Stage 1: ERP Discovery & Selection

project 80bd0bc9bdc2c18f
Normalized: stage 1 erp discovery and selection
moreland_contracts
Entity Properties (gold project table)
project_id
80bd0bc9bdc2c18f
name
Stage 1: ERP Discovery & Selection
client_id
canonical_metadata
created_at
2026-03-18 14:23:02.367060+00:00
updated_at
2026-03-18 14:23:02.367060+00:00
status
billable
recurring
squad
qa_partner
project_manager
lead_dev
description
Consulting services to assist Thesis Lighting with ERP selection and strategic architecture.
state
team_name
closedate
dealstage
contract_type
fixed_fee
contract_hourly_rate
225.0
contract_estimated_hours
contract_total_fee
90000.0
49%
Separation Confidence How distinct this entity is from others. Higher means no close matches existed when it was created. Lower means a near-match was rejected just below the 80% threshold — worth reviewing.
Moderate — a somewhat similar entity exists
100%
Avg Match Confidence The average confidence score across all active source mappings. Shows overall quality of linkage between source records and this canonical entity.
Strong source linkage

Source Mappings (48)

Source Source ID Display Name Confidence Method Status Actions
moreland_contracts 15OVpYhq3RKeOg Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-04-02T02:08:45.885323+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts n33BpEBPpQUgJg Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-03-30T02:09:29.268276+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts m4hOchwHuskzWQ Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-03-26T02:09:57.797296+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts YYkplUVAtkHarQ Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-03-05T02:07:45.515901+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts BmZ0UW6mCqs/lQ Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP selection and strategic architecture.
start_date
2026-03-03
extracted_at
2026-03-06T12:07:21.227714+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts tiJdxKFIfJksrg Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-03-19T15:19:38.530404+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts xyTlDrRJ86UE5Q Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-03-21T02:08:51.980090+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts kzHXUD83bW046A Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-03-22T02:07:52.735202+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts uosdcWEmPGVEFQ Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-04-08T21:10:33.908533+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts GMSLRuN0JNde9Q Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-04-10T02:08:44.213454+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts rIbGelchPbO6+Q Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-04-07T02:09:41.088462+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts vvXyZUJEmcjb9Q Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-04-04T02:09:00.973025+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts vPz0UI7ozlR5MQ Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-03-06T00:07:19.015661+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts Lpm8lrIU8MRwMg Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-03-06T02:07:49.427821+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts h0BkpcZGht7Rng Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-03-06T06:07:14.246003+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts SNBfwxRP3Vz0wQ Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-03-24T02:08:28.891373+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts A2rJSgIvEx/ayg Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-04-05T02:08:05.776579+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts kztg5LiJvyMV7A Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-04-01T02:09:58.724506+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts vX/ZIA4ugg8qqA Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-03-31T02:09:11.459577+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts g9ZZVlOtrNUiYQ Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-03-27T02:08:59.029545+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts SfG8wiIQgvsqyg Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-03-05T06:07:22.434481+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts VxJmt8EvhFqdqg Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-03-04T18:08:23.070513+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts EGW4CG2Jy2THeQ Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-03-05T00:06:36.053190+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts /05nkRPfLB2ZVQ Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-03-20T02:07:51.330386+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts UgnVRHZPXOaI1Q Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-03-19T21:24:38.980028+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts kDhrGImxlilc8w Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-03-25T02:09:49.716361+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts 1fWt25Vx+cdjhw Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-03-28T02:09:15.952475+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts lOwiPLlbM/x8VQ Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP selection and strategic architecture.
start_date
2026-03-03
extracted_at
