:05:36.074353+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | fTVBXrzu0FxYIA | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
Chief Information Officer
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-03-31T02:05:46.297191+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | 77NUeLX79OEdCg | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
Chief Information Officer
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-03-22T02:04:57.234481+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | 09isnbgvambOHg | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan for the Ohio Turnpike and Infrastructure Commission.
start_date
2026-03-01
extracted_at
2026-03-21T02:05:22.894608+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | 4FD8lYWQk4IXCQ | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
project_name
Technology Strategic Plan
contact_person
Chief Information Officer
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-03-06T00:04:46.619246+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | HTFOuI5lGSY+Fw | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
Chief Information Officer
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-03-06T02:04:55.026747+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | m51SLwN259qd+A | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
—
contract_type
—
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-03-04T18:05:02.391071+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | Hon4kSbwEAwEfQ | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan for the Ohio Turnpike and Infrastructure Commission.
start_date
2026-03-01
extracted_at
2026-03-05T12:04:51.888348+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | DSyqCEW2eLLjuQ | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan to guide enterprise-wide technology investments and organizational transformation.
start_date
2026-03-01
extracted_at
2026-03-05T02:04:58.656372+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | cUYdq2uce3B8rw | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
project_name
Technology Strategic Plan
contact_person
Chief Information Officer
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-03-06T06:04:28.038539+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | Q6VdVAehqNvm2g | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b33d2d8bf8eb663be79c5bcbb73ef803
file_name
Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BE3441C5B-B897-4BC1-84B3-4E9CE96CAC1E%7D&file=Oak_Knot_Holdings_RFP_4-2026_Technical_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Development of a comprehensive seven-year Technology Strategic Plan to guide enterprise-wide technology investments and organizational transformation.
start_date
2026-03-01
extracted_at
2026-03-23T02:05:21.353676+00:00
raw_text_preview
OAK KNOT HOLDINGS, LLC
TECHNOLOGY STRATEGIC PLAN
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
Submitted by:
Oak Knot Holdings, LLC
459 Rockwood Circle
Peninsula, Ohio 44264
March 2026
TABLE OF CONTENTS
1. Executive Summary
2. Understanding of the Scope of Work
3. Our Approach and Methodology
4. Project Timeline
5. Key Representatives
6. Relevant Experience and Capabilities
7. Financial Ability to Perform
8. Client References
9. Economic Presence in Ohio
10. No Exceptions or Deviations
1. EXECUTIVE SUMMARY
Oak Knot Holdings, LLC is honored to submit this proposal in response to the Ohio Turnpike and Infrastructure Commission (OTIC) Request for Proposal No. 4-2026 for the development of a comprehensive seven-year Technology Strategic Plan. As an Ohio-based company with an existing partnership with OTIC, we bring deep understanding of your operational needs, technology environment, and strategic objectives.
Our company has successfully provided GPS/Automatic Vehicle Location (AVL) systems and supported the modernization of critical database infrastructure for the Ohio Turnpike. This established relationship positions us uniquely to understand your challenges, opportunities, and the organizational context necessary to develop a truly actionable strategic technology roadmap.
The proposed 7-Year Technology Strategic Plan will provide OTIC with a comprehensive assessment of the current technology environment, a forward-looking vision for digital transformation, and a detailed gap analysis to guide investment decisions. Our approach emphasizes Data & Analytics, Enterprise Architecture, Innovation, cybersecurity, business process automation, and digital infrastructure--all critical to OTIC's mission of ensuring safe, efficient toll collection and infrastructure management.
Oak Knot Holdings assembles a talented team of software architects, IT consultants, transportation technology specialists, and strategic planners. Under the
file_created_at
2026-03-04T16:35:33+00:00
file_modified_at
2026-03-04T16:35:33+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | QNAKj5Nn9q9OFw | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
Chief Information Officer
contract_type
—
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-03-25T02:06:10.356494+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | JX5HkGeESJrAug | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
—
contract_type
—
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-03-28T02:05:50.461304+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | gK3jJKICZmJYoA | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
Chief Information Officer
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-04-07T02:05:42.117084+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | ONuNGfWS7whnMw | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
Chief Information Officer
contract_type
—
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-04-09T02:04:54.444885+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | MBCjLrUuMOO3UA | Technology Strategic Plan | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
5554701a31083f79921399a76fd2f549
file_name
RFP No. 4-2026 Technology Strategic Plan - FINAL.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Ohio%20Turnpike/RFP%20No.%204-2026%20Technology%20Strategic%20Plan%20-%20FINAL.pdf
company
Ohio Turnpike and Infrastructure Commission
project_name
Technology Strategic Plan
contact_person
Chief Information Officer
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Develop a 7-year Technology Strategic Plan.
