Home Addition
project
7447b94b8bdf13ee
Normalized: home addition
moreland_contracts
47%
Separation Confidence
How distinct this entity is from others. Higher means no close matches existed when it was created. Lower means a near-match was rejected just below the 80% threshold — worth reviewing.
Moderate — a somewhat similar entity exists
94%
Avg Match Confidence
The average confidence score across all active source mappings. Shows overall quality of linkage between source records and this canonical entity.
Good match quality
Source Mappings (10)
| Source | Source ID | Display Name | Confidence | Method | Status | Actions | |
|---|---|---|---|---|---|---|---|
| moreland_contracts | b2689aeba6b9d14dcd2f32af7866a2d5 | Home Addition | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
b2689aeba6b9d14dcd2f32af7866a2d5
file_name
80% Complete - Proposal & Allowance Schedule - Thompson - 8.14.25.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Payne%20Tompkins/Payne%20%26%20Tompkins%20Upload/Thompson,%20Christy%20(Daughter)%20%26%20Sue%20(Mother)/01%20Contract%20Documents/80%25%20Complete%20-%20Proposal%20%26%20Allowance%20Schedule%20-%20Thompson%20-%208.14.25.pdf
company
The Thompson Residence
project_name
Home Addition
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
756778.0
brief_project_description
Existing Home Renovation; Primary Bathroom/Mudroom & Laundry Room
start_date
2025-08-15
extracted_at
2026-07-24T02:25:50.673216+00:00
raw_text_preview
Date: 8/15/2025
Low High
• 631,323 $ - 697,778 $
Difference
•Window Allowance 9,072 $ (1,276) $
•
•
•Door Allowance 4,400 $ (136) $
•
•Plumbing Fixture Allowance 6,700 $ (4,324) $
•Lighting Fixture Allowance 1,250 $ (854) $
•Closet Allowance 3,000 $ 915 $
•
•
•Bath Accessories Allowance 400 $ 585 $
•Cabinet Allowance 19,850 $ 4,535 $
•
•
••
•Countertops & Solid Surface Allowance 2,910 $ 2,338 $
•Knobs and Pulls Allowance 510 $ 595 $
•Mirror/Shower Doors Allowance 1,700 $ (1,770) $
•Appliance Allowance - $
•
•Vinyl/Laminate Allowance 8,750 $
•Tile Allowance 400 $
607 $
Low High
• 300 $ - 800 $
• 11,493 $ - 14,047 $
• 10,200 $ - 10,200 $ The Thompson Residence
Based on Plans Dated: 8.11.25Address: 9850 Peck Rd. Mantua, OH
The information below will change as select ions are finalized and plans are approved
Permit Fees at Cost (Required)
Add Live Reverse Gable w/WindowHalf Bath Added*All materials below assumes waste, tax, and freight/shipping costs.
Provided by Homeowner.80% Pricing Complete
Home Addition:
Home Addition:
Allowances for Base Project #1
Associated Options to Base Project #1:Stock Cabinets, Includes Storage RoomAll Construction Closet System
Custom Built Cabinets per design would be
an additional $14,392Harvey Vinyl Windows
Marvin Essential Fiberglass Windows would
be an additional $3,100
Front, Rear, Garage Entry Doors w/Emtek
Satin Nickel Hardware
Total Allowance Difference:Custom Built Cabinets in Storage Room
would be an additional $6,674
Custom Built Cabinets at Ramp would be an
additional $3,290
Custom Built Cabinets at Kitchen, Laundry,
Bath, Front Bench would be an additional $9,
file_created_at
2026-07-23T12:44:03+00:00
file_modified_at
2026-07-23T12:44:03+00:00
created_by
Dean Tompkins
modified_by
Dean Tompkins
_dlt_meta
—
|
|||||||
| moreland_contracts | 4fe0b786536333680f7fe90aa3e25ace | Home Addition | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
4fe0b786536333680f7fe90aa3e25ace
file_name
65% Complete - Proposal & Allowance Schedule - Thompson - 8.8.25.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Payne%20Tompkins/Payne%20%26%20Tompkins%20Upload/Thompson,%20Christy%20(Daughter)%20%26%20Sue%20(Mother)/01%20Contract%20Documents/65%25%20Complete%20-%20Proposal%20%26%20Allowance%20Schedule%20-%20Thompson%20-%208.8.25.pdf
company
The Thompson Residence
project_name
Home Addition
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
750147.0
brief_project_description
Home addition including various allowances for fixtures and renovations.
