Warren Software Build (Phase 1)
project
5e1fb67a402f4b28
Normalized: warren software build phase 1
moreland_contracts
Entity Properties (gold project table)
project_id
5e1fb67a402f4b28
name
Warren Software Build (Phase 1)
client_id
—
canonical_metadata
—
created_at
2026-02-12 05:36:54.288209+00:00
updated_at
2026-02-12 05:36:54.288209+00:00
status
—
billable
—
recurring
—
squad
—
qa_partner
—
project_manager
—
lead_dev
—
description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
state
—
team_name
—
closedate
—
dealstage
—
contract_type
time_and_materials
contract_hourly_rate
165.0
contract_estimated_hours
1325.0
contract_total_fee
218625.0
46%
Separation Confidence
How distinct this entity is from others. Higher means no close matches existed when it was created. Lower means a near-match was rejected just below the 80% threshold — worth reviewing.
Moderate — a somewhat similar entity exists
100%
Avg Match Confidence
The average confidence score across all active source mappings. Shows overall quality of linkage between source records and this canonical entity.
Strong source linkage
Source Mappings (99)
| Source | Source ID | Display Name | Confidence | Method | Status | Actions | |
|---|---|---|---|---|---|---|---|
| moreland_contracts | I/FMqiUPrthf9A | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-04-08T02:09:27.563962+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | mz9qlqB1Gc3NgA | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-04-04T02:09:44.200319+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | 3kHK8eu8n2ZfGw | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-04-03T02:09:03.541628+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | voe6F4S9u/psOw | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-03-22T02:08:32.606448+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | jyhgQ/I0i5hgpA | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218250.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-03-05T12:09:03.393926+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | elMuaA8Yx1OjCw | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-03-04T06:10:43.063804+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | z9TPykRqIcnqbQ | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-03-03T00:07:42.425569+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | 5IThyGte3qSVGQ | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-03-04T18:09:07.047124+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | NlNyZ/Mf27qY2A | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-25T06:08:58.790782+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | be9vZRHYEWT8JQ | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-24T12:08:10.481879+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | B604wECzdy2SQQ | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-21T06:08:29.929275+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | v+XpbgaavMpRow | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-19T03:12:21.044302+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | BE4H4/oVibsIvw | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-20T12:08:27.178533+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | iwA/fRMRjBInhw | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-20T06:08:32.472539+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | 7U3ziJg5/heIVw | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-24T18:08:52.328794+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | x0Pjx55fi+R6+Q | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-03-02T18:07:57.792786+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | NWm+MDaHvNSSkg | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-03-05T06:08:03.528185+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | hURrvi92Eg4kMw | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-03-06T00:07:55.568415+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | 46+dBPpSL+tZLg | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-03-19T21:25:26.466078+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | Ljh86M+GpBfA7Q | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-04-06T02:09:14.326916+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | KTY7RXKOcOEqIQ | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-04-05T02:08:53.377010+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | OiERQWxNPSjM/A | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-04-02T02:09:34.769423+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | QcBMOVU71XB0EQ | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-03-31T02:10:01.572503+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | uWLFTjQYGLF6Hg | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-03-21T02:09:44.202200+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | HcoLPATneV41Lw | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-03-04T02:09:06.001350+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | AkczBs28Y80vwg | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-03-04T00:09:04.832941+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | +H7Z6xt7JFD++Q | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-26T00:08:48.286163+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | +26guAUkL7C/Jg | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-23T12:08:34.204924+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | UPcNtxqm6b/J2g | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-24T02:09:13.865854+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | xjE2EY1JwMabDg | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-20T18:07:52.854755+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | 5xAnbCKVX3Qb4Q | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-20T02:09:18.794525+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | kZOyyJlsm/TbiA | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-21T00:09:29.355347+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | k5KKm19dVOOwvg | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-19T12:08:49.001160+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | V9hcqPaP7E3YCA | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-22T06:07:28.820712+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | mpn4jSx0FAljlQ | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-03-02T17:52:11.350254+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | k2z/bHUhd+kWtw | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-03-03T18:09:08.654668+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | f3q/BOsUzva+ZQ | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-03-20T02:08:30.152199+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | ++xh92mceYUFGQ | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-03-19T15:20:22.079990+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | C5cW0WrTEXQKbA | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-04-07T02:10:25.529750+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | E2TVGCtSp/CU3w | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-04-10T02:09:23.357766+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | wuHY/0BJIfcWzw | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-04-09T02:08:05.877344+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | AUqBFBCs5V0A5w | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-03-27T02:09:46.310268+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | GOGOT9cDYhH6+A | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-03-26T02:10:44.631845+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | +xo1WnmJYJG5DQ | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-03-03T12:06:48.969586+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | GIyJ2ADAQ9XNug | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-03-03T02:09:01.104065+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | 2H09V4bMwVnafg | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-26T12:09:44.915653+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | +oTY7w32l+ZiMw | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-26T02:08:45.175659+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | N/6kggctTlBoKg | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-24T06:08:29.981216+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | j9KR5cYlFRJpOg | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-25T00:07:56.681978+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | NacjIq6liJd2/Q | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-24T00:08:14.826251+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | LwsCwskRwigGlQ | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-23T00:10:19.199209+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | kcRCnso/tS1Sug | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-21T12:08:16.977084+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | IhDwBBg3PuXO4w | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-19T03:14:28.762823+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | /fl22tX6uFvCaQ | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-25T12:08:46.045170+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | Y1tSiO4Cm5EjDQ | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-25T02:08:14.901890+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | 98l2l9cYmqndMw | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-03-05T00:07:13.971103+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | 63kjv2OtdEDvAg | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-03-23T02:09:27.482997+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | oTWB6rKm+C9CQA | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-03-25T02:10:53.746120+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | m/E0clG3KXMXTQ | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-03-28T02:09:58.595363+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | Vs1oTD+0r00C6A | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-03-29T02:08:43.378846+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | xu9A+gsEBtTzIA | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-03-30T02:10:15.528411+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | g6D1X9a0WWt0yQ | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-03-06T06:07:49.594181+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | SX6UOVIfS6sf4A | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-03-04T12:08:35.143209+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | JsHKoBkGaddQHg | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-26T18:08:49.493259+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | fIB1YX2R+5G7sA | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-25T18:09:17.499177+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | EjOAvr01H624ig | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-23T06:10:11.302446+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | njzYeb1BTR7U3g | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-19T06:08:56.372016+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | q8o4Y2uhTHiZQQ | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-20T00:07:24.902787+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | 8QQay3xyuW44Lg | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-22T02:08:17.785056+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | rGrYI6U4S8Ou4w | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-21T02:09:02.024152+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | AjXEHJlBEZbvlw | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-22T12:08:12.113066+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | Vg8xrtfMCsCE/g | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-19T18:08:51.827112+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | v9eHtVqV5jntyw | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-22T00:07:51.203665+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | xMAPCanlforfHA | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-21T18:08:31.991505+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | ip/bUqtYyVYjuw | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-23T18:09:16.980756+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | v8RbdPdZqhlKIA | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-02-23T02:08:52.723634+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | 7ws1W7lmr4oawQ | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-03-03T06:08:01.140207+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | lhKBfhdRywyCtA | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-03-02T17:52:01.581153+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | 5iweUA/WN0GVQA | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-03-05T02:08:26.697893+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | b59TQpWeTix0EQ | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-03-06T02:08:28.920511+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | ItEKzumImZeFtQ | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-03-06T12:08:04.664862+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | tnzJND5qJVNmjQ | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-03-24T02:09:14.475204+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | 69jRQ7/CqaoPKg | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218250.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-04-01T02:10:45.471048+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | u4+3c4ct3Lg8EQ | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-04-08T21:11:09.852593+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | NmJn27kRr04YzQ | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218250.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-04-11T02:08:16.281986+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | A8msT9VzRZDsaw | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-04-12T02:07:32.628212+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | nohjoOwlkpWDyw | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-04-23T02:09:05.555550+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | SwR5wNQWpjKalA | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-04-13T02:08:49.130798+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | vLfCXe5S3eqv1A | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-04-14T02:08:40.415191+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | oH43wTpiVbLsow | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-04-15T02:08:25.739407+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | waFlaolPLoZS+g | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218250.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-04-16T02:09:08.935586+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | E6tgWvNVzCLkdg | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-04-17T02:08:31.707656+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | BEt9LEkodDltIw | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-04-18T02:08:45.524792+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | NTGruuaCh7LKXA | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-04-19T02:07:30.599196+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | rsaG1VON8vxPbA | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-04-20T02:08:59.666193+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | jOtMcDP1mo81HA | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-04-21T02:08:45.168838+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | UIPQiQUQaRZmgg | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-04-22T02:09:15.956093+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | H3XDlpgRAtQ/Qw | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-04-24T02:09:25.733129+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||
| moreland_contracts | Begf2RsDUs1HfA | Warren Software Build (Phase 1) | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b9e60f4e7ec38ff6cd0d17127a0b2b98
file_name
Warren - Moreland Arrangement Letter - Software Build (Phase 1).docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9E41C4D6-FE80-455C-B693-BFE74D4D047D%7D&file=Warren%20-%20Moreland%20Arrangement%20Letter%20-%20Software%20Build%20(Phase%201).docx&action=default&mobileredirect=true
company
Warren Roofing and Insulating Company
project_name
Warren Software Build (Phase 1)
contact_person
Trevor Cost
contract_type
time_and_materials
hourly_rate
165.0
estimated_hours
1325.0
total_fee_estimate
218625.0
brief_project_description
Assistance with the design, development, testing, and implementation of custom software to support business operations.
start_date
2021-03-16
extracted_at
2026-04-09T14:02:23.628414+00:00
raw_text_preview
March 16, 2021
Trevor Cost
President
Warren Roofing and Insulating Company
7015 Krick Road
Walton Hills, OH 44146
Re: Warren Software Build (Phase 1)
Dear Trevor:
MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the "Services") to assist Warren Roofing and Insulating Company (“Warren”) with the design, development, testing, implementation of custom software to support business operations for the business (the "Project").
Background
Warren Roofing is the premier commercial roofing contractor in Cleveland. Warren provides professional commercial roofing installation, repair, and maintenance services to an extensive industrial and commercial client base across Northeast Ohio.
In the first quarter of 2021, Moreland worked with the Warren team to create a comprehensive plan (“BSAR Plan”) for improving business software systems and replacing the current implementation of MS-Excel, manual processes, and significant portions of the FCS software.
In following the BSAR Plan, Warren has asked Moreland to provide assistance for the first phase of custom software design, build, test, and implementation to support quality, safety, scheduling, and job management functions.
Project Activities, Scope, and Approach
Project Activities
Moreland will assist Warren in the delivery of the Project. Moreland will work with the Warren project team to complete project activities described below:
Application Design
Database Design and Build
Development and Unit Test
System, Integration, and User Acceptance Testing
Go-live Support
Project Management
Project Scope
The Phase 1 software is expected to provide the following functions:
Quality/Safety Module
Safety management
Job closure and integration with Foundation
Job Execution Module
Job import from quotes
Time tracking and submission
Production progress (photos, quality question forms, GEO location, sketch tool, materials)
Scheduling Module
Schedule
file_created_at
2025-06-20T20:54:38+00:00
file_modified_at
2025-06-20T20:54:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
—
|
|||||||