Thompson – Addition with Existing Mudroom/Laundry & Primary Bathroom Renovation
project
394a69e6df08f66b
Normalized: thompson addition with existing mudroom laundry and primary bathroom renovation
moreland_contracts
25%
Separation Confidence
How distinct this entity is from others. Higher means no close matches existed when it was created. Lower means a near-match was rejected just below the 80% threshold — worth reviewing.
Low — a near-match was rejected, review recommended
90%
Avg Match Confidence
The average confidence score across all active source mappings. Shows overall quality of linkage between source records and this canonical entity.
Good match quality
Source Mappings (2)
| Source | Source ID | Display Name | Confidence | Method | Status | Actions | |
|---|---|---|---|---|---|---|---|
| moreland_contracts | f96d3ea02dd2dfc048f6d489590fdb1e | Thompson – Addition with Existing Mudroom/Laundry & Primary Bathroom Renovation | 1.00 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
f96d3ea02dd2dfc048f6d489590fdb1e
file_name
Carpenter Quote - SOW - Thompson - 8.16.25.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BF1834126-844B-42B9-9A5D-329B85B8A313%7D&file=Carpenter%20Quote%20-%20SOW%20-%20Thompson%20-%208.16.25.docx&action=default&mobileredirect=true
company
Payne & Tompkins Design Renovations LLC
project_name
Thompson – Addition with Existing Mudroom/Laundry & Primary Bathroom Renovation
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
0.0
brief_project_description
Renovation project involving addition with existing mudroom/laundry and primary bathroom.
start_date
—
extracted_at
2026-07-24T02:29:49.027267+00:00
raw_text_preview
Thompson – Addition with Existing Mudroom/Laundry & Primary Bathroom Renovation
General Standard Best Practices Provided by Payne & Tompkins Design Renovations LLC
Project Preparation
Onsite walk-through with client to review site staging
Seal off rooms not being worked in
Seal off all ductwork openings to prevent any dust from migrating elsewhere in the home
Make certain dumpster is on boards to protect driveway
Install lockbox with key on homeowner approved door
Provide Portable commode
Project Close-out
Conduct final walk-through with Owner
Test all outlets, confirm hot cold faucet orientation as needed
Remove any packing materials, protective coatings on any finish items
Clean entire work area with professional cleaning company
Clean all windows, glass doors, shower doors, or mirrors
Broom clean and mop unfinished areas
Remove Portable commode
Remove Dumpster
Exterior Scope of Work
Specific work area starting and ending points (use pictures to clarify):
Start: Basement Entrance on North side
Stop: New addition on South side
Work outside of this area will be defined and priced on a change order
Utilities
Electrical
Install North basement entry light per plans.
Storm water waste
Supply and install new 4” SDR35 to new downspout locations
Sanitary waste
No exterior scope.
Domestic water supply
No scope, utilize existing main supply line to house
Natural Gas
No scope of work at exterior.
Demo
Please understand that while our trade partners are skilled professionals, we cannot guarantee the preservation of items for reuse. The suitability of items for repurposing depends on factors like materials, wear and tear, and installation. PTDR is not liable for the replacement of damaged items during removal, such as countertops, toilets, garbage disposals, faucets, and similar items.
Demo existing basement North entry and stairwell per plans roof structure only $1200
Demo existing South siding, walls, and roofing per plans $2800
Excavation/Sitework
During ex
file_created_at
2026-07-23T12:45:44+00:00
file_modified_at
2026-07-23T12:45:44+00:00
created_by
Dean Tompkins
modified_by
Dean Tompkins
_dlt_meta
—
|
|||||||
| moreland_contracts | b0b0918c394f283a3baeb7cda5c85315 | THOMPSON ADDITION | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b0b0918c394f283a3baeb7cda5c85315
file_name
Poured Walls - Poured Walls of Ohio - Thompson - 4328_merged (1).pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Payne%20Tompkins/Payne%20%26%20Tompkins%20Upload/Thompson,%20Christy%20(Daughter)%20%26%20Sue%20(Mother)/02%20Quotes/07%20Excavation/Poured%20Walls%20-%20Poured%20Walls%20of%20Ohio%20-%20Thompson%20-%204328_merged%20(1).pdf
company
PAYNE & TOMPKINS
project_name
THOMPSON ADDITION
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Poured foundations and related concrete work for the Thompson Addition project.
start_date
—
extracted_at
2026-07-24T02:29:46.981879+00:00
raw_text_preview
Estimate
Date
8/18/2025Estimate #
4328
Name / Address
PAYNE & TOMPKINS
10690 MAYFIELD RD
CHARDON, OH 44024Poured Foundations of Ohio
3415 Wrangle Hill Rd
Suite #1
Bear, DE 19701
LOT
9850Project / Development
PECK RD MANTUAHouse Type
THOMPSON ADDITION
THANK YOU FOR YOUR BUSINESS!
TotalDescription Qty Rate Total
PROPOSAL IS VALID FOR 60 DAYS
1) POUR FOOTINGS W/2 ROWS OF #5 REBAR - 3000 PSI
DRILL,DOWEL, GLUE EXISTING FOOTING 1
16"W X 8"D FOOTING 132
36" X 36" X 12" PAD 5
#5 REBAR (2) ROWS ALL FOOTINGS 294
FUEL SURCHARGE FROM CONCRETE PLANT 1
PUMP FOOTINGS WITH BOOM PUMP 1
SUBTOTAL 5,999.10 5,999.10
2) 4" SDR-35 PVC FOOTING DRAIN
EXTERIOR DRAIN ONLY AT NEW ADDITION 132
(2) DRAIN CLEAN-OUTS & OUTLET CONNECTION 20
SUBTOTAL 912.00 912.00
3) STONE BASE FOR CRAWL-SPACE & FOOTING DRAIN
LOADS OF STONE W/SLINGER TRUCK ~20 TONS EACH 2
SUBTOTAL 1,850.00 1,850.00
4) POUR FOUNDATION - 4000 PSI
DRILL,DOWEL,GLUE EXISTING FOUNDATION 1
4' X 8" WALL - ADDITION 132
#6 REBAR - VERTICAL - 36" O.C. 198
#4 REBAR - HORIZONTAL - 2 ROWS 294
FUEL SURCHARGE FROM CONCRETE PLANT 2
PUMP WALLS WITH BOOM PUMP 1
SUBTOTAL 9,114.70 9,114.70
5) WATERPROOF FOUNDATION W/MAR-FLEX 5000
WATERPROOFING SPRAY MEMBRANE ONLY 462
SUBTOTAL 623.70 623.70
Page 1
Estimate
Date
8/18/2025Estimate #
4328
Name / Address
PAYNE & TOMPKINS
10690 MAYFIELD RD
CHARDON, OH 44024Poured Foundations of Ohio
3415 Wrangle Hill Rd
Suite #1
Bear, DE 19701
LOT
9850Project / Development
PECK RD MANTUAHouse Type
THOMPSON ADDITION
THANK YOU FOR YOUR BUSINESS!
TotalDescription Qty Rate Total
6) POUR 3" SLAB ON EXISTING 4" STONE - W/FIBER MESH
4000 PSI
3" SLAB W/FIBER / 6 MIL POLY 1,215
EXPANSION FOAM 1
SAW CUT CONTROL JOINTS 1
FUEL SURCHARGE FROM CONCRETE PLANT 2
PUMP SLABS WITH BOOM PUMP 1
file_created_at
2026-07-23T12:45:44+00:00
file_modified_at
2026-07-23T12:45:44+00:00
created_by
Dean Tompkins
modified_by
Dean Tompkins
_dlt_meta
—
|
|||||||