start_date
—
extracted_at
2026-07-24T02:25:48.952134+00:00
raw_text_preview
Date: 8/8/2025
Low High
• 623,419 $ - 689,042 $
Difference
•Window Allowance 9,072 $
•Door Allowance 4,400 $
•Plumbing Fixture Allowance 6,700 $ (4,628) $
•Lighting Fixture Allowance 1,250 $ (1,209) $
•Closet Allowance 3,000 $
•Bath Accessories Allowance 400 $ 585 $
•Cabinet Allowance 19,850 $ 4,535 $
•
•
•Countertops & Solid Surface Allowance 2,910 $ 2,338 $
•Knobs and Pulls Allowance 510 $ 595 $
•Mirror/Shower Doors Allowance 1,700 $ (1,770) $
•Appliance Allowance - $
•
•Vinyl/Laminate Allowance 8,750 $
•Tile Allowance 400 $
445 $
Low High
• 300 $ - 800 $
• 11,493 $ - 14,047 $
• 11,079 $ - 13,541 $
•
• Kitchen Tape Lights 900 $ - 900 $
• Laundry Tape Lights 900 $ - 900 $
• Storage Hall Tape Lights 900 $ - 900 $
• Ramp Lighting TBD - TBD
• TBD - TBD
• TBD - TBD
• TBD - TBD
22,872 $ 28,388 $
646,736 $ - 717,875 $ Home Addition:
Allowances for Base Project #1
Associated Options to Base Project #1:
Total Cost of Selected Options:
Summation of Costs (Base Project #1 + Allowances + Selected Options): Storage Hall Custom Built Cabinets with Tops
New Back Entry CabinetsStock Cabinets, Includes Storage Room
Pending Custom Cabinet Quote
Custom Dining CabinetThe Thompson Residence
Based on Plans Dated: 8.8.25
Total Allowance Difference:Address: 9850 Peck Rd. Mantua, OH
The information below will change as select ions are finalized and plans are approved
Permit Fees at Cost (Required)
Add Live Reverse Gable w/WindowHalf Bath Added*All materials below assumes waste, tax, and freight/shipping costs.
Provided by Homeowner.
Premade vanity, sin
file_created_at
2026-07-23T12:44:03+00:00
file_modified_at
2026-07-23T12:44:03+00:00
created_by
Dean Tompkins
modified_by
Dean Tompkins
_dlt_meta
—
|
|||||||
| moreland_contracts | ae48d3ca684e95b688d11f516610e9b3 | Home Addition | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
ae48d3ca684e95b688d11f516610e9b3
file_name
98% Complete - Proposal & Allowance Schedule - Thompson - 8.22.25.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Payne%20Tompkins/Payne%20%26%20Tompkins%20Upload/Thompson,%20Christy%20(Daughter)%20%26%20Sue%20(Mother)/01%20Contract%20Documents/98%25%20Complete%20-%20Proposal%20%26%20Allowance%20Schedule%20-%20Thompson%20-%208.22.25.pdf
company
The Thompson Residence
project_name
Home Addition
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
820030.0
brief_project_description
Existing Home Renovation; Primary Bathroom/Mudroom & Laundry Room
start_date
—
extracted_at
2026-07-24T02:25:52.551365+00:00
raw_text_preview
Date: 8/22/2025
• 684,450 $
•
Difference
•Window Allowance 9,072 $ (1,276) $
•
•
•Door Allowance 4,400 $ (136) $
•
•Plumbing Fixture Allowance 6,700 $ (4,324) $
•Lighting Fixture Allowance 1,250 $ (854) $
•Closet Allowance 3,000 $ 915 $
•
•
•Bath Accessories Allowance 400 $ 585 $
•Cabinet Allowance 19,850 $ 4,535 $
•
•
••
•Countertops & Solid Surface Allowance 2,910 $ 2,338 $
•Knobs and Pulls Allowance 510 $ 595 $
•Mirror/Shower Doors Allowance 1,700 $ (1,770) $
•Appliance Allowance - $
•
•Vinyl/Laminate Allowance 8,750 $ (1,478) $
•Tile Allowance 400 $ 2,944 $
2,073 $
Low High
• 552 $
• 11,493 $ - 14,047 $ Includes approx. 177' of 1.25" gas line
All Construction Closet System
Custom Built Cabinets per design would be
an additional $14,392Harvey Vinyl Windows
Marvin Essential Fiberglass Windows would
be an additional $3,100
Front, Rear, Garage Entry Doors w/Emtek
Satin Nickel Hardware
Total Allowance Difference:Custom Built Cabinets in Storage Room
would be an additional $6,674
Custom Built Cabinets at Ramp would be an
additional $3,290
Custom Built Cabinets at Kitchen, Laundry,
Bath, Front Bench would be an additional $9,405Stock Cabinets, Includes Storage RoomThe Thompson Residence
Based on Plans Dated: 8.20.25Address: 9850 Peck Rd. Mantua, OH
The information below will change as select ions are finalized and plans are approved
Permit Fees at Cost (Required)
Add Live Reverse Gable w/Window*All materials below assumes waste, tax, and freight/shipping costs.