2026-04-03T02:08:16.570588+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts J+jLBVYaErBxfA Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-03-05T12:08:15.601057+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts 0hwGk3THvkmtZA Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-03-23T02:08:43.584500+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts V9xblPGvqRZpGw Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-03-29T02:08:03.484111+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts YrQ9tXFsNh2JJw Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-04-06T02:08:27.770725+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts AyaADSZ/eJNnDQ Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-04-08T02:08:41.039200+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts /JY27Jjt7ySG8A Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-04-09T02:07:33.271822+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts Ci219qNFjPyziQ Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-04-11T02:07:36.711915+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts dCvrSDNNEIyuzQ Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-04-12T02:06:58.110456+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts S1/Be3N/jyPkew Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-04-13T02:08:09.260809+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts Se7r0YYug/7DHQ Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-04-14T02:07:58.923180+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts oykGdhb3dcoK1A Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-04-15T02:07:47.429139+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts IgdwBRlZTPI5BQ Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-04-16T02:08:24.447932+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts ostMVJKGzxEhOg Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-04-17T02:07:47.524356+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts yDmIhwttFx25bg Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP selection and strategic architecture.
start_date
2026-03-03
extracted_at
2026-04-23T02:08:25.961162+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts wrVU2ifm7w8gQg Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-04-18T02:08:04.594884+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts cs9cBVG0qM0XcQ Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-04-19T02:06:57.026084+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts eMRdyTu3mg0KLg Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-04-20T02:08:19.026096+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts BWSZFtN17tHMHA Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-04-21T02:07:58.868902+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts myOnUnRQ7rRdiQ Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-04-22T02:08:41.167645+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts GGdOiuMLK8uipA Stage 1: ERP Discovery & Selection 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
49a5fe7310c24c2e79641a056aa2c597
file_name
Thesis Lighting [Essential Elements] Stage1 Arrangement Letter.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BCCFFDA9D-BC41-408E-B0CC-183021D8D131%7D&file=Thesis%20Lighting%20[Essential%20Elements]%20Stage1%20Arrangement%20Letter.docx&action=default&mobileredirect=true
company
Thesis Lighting
project_name
Stage 1: ERP Discovery & Selection
contact_person
Dave
contract_type
fixed_fee
hourly_rate
225.0
estimated_hours
total_fee_estimate
90000.0
brief_project_description
Consulting services to assist Thesis Lighting with ERP Discovery and Selection.
start_date
2026-03-03
extracted_at
2026-04-09T14:01:40.086731+00:00
raw_text_preview
February 24, 2026 Re: Thesis Lighting — Stage 1: ERP Discovery & Selection Arrangement Letter Dear Dave: MorelandConnect LLC (“Moreland”) is pleased to provide this Arrangement Letter (“Agreement”) confirming our consulting services (the “Services”) to assist Thesis Lighting (“Thesis”) Background Thesis Lighting is at a pivotal inflection point. As you prepare to close your separation from EGLO on February 27th, the urgency to establish an independent operational platform has never been clearer. Your team currently relies on EGLO’s SAP environment along with PIM, CRM, and supporting IT systems — all of which must be replaced within the 24-month runway provided by EGLO. MorelandConnect has been engaged with Thesis Lighting since late 2025 and has presented a comprehensive five-phase program to guide the full transformation. We understand and fully support your decision to focus on Stage 1 - getting the right ERP foundation in place quickly and cleanly - before layering on additional capabilities. This is the right call. This Arrangement Letter confirms our engagement to provide Stage 1 Discovery and ERP Selection consulting services. Our goal is to help Thesis Lighting move quickly, make the right ERP choice, and set a strong foundation for everything that follows. Scope of Services MorelandConnect will provide consulting services to assist Thesis Lighting with the following: Phase 1 — Strategic Architecture & Discovery (2-day onsite workshop + 5 days analysis): Conduct a 2-day deep-dive onsite workshop with business leaders and key users Document high-level current process flows across Quote-to-Cash (QTC), Requisition-to-Pay (RTP), and Record-to-Report (RTR) Develop high-level future process flows by business unit (US vs. Canada; distribution channels) Identify and document must-have business requirements for Financials, Procurement, Order Management, and Distribution Produce an initial architecture diagram identifying ERP candidates and integration pathways Estab
file_created_at
2026-03-04T15:18:51+00:00
file_modified_at
2026-03-04T15:18:51+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta