Payne & Tompkins Design
project
5e16e74f177b3b78
Normalized: payne and tompkins design
moreland_contracts
33%
Separation Confidence
How distinct this entity is from others. Higher means no close matches existed when it was created. Lower means a near-match was rejected just below the 80% threshold — worth reviewing.
Moderate — a somewhat similar entity exists
100%
Avg Match Confidence
The average confidence score across all active source mappings. Shows overall quality of linkage between source records and this canonical entity.
Strong source linkage
Source Mappings (1)
| Source | Source ID | Display Name | Confidence | Method | Status | Actions | |
|---|---|---|---|---|---|---|---|
| moreland_contracts | cd6302f9c11e76355157f8a5436a8ea9 | Payne & Tompkins Design | 1.00 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
cd6302f9c11e76355157f8a5436a8ea9
file_name
PTR Thompson SOW $$ 7-22-25.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Payne%20Tompkins/Payne%20%26%20Tompkins%20Upload/Thompson,%20Christy%20(Daughter)%20%26%20Sue%20(Mother)/02%20Quotes/12%20Plumbing/PTR%20Thompson%20SOW%20$$%207-22-25.pdf
company
NCD CORSILLO PLUMBING , LLC
project_name
Payne & Tompkins Design
contact_person
Thompson
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Furnish all materials and labor necessary for the rough & finish plumbing.
start_date
—
extracted_at
2026-07-24T02:30:05.957805+00:00
raw_text_preview
NCD CORSILLO PLUMBING , LLC
234 5TH AVENUE / CHARDON , OHIO 44024 / (440) 442-0100
PROPOSAL
Thompson
9850 Peck Road
Payne & Tompkins Design - $
Assume crawl space
is a min 36" NCD Corsillo Plumbing , LLC herby submits the follow quote to furnish all
materials and labor necessary for the rough & finish plumbing for :
per scope of work provided 500.00$
Permit ,Inspections & Destination fees for the following jurisdiction : 285.00$
Portage Co Health 190.00$
Additional cost for labor may
incur upon fixture selections Plumbing fixtures supplied by GC
0.25 NCD to demo water & DWV lines as required for new plumbing 600.00$ 150.00$
6.5 All water lines to be Zurn PEX & installed via Trunk & Branch system 400.00$ 2,600.00$
6.5 DWV lines to be Schedule 40 PVC pipe for above and below grade 485.00$ 3,152.50$
All interior excavation to be performed by NCD
6 Est. 6' Remove and patch concrete to accommodate plumbing 70.00$ 420.00$
Backfill with stone supplied by GC and spoils to remain on site or in basement.
Note, all back fill completed by concrete contractor upon prepping basement prior to pouring.
Additional cost if jackhammer and/or additional labor is required to excavate depending on ground conditions or size of underground.
Existing HWT Tank-
80 gal Hybrid Heat
Pump HOT WATER TANK
1 New addition only Circ Pump (required by code if fixture is 50' plus feet away from HWT) 985.00$ 985.00$
80 80' Return Line - PEX (Basement / crawl only) $10 800.00$
1 Rework HWT for return line and Circ Pump 565.00$ 565.00$
160 160' Insulation Hot water lines - Armaflex up to 1" $4 560.00$
GAS - SERVICE
LP - Tank and
regulator by others All Exterior gas to be performed by others
Approx 177' of 1.25
gas pipe NCD to provide a 1.25" interior gas main 2,760.00 $
with gas connections as follows :
1 1-Co
file_created_at
2026-07-23T12:45:48+00:00
file_modified_at
2026-07-23T12:45:48+00:00
created_by
Dean Tompkins
modified_by
Dean Tompkins
_dlt_meta
—
|
|||||||