Provided by Homeowner.98% Pricing Complete
Home Addition:
Home Addition:
Allowances for Base Project #1
Associated Options to Base Project #1:
• 10,200 $
file_created_at
2026-07-23T12:44:03+00:00
file_modified_at
2026-07-23T12:44:03+00:00
created_by
Dean Tompkins
modified_by
Dean Tompkins
_dlt_meta
—
|
|||||||
| moreland_contracts | 59b1956637c32a2b9309205d7a60e82c | Home Addition | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
59b1956637c32a2b9309205d7a60e82c
file_name
Final Price - Proposal & Allowance Schedule - Thompson - 8.24.25.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Payne%20Tompkins/Payne%20%26%20Tompkins%20Upload/Thompson,%20Christy%20(Daughter)%20%26%20Sue%20(Mother)/01%20Contract%20Documents/Final%20Price%20-%20Proposal%20%26%20Allowance%20Schedule%20-%20Thompson%20-%208.24.25.pdf
company
The Thompson Residence
project_name
Home Addition
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
888750.0
brief_project_description
Existing Home Renovation; Primary Bathroom/Mudroom & Laundry
start_date
—
extracted_at
2026-07-24T02:26:17.703126+00:00
raw_text_preview
Date: 8/24/2025
• 684,450 $
•
Difference
•Window Allowance 9,072 $ 1,824 $
•
•Door Allowance 4,400 $ (136) $
•
•Plumbing Fixture Allowance 6,700 $ (4,324) $
•Lighting Fixture Allowance 1,250 $ (854) $
•Closet Allowance 3,000 $ 915 $
•
•Bath Accessories Allowance 400 $ 585 $
•Cabinet Allowance 19,850 $ 13,940 $
•
•
•Countertops & Solid Surface Allowance 2,910 $ 2,338 $
•Knobs and Pulls Allowance 510 $ 595 $
•Mirror/Shower Doors Allowance 1,700 $ (1,770) $
•Appliance Allowance - $
•
•Vinyl/Laminate Allowance 8,750 $ (1,478) $
•Tile Allowance 400 $ 2,944 $
14,578 $
• 552 $
• 14,047 $
•
• 10,200 $
•
• Kitchen Tape Lights 900 $
• Laundry Tape Lights 900 $
• Storage Hall Tape Lights 900 $
• Ramp Lighting 1,100 $
• 8,110 $ The Thompson Residence
Based on Plans Dated: 8.20.25Address: 9850 Peck Rd. Mantua, OH
The information below will change as select ions are finalized and plans are approved
Permit Fees at Cost (Required)
Add Live Reverse Gable w/Window
Half Bath Added*All materials below assumes waste, tax, and freight/shipping costs.
Provided by Homeowner.
