Sterigenics GPS Database Environment Migration

project 85baafe618fa742f
Normalized: sterigenics gps database environment migration
moreland_contracts
Entity Properties (gold project table)
project_id
85baafe618fa742f
name
Sterigenics GPS Database Environment Migration
client_id
canonical_metadata
created_at
2026-02-12 05:36:54.288209+00:00
updated_at
2026-02-12 05:36:54.288209+00:00
status
billable
recurring
squad
qa_partner
project_manager
lead_dev
description
Assisting with migration of the GPS Database environment to a new hosting provider.
state
team_name
closedate
dealstage
contract_type
time_and_materials
contract_hourly_rate
185.0
contract_estimated_hours
40.0
contract_total_fee
7400.0
42%
Separation Confidence How distinct this entity is from others. Higher means no close matches existed when it was created. Lower means a near-match was rejected just below the 80% threshold — worth reviewing.
Moderate — a somewhat similar entity exists
100%
Avg Match Confidence The average confidence score across all active source mappings. Shows overall quality of linkage between source records and this canonical entity.
Strong source linkage

Source Mappings (198)

Source Source ID Display Name Confidence Method Status Actions
moreland_contracts 0Ffmj1WKOn380A Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-10T02:07:56.505047+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts BWh397JJqCaZQA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-09T14:00:52.604170+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts ozqLgvx7ESc1Tw Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-09T02:07:10.028446+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts 3mibZHmK5lU4xw Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-09T02:06:49.200718+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts dzbos47dU+EI2w Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-08T21:10:11.774824+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts NkjBCpq7NR1+Sg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-24T02:07:42.059507+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts +e9nI4cRe5FqYA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-06T00:06:39.771319+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts bNxTh5XW1iUJbg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-05T06:07:02.417088+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts zOHtWuezInX+HA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-04T00:07:52.787071+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts x1XXgWDBGlH4yQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-03T18:08:01.064401+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts 6UbFdM4gXhk2yw Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-03T06:06:30.654878+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts McD4tnkHSAvpYw Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-26T02:07:47.145358+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts 0V0jeQpl1d+ClQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-26T02:07:19.977954+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts O/zqnidWU0uo8g Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-26T00:07:21.198852+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts dpjsLJKTAkxVEQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-26T00:07:46.476642+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts WnumtxdAZXjXmQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-24T18:07:27.979345+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts gtB99OPxAd9UyA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-25T06:07:53.943153+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts GC0efggcrBvdbw Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-24T06:07:32.836589+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts ZWXxo6wy/geKMg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-24T12:06:53.742019+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts Y9l0o1ksCDJIpg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-25T00:06:33.296668+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts y0LICntpw9GsgA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-25T02:07:11.927518+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts S86fhZ1tjKyaIg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-23T06:08:59.496071+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts 3UiMJi0ve1GOUw Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-24T02:08:16.508125+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts z5bgjZD6TizbRw Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-23T18:07:51.067641+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts mnXTzLKh0OT7tA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-22T12:07:17.953174+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts A9C7s0IFDlBG/w Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-21T06:07:36.621842+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts Y64qE+5QcUCV8g Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-21T00:08:03.905871+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts riZzHu2Fgx+K+A Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-19T06:08:03.245503+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts Z825T7RS1/luAw Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-19T03:11:04.586448+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts x2w8qME4dp7CRg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-20T06:07:37.688432+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts 7xYYI7w/Je2wsQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-21T18:07:06.032429+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts hQO+vSCuAStF4A Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-22T06:06:38.203602+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts 9IFVMf6RQNT2/w Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-22T00:06:37.805897+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts JNNlPccU3fSbIA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-21T02:07:57.299651+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts piVDfOXiGiCGJA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-21T12:07:21.959303+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts yslJA9VqDaMdPA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-20T00:06:12.218215+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts Khxte4ta7sIekw Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-24T06:07:05.686838+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts lt8unNYbdMlQgA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-02T17:50:28.864292+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts 3fXBWhbAKFQRvQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-26T18:07:40.578518+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts pNTA6yYx+Ff1hA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-05T06:06:38.480710+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts 7lt9vuQEeRkWGQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-06T06:06:50.983619+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts zo4uWlXFSjLnDA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-06T06:06:28.269876+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts 1cZxHNyXNvhEYA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-20T02:07:25.224092+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts dAsDNRKQDlDNAw Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-21T02:07:56.260455+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts Q2YcTSBr50b3Jg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-21T02:08:23.051839+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts CmzyJNQf/mpVQg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-24T02:08:03.803421+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts jtCojqrLNL6N2Q Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-25T02:08:43.477418+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts iZKpTZ8+NFvNQw Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-29T02:07:36.971591+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts 29tjsJ7oY5nzJQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-30T02:08:59.196654+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts peY1LthcD2Gk8A Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