start_date
—
extracted_at
2026-04-05T02:05:11.820259+00:00
raw_text_preview
i
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
682 Prospect Street
Berea, Ohio 44017
(440) 971-2081
REQUEST FOR PROPOSALS
TO SELECT A CONSULTANT TO DEVELOP A TECHNOLOGY
STRATEGIC PLAN
RFP No. 4 -2026
ISSUE DATE: February 25, 2026
INQUIRY END DATE: 5:00 PM (Eastern) on March 11, 2026
PROPOSAL DUE DATE:
5:00 PM (Eastern) on March 25, 2026
(Late proposals will not be considered)
COMMISSION MEETING: May 18, 2026 (subject to change)
THE SBE GOAL FOR THIS CONTRACT IS WAIVED
ii
TABLE OF CONTENTS
BACKGROUND INFORMATION ..................................................................................................... 1
ASSISTANCE FROM COMMISSION PERSONNEL ....................................................................... 1
TECHNICAL PROPOSAL REQUIREMENTS ................................................................................... 1
PRICING PROPOSAL ......................................................................................................................... 2
FORM TECHNOLOGY STRATEGIC PLAN SERVICES CONTRACT
REQUIREMENTS ............................................................................................................................... 2
PROPOSAL SUBMISSION REQUIREMENTS ................................................................................. 2
INQUIRY SUBMISSION INSTRUCTIONS ....................................................................................... 3
PROPOSAL SUBMISSION INSTRUCTIONS ................................................................................... 3
EVALUATION OF PROPOSALS ....................................................................................................... 3
OFFICE OF OPPORTUNITY AND INCLUSION .............................................................................. 5
DEVIATIONS, EXCEPTIONS AND ADDENDA TO THE RFP ...................................................... 5
file_created_at
2026-03-04T15:22:15+00:00
file_modified_at
2026-03-04T15:22:12+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | yOwVfCl7x2vSXQ | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-04-01T02:06:07.533964+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | 0wWZt9JC9NF2kg | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-03-05T06:04:28.860944+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | IA+9mQp31ITmGw | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-03-26T02:06:14.726751+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | YTgJWM0Ahxqtyg | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-03-23T02:05:18.712391+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | u/QUppxE1kG1dg | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-03-05T02:04:56.055442+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | nIj1hz8EmIp0fw | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-04-15T02:05:01.746881+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | ecA7fGopjfD3+w | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-04-12T02:04:20.299469+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | B6+tg1zXAbiuxQ | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-03-06T00:04:40.372496+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | OcBIZHUDf0X+iw | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-03-06T02:04:48.611601+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | 4WPPX67g9fdeOw | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-03-06T12:04:40.075477+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | 5Nebm1t7MD9zJw | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-04-07T02:05:32.370758+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | BpvtKeD6xMbyQA | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-03-25T02:06:03.455322+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | Nh/R8UrfaOppRw | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-03-28T02:05:44.395825+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | qSSNWA6I5eXF+Q | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-04-09T02:04:47.283912+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | dxnXTnbGHVzypg | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-04-10T02:05:32.483445+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | 7+9dSK4CbkV9Lw | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-04-08T02:05:24.795331+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | 3tcWPhi0mnHoPQ | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-03-20T02:05:04.412139+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | s2mXFaLQUpC0Pw | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-04-08T21:07:54.237495+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | Z2xnZnEGDg4jMw | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-03-19T21:21:32.579516+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | JJqnbIBUXUzUpg | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-03-05T00:04:05.013797+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | +yaOgV+v/vxpnw | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-04-11T02:04:50.337063+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | dgkfzWIKcfjL6Q | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-03-29T02:05:07.905134+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | YkRwXfhta0GkaA | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-04-05T02:05:06.615068+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | FPc4Uf0Sb/N3ZQ | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-04-06T02:05:17.368502+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | fSLVP/lukNQWEw | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-04-04T02:05:32.609108+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | uzrS6LBbcMcfQg | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-04-13T02:05:02.018152+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | oShMCyVDK8yHeQ | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-04-03T02:05:00.380621+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | b4HwdBBwkGFYIw | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-04-02T02:05:22.978121+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | KSe0XitYfqA+Rg | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-03-27T02:05:40.603504+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | ovzSvyyT2wZPdg | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-03-24T02:05:19.028986+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | 875Iv6R/o9fjrQ | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-03-31T02:05:37.444546+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | OWy0nPTLON4MCg | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-04-09T13:58:45.742544+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | bsN8MxzCkpoXpw | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-03-30T02:06:11.068484+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | DEv0fykPI/2xvA | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-03-21T02:05:20.029223+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | eW7bghxqBdQzqg | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-04-14T02:05:11.755444+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | VcrDX62S6xVjGQ | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-03-22T02:04:51.367323+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | xDEXTbJ2E449xA | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-03-06T06:04:23.199148+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | KFiV+lqflPuKRQ | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-03-19T15:16:31.688075+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | 8sXiEKQmC2ayUQ | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-03-05T12:04:48.518663+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | V/TGWvj+6rfInw | Development of a Technology Strategic Plan | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a822a45b470c84e3c5f20bfb7f20614d
file_name
Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF5860E8B-C60F-478A-B461-C437D69643F3%7D&file=Oak_Knot_Holdings_RFP_4-2026_Pricing_Proposal.docx&action=default&mobileredirect=true
company
Ohio Turnpike and Infrastructure Commission
project_name
Development of a Technology Strategic Plan
contact_person
John M. Lurtz II
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
300000.0
brief_project_description
Development of a Technology Strategic Plan
start_date
—
extracted_at
2026-03-04T18:04:55.384833+00:00
raw_text_preview
APPENDIX B
PRICING PROPOSAL
Development of a Technology Strategic Plan
Response to
Ohio Turnpike and Infrastructure Commission
RFP No. 4-2026
PRICING SUMMARY
This contract will be subject to a contract not-to-exceed amount of $300,000.
ESTIMATED HOURS BY PHASE
The following table details the estimated hours allocation by project phase:
SUBMITTED BY
Responding Firm: Oak Knot Holdings, LLC
Name: John M. Lurtz II
Title: CEO
Date: March 25, 2026
_________________________________
John M. Lurtz II, CEO
Oak Knot Holdings, LLC
file_created_at
2026-03-04T16:36:31+00:00
file_modified_at
2026-03-04T16:36:31+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||