Premade vanity, sink, faucet, toilet, mirror, sconce. Final Pricing
Home Addition:
Home Addition:
Allowances for Base Project #1
Associated Options to Base Project #1:Custom Built Cabinets at Kitchen, Laundry,
Bath, Front Bench
New Back Entry CabinetsAll Construction Closet SystemMarvin Essenti
file_created_at
2026-07-23T12:44:09+00:00
file_modified_at
2026-07-23T12:44:09+00:00
created_by
Dean Tompkins
modified_by
Dean Tompkins
_dlt_meta
—
|
|||||||
| moreland_contracts | aa89c7999e5d11f0d6bc0e15ca80f644 | Home Addition | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
aa89c7999e5d11f0d6bc0e15ca80f644
file_name
Final Price - Proposal & Allowance Schedule - Thompson - 8.25.25.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Payne%20Tompkins/Payne%20%26%20Tompkins%20Upload/Thompson,%20Christy%20(Daughter)%20%26%20Sue%20(Mother)/01%20Contract%20Documents/Final%20Price%20-%20Proposal%20%26%20Allowance%20Schedule%20-%20Thompson%20-%208.25.25.pdf
company
The Thompson Residence
project_name
Home Addition
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
890080.0
brief_project_description
Home Addition including various allowances and selected options.
start_date
—
extracted_at
2026-07-25T02:24:24.641758+00:00
raw_text_preview
Date: 8/25/2025
• 685,780 $
•
•
Difference
•Window Allowance 9,072 $ 1,824 $
•
•Door Allowance 4,400 $ (136) $
•
•Plumbing Fixture Allowance 6,700 $ (4,324) $
•Lighting Fixture Allowance 1,250 $ (854) $
•Closet Allowance 3,000 $ 915 $
•
•Bath Accessories Allowance 400 $ 585 $
•Cabinet Allowance 19,850 $ 13,940 $
•
•
•Countertops & Solid Surface Allowance 2,910 $ 2,338 $
•Knobs and Pulls Allowance 510 $ 595 $
•Mirror/Shower Doors Allowance 1,700 $ (1,770) $
•Appliance Allowance - $
•
•Vinyl/Laminate Allowance 8,750 $ (1,478) $
•Tile Allowance 400 $ 2,944 $
14,578 $
• 552 $
• 14,047 $
•
• 10,200 $
•
• Kitchen Tape Lights 900 $
• Laundry Tape Lights 900 $
• Storage Hall Tape Lights 900 $
• Ramp Lighting 1,100 $ The Thompson Residence
Based on Plans Dated: 8.20.25Address: 9850 Peck Rd. Mantua, OH
The information below will change as select ions are finalized and plans are approved
Permit Fees at Cost (Required)
Add Live Reverse Gable w/Window
Half Bath Added*All materials below assumes waste, tax, and freight/shipping costs.
Provided by Homeowner.
Premade vanity, sink, faucet, toilet, mirror, sconce. Final Pricing
Home Addition:
Home Addition:
Allowances for Base Project #1
Associated Options to Base Project #1:Custom Built Cabinets at Kitchen, Laundry,
Bath, Front Bench All Construction Closet SystemMarvin Essential Fiberglass Windows
Front, Rear, Garage Entry Doors
file_created_at
2026-07-23T12:44:09+00:00
file_modified_at
2026-07-23T12:44:09+00:00
created_by
Dean Tompkins
modified_by
Dean Tompkins
_dlt_meta
—
|
|||||||
| moreland_contracts | a90611b186e2c8ce8848c3b53144d60c | Home Addition | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
a90611b186e2c8ce8848c3b53144d60c
file_name
40% Complete - Proposal & Allowance Schedule - Thompson - 8.5.25.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Payne%20Tompkins/Payne%20%26%20Tompkins%20Upload/Thompson,%20Christy%20(Daughter)%20%26%20Sue%20(Mother)/01%20Contract%20Documents/40%25%20Complete%20-%20Proposal%20%26%20Allowance%20Schedule%20-%20Thompson%20-%208.5.25.pdf
company
The Thompson Residence
project_name
Home Addition
contact_person
—
contract_type
time_and_materials
hourly_rate
—
estimated_hours
—
total_fee_estimate
749539.0
brief_project_description
Existing Home Renovation; Primary Bathroom/Mudroom & Laundry Room
start_date
—
extracted_at
2026-07-24T02:25:47.127310+00:00
raw_text_preview
Date: 8/5/2025
Low High
• 623,713 $ - 689,367 $
Difference
•Window Allowance 9,072 $
•Door Allowance 4,400 $
•Plumbing Fixture Allowance 6,700 $ (4,628) $
•Lighting Fixture Allowance 1,250 $ (1,209) $
•Closet Allowance 3,000 $
•Bath Accessories Allowance 400 $ 585 $
•Cabinet Allowance 19,850 $
•Countertops & Solid Surface Allowance 2,910 $
•Knobs and Pulls Allowance 510 $ 595 $
•Mirror/Shower Doors Allowance 1,700 $ (1,770) $
•Appliance Allowance - $
•
•Vinyl/Laminate Allowance 8,750 $
•Tile Allowance 400 $
(6,427) $
Low High
• 300 $ - 800 $
• 11,493 $ - 14,047 $
• 11,079 $ - 13,541 $
•
• Kitchen Tape Lights TBD - TBD
• Laundry Tape Lights TBD - TBD
• Storage Hall Tape Lights TBD - TBD
• TBD - TBD
• TBD - TBD
22,872 $ 28,388 $
640,158 $ - 711,328 $ Storage Hall Custom Built Cabinets with Tops
New Back Entry CabinetsHome Addition:
Home Addition:
Allowances for Base Project #1
Associated Options to Base Project #1:
Total Cost of Selected Options:
Summation of Costs (Base Project #1 + Allowances + Selected Options): The Thompson Residence
Based on Plans Dated: 6.16.25
Total Allowance Difference:Address: 9850 Peck Rd. Mantua, OH
The information below will change as select ions are finalized and plans are approved
Permit Fees at Cost (Required)
Add Live Reverse Gable w/WindowHalf Bath Added*All materials below assumes waste, tax, and freight/shipping costs.
Provided by Homeowner.
Premade vanity, sink, faucet , toilet, mirror, sconce. 40% Pricing Complete
Low High
• 109,716 $ - 121,265 $
Difference
•Plumbing Fixture Allowance 3,250 $ (373) $
•Lighting Fixture Allowance 550 $ (116) $
•Bath Acce
file_created_at
2026-07-23T12:44:04+00:00
file_modified_at
2026-07-23T12:44:04+00:00
created_by
Dean Tompkins
modified_by
Dean Tompkins
_dlt_meta
—
|
|||||||
| moreland_contracts | d545126903de301d58e082ed857604f2 | Home Addition | 1.00 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
d545126903de301d58e082ed857604f2
file_name
Final Price - Proposal & Allowance Schedule - Thompson - 8.25.25.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Payne%20Tompkins/Payne%20%26%20Tompkins%20Upload/Thompson,%20Christy%20(Daughter)%20%26%20Sue%20(Mother)/01%20Contract%20Documents/Executed%20Contracts/Final%20Price%20-%20Proposal%20%26%20Allowance%20Schedule%20-%20Thompson%20-%208.25.25.pdf
company
The Thompson Residence
project_name
Home Addition
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
890080.0
brief_project_description
Existing Home Renovation; Primary Bathroom/Mudroom & Laundry
start_date
2025-08-25
extracted_at
2026-07-24T02:29:31.593476+00:00
raw_text_preview
Date: 8/25/2025
• 685,780 $
•
•
Difference
•Window Allowance 9,072 $ 1,824 $
•
•Door Allowance 4,400 $ (136) $
•
•Plumbing Fixture Allowance 6,700 $ (4,324) $
•Lighting Fixture Allowance 1,250 $ (854) $
•Closet Allowance 3,000 $ 915 $
•
•Bath Accessories Allowance 400 $ 585 $
•Cabinet Allowance 19,850 $ 13,940 $
•
•
•Countertops & Solid Surface Allowance 2,910 $ 2,338 $
•Knobs and Pulls Allowance 510 $ 595 $
•Mirror/Shower Doors Allowance 1,700 $ (1,770) $
•Appliance Allowance - $
•
•Vinyl/Laminate Allowance 8,750 $ (1,478) $
•Tile Allowance 400 $ 2,944 $
14,578 $
• 552 $
• 14,047 $
•
• 10,200 $
•
• Kitchen Tape Lights 900 $
• Laundry Tape Lights 900 $
• Storage Hall Tape Lights 900 $
• Ramp Lighting 1,100 $ The Thompson Residence
Based on Plans Dated: 8.20.25Address: 9850 Peck Rd. Mantua, OH
The information below will change as select ions are finalized and plans are approved
Permit Fees at Cost (Required)
Add Live Reverse Gable w/Window
Half Bath Added*All materials below assumes waste, tax, and freight/shipping costs.
Provided by Homeowner.
Premade vanity, sink, faucet, toilet, mirror, sconce. Final Pricing
Home Addition:
Home Addition:
Allowances for Base Project #1
Associated Options to Base Project #1:Custom Built Cabinets at Kitchen, Laundry,
Bath, Front Bench All Construction Closet SystemMarvin Essential Fiberglass Windows
Front, Rear, Garage Entry Doors
file_created_at
2026-07-23T12:45:32+00:00
file_modified_at
2026-07-23T12:45:32+00:00
created_by
Dean Tompkins
modified_by
Dean Tompkins
_dlt_meta
—
|
|||||||
| moreland_contracts | eaad90acd408c6f6199b4a8b76850e0f | New Addition and/or Remodeled Home | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
eaad90acd408c6f6199b4a8b76850e0f
file_name
COPY - FINAL - HBA Remodeler Warranty 8.31.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Payne%20Tompkins/Payne%20%26%20Tompkins%20Upload/Thompson,%20Christy%20(Daughter)%20%26%20Sue%20(Mother)/05%20Closing%20Documents/COPY%20-%20FINAL%20-%20HBA%20Remodeler%20Warranty%208.31.pdf
company
HBA of Greater Cleveland
project_name
New Addition and/or Remodeled Home
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Remodeling project for a new addition and/or remodeling of an existing home.
start_date
—
extracted_at
2026-07-25T02:25:02.849682+00:00
raw_text_preview
Caution - Do Not Copy - This is a Numerically Registered Document . Copyright HBA of Greater Cleveland © 2020 Part I Page 1 INTRODUCTION
Welcome to your New Addition and/or Remodeled Home!
We want you to be secure in the knowledge that your remodeling project has been constructed with care by an HBA
Remodeler . In order to protect your investment, a limited warranty has been developed to assure your new ly remodeled
home continues to provide you with comfort and security for many years.
Your remodeled home investment is protected by:
•The Limited Remodeler’s Warranty provided by your Remodeler .
•Manufacturer’s warranties provided by the manufacturers of the products installed in your home.
•Homeowner’s Insurance provided by your insurance carrier.
•Homeowner maintenance provided by you.
Remodeling, the process of expanding or enhancing an existing structure, presents inherent difficulties in melding the
new and old into a home or room that meets the consumer’s needs and is aesthetically pleasing. Some circumstances
call for the suspension of some or all of the guidelines in order to succes sfully complete a remodeling project. These
circumstances include, but are not limited to, the meeting of old, out -of-plumb or out -of-level structures with new
structures; the appearance of new materials near weathered, existing materials; and the practica l considerations for
new projects to work within the limitations of existing buildings.
Because of the unique challenges of joining new and old construction, a remodeling contractor may build some or the
entire project outside the scope of these guidelines to achieve the contract objectives. When it is reasonable, the
contractor may note and discuss a condition with the consumer before construction. It is also normal for a
contractor, during the course of constr uction to discover and accommodate conditions in the old structure that
require different solutions from those suggested in t
file_created_at
2026-07-23T12:44:18+00:00
file_modified_at
2026-07-23T12:44:18+00:00
created_by
Dean Tompkins
modified_by
Dean Tompkins
_dlt_meta
—
|
|||||||
| moreland_contracts | 9fd7e06f80eafd2829f211876bd2355c | New Home Addition | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
9fd7e06f80eafd2829f211876bd2355c
file_name
Thompson - HSH Drywall Quote.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Payne%20Tompkins/Payne%20%26%20Tompkins%20Upload/Thompson,%20Christy%20(Daughter)%20%26%20Sue%20(Mother)/02%20Quotes/16%20Drywall/Thompson%20-%20HSH%20Drywall%20Quote.pdf
company
HSH Drywall
project_name
New Home Addition
contact_person
Christy
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Hang drywall per plans including moisture resistant drywall at wet walls and finish drywall to specified levels.
start_date
—
extracted_at
2026-07-24T02:30:23.876178+00:00
raw_text_preview
ThompsonPrepared
By8/5/2025 HSH
DrywallPO
Box102Lisbon
44432330-614-1127
mark@hshdrywall.com
Scope
ofWorkHang
drywallperplans1/2
inchdrywallonallwalls1/2
inchdrywallonallceilings1/2
inchMoistureResistantDrywallatwetwallsFinish
drywalltoLevelspecifiedbelowWalls
Level4Ceilings
Level4New
Home Addition$12,397.14 Christy
Laundry Room$837.94 Christy
Primary Bathroom$1,039.49 Proposal
Total$14,274.57 Signature
ThompsonPage
1of1
file_created_at
2026-07-23T12:45:50+00:00
file_modified_at
2026-07-23T12:45:50+00:00
created_by
Dean Tompkins
modified_by
Dean Tompkins
_dlt_meta
—
|
|||||||
| moreland_contracts | 21de9480461a9fc673a265fec1d82f4e | Home addition with existing primary bathroom, mudroom/laundry and basement entry stairwell renovation. | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
21de9480461a9fc673a265fec1d82f4e
file_name
1. Remodel Agreement.docx.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Payne%20Tompkins/Payne%20%26%20Tompkins%20Upload/Thompson,%20Christy%20(Daughter)%20%26%20Sue%20(Mother)/01%20Contract%20Documents/Executed%20Contracts/1.%20Remodel%20Agreement.docx.pdf
company
PAYNE & TOMPKINS DESIGN RENOVATIONS LLC
project_name
Home addition with existing primary bathroom, mudroom/laundry and basement entry stairwell renovation.
contact_person
Christy Thompson
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
24.0
brief_project_description
Home addition with existing primary bathroom, mudroom/laundry and basement entry stairwell renovation.
start_date
2025-08-26
extracted_at
2026-07-24T02:29:26.970426+00:00
raw_text_preview
Page 1 of 16
10690 Mayfield Road
Chardon, OH 44024
440-226-5040
PAYNE & TOMPKINS DESIGN RENOVATIONS LLC REMODEL
AGREEMENT
This Agreement is made this , by and between PAYNE
& TOMPKINS DESIGN RENOVATIONS LLC (the "Builder”), 10690 Mayfield Road,
Chardon, Ohio 44024, main line 440 -226-5040 Tax Id. No. 68-0655434 and
(the “Owner”) regarding
property located at:
(the “Property”) (owner’s phone number) to perform certain remodeling
services to improvements on the Property (hereinafter the “Work”). In consideration of
the mutual promises contained herein, the Builder and the Owner (collectively, the
“Parties”) agree as follows:
1. CONTRACT DOCUMENTS . The “Contract Documents,” which are attached hereto
and incorporated herein or submitted electronically to Owner, shall mean the applicable
documents listed below, in addition to this Agreement:
A. Proposal with Allowances (attached) Dated No. of Pages
B. Selection Specifications (via DocuSign per Designer )
C. Scope of Work (attached) Dated No. of Pages
D. Policies and Procedures (attached) Dated No. of Pages ___
E. Architectural and Design Plans (via DocuSign per Designer )
F. Mold Addendum, Maintenance, and Waiver (attached)
G. HBA Remodeler’s Limited Warranty (provided at closing)
H. Disclosure of Information on Lead Based Paint and Lead Based Paint Hazards (attached)
I. Draw Schedule (attached) Dated No. of Pages ___
J. Notice of Right of Rescission (attached)
(with “Important Information About Right of Rescission”)
K. Certificate of Liability Insurance (attached)
Any inconsistency between two or more Contract Documents shall be resolved according
to the following order of priority:
1. This Agreement, together with any Change Orders
2. The Project Proposal and Allowance Schedule
3. Selection Specifications
4. Scope of Work
5. Policies
file_created_at
2026-07-23T12:45:29+00:00
file_modified_at
2026-07-23T12:45:29+00:00
created_by
Dean Tompkins
modified_by
Dean Tompkins
_dlt_meta
—
|
|||||||