30.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-30T02:08:34.060784+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts wRtTY4jR6689vQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-06T02:08:02.315293+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts a/N4Lst9gOTnvw Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-07T02:08:22.450376+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts mq8SRKT0eHE1vg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-07T02:09:05.415645+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts D2s4K1qakxONPw Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-08T02:08:14.269062+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts 6ShRjzvlLbDWRg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-06T02:07:37.835984+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts a9lvWG9oHSnhpA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-02T02:07:52.668029+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts rPhWPGru9xu8Ng Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-31T02:08:10.872688+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts tS8Xg41tUyn9KA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-26T02:08:59.998562+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts gn4PLeRfphA/0A Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-26T02:09:29.254836+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts AvjK4nTCG9AtcA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-06T12:06:36.970908+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts IXfgLDqb9vACwg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-06T02:07:03.362043+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts mU/cJIhzjV1gxg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-05T12:07:53.021217+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts K/3AgxLMx1aVXQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-05T00:05:59.298716+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts jAU/nbKF1vOI4w Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-04T12:07:08.745083+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts 8IpAFF1svcRtYQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-03T18:07:32.952602+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts EMa2F4VLxFTM8g Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-04T18:07:35.515520+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts lRDjUE7t9ckz4A Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-03T00:06:49.683165+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts U2xP5fwERMi01g Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting Sotera Health LLC with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-25T06:07:25.438858+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts wuiAJsELOgWwSQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-23T06:08:29.102239+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts lo4QRnk1uIUa8Q Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting Sotera Health LLC with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-23T12:07:05.976233+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts OGN8ucFoNUdv2Q Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting Sotera Health LLC with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-19T03:13:10.626737+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts aMG57CcyJqGcYQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting Sotera Health LLC with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-19T06:07:31.754132+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts kLhMnODizX2XRA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-19T03:13:33.725943+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts vaTYIrzXPa6ZDg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-20T18:07:02.166334+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts axrSCxoLlTwuqg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-22T06:06:14.984952+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts xxX868FPgUbiuQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-20T18:06:37.795341+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts 416pt2SZZc1+ig Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-21T00:08:31.740907+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts 5bGltKs9oD4FNw Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-20T06:07:08.816072+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts khIJzKnwHQZAig Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-19T12:07:55.064676+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts zPYw26OIOm2HEw Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-20T12:07:32.541371+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts QeNRDhQLuY7bDg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-20T00:06:35.211693+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts DP1YZi9EtLKjsQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-19T18:07:52.939353+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts q0AQNynfaHMGoQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-19T12:07:28.735558+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts 5eNHrfF/86FnUA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-23T02:07:27.650909+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts bxosMv4+5uThzg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting Sotera Health LLC with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-23T00:08:13.747847+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts EGOypFl/m0A2GA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-03T02:08:01.385205+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts fqSl4TeQHi414A Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-02T18:07:03.124920+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts rRLgIAOxC2UM1A Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-05T12:07:25.681403+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts 3C7gor5ivWFTAw Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-19T21:24:15.561526+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts SRtzkpJOJ0bFiA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-22T02:07:28.717356+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts PVtMBSUn6ycrYw Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-23T02:07:51.419404+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts /vtr8y7n6FC/yg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-28T02:08:21.848226+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts OtNcvGnguvMZOQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-08T21:09:52.740863+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts 3i9o0ek7HtQFOA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-10T02:08:20.783508+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts fiJ5fjKTb2Xu4g Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-08T02:07:46.917978+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts gsSZLLmsdNEPEQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-05T02:07:16.744385+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts l5NMMRi+11Ba+A Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-04T02:08:10.328926+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts KHImerYkhN4pAg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-03T02:07:26.126396+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts hK3Cy+u06BKC9g Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-02T02:08:16.858009+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts CkI9CSjWEQESfQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-01T02:08:54.542475+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts TcH9jjI8iGIIeQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-01T02:09:26.027272+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts Aoy7mjGiYMwX2g Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-31T02:08:43.442798+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts igMyshNuImt9mA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-06T02:07:26.180781+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts 6s+kOAFBwKdugg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-05T02:07:24.241832+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts mPgzG+5/G1qUWQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-03T12:05:58.565354+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts /wZvEEU4mGqAbw Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-04T06:08:49.273254+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts f2lkXAfhBRyzRQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-03T12:05:35.727034+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts jA3GZLVet4AJWg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-02T17:50:56.742010+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts vVok36iWZtpJEw Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-04T06:09:19.452329+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts BQzmjBZjrHyLxg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-03T02:07:34.498935+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts 410yU8urBbEQnA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-02T17:50:43.011585+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts 8Suyc9IKXfGSMA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-02T17:51:09.812330+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts HS52/Zg8SeNyDQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-26T12:07:59.274738+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts 3r2qxCl9bzO/yg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-25T18:08:12.633402+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts ACJ/qyG+RcrIhQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-25T12:07:02.007300+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts Qrgutf48xbyb0w Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-23T00:08:53.779289+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts 6mkCfk5bxfeirQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-24T02:07:53.836607+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts oZmn0eWfc9XgbQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-19T03:11:27.976290+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts lXvmRvj18KG2+g Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-20T02:08:23.805110+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts eQCvYTX3TdaQGg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-20T12:07:07.977666+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts YgHsrz8XJFCMpA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-21T18:07:35.895077+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts KaVAoxezMajATA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-21T06:07:13.728579+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts 2/9Apnotom75Cg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-22T02:07:29.557184+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts WrMGj9l7BwreuA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-22T00:07:02.298045+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts KKzEXNbJStAbVA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-19T18:07:27.266661+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts AKKT58i1uvPe0Q Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-23T12:07:29.453487+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts d56Urb6heTyCLw Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-19T15:19:13.799766+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts oTZRDvprilH4mg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-20T02:07:04.342899+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts v91iFJ4smgfFNg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-28T02:08:49.646627+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts /8UumMyWCqb0mw Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-29T02:07:09.947296+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts 8ZQJlFBjD43Vhg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-05T02:07:38.411200+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts /tVX+7vu6UdjbA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-04T02:08:36.528916+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts 2YP+ggoCWGA0FQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting Sotera with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-03T02:07:51.123142+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts mdFHMS3pN3E0wQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-27T02:08:30.869367+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts cv9i5Uc69GoUDA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-27T02:08:01.761499+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts vA8siyOBVyCWJQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-23T02:08:17.224901+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts iO7eNOh79B2D9Q Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-04T02:07:45.776196+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts QyHWzTKtRTC75Q Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-04T00:07:23.317240+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts 5YJsiD8LDD+hRg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-04T18:08:00.489105+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts GRhFReLd6n/yPA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-04T02:08:10.997999+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts 6nAWENechJRnyw Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-04T12:07:35.072919+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts oht/NAR7a5YW9A Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting Sotera Health LLC with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-03T00:06:25.295427+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts dZ1JE7MxM+8XrA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-02T18:06:40.467192+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts QXtRpDmGcq4GGA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-26T18:07:12.456938+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts JztVj745HK3p0Q Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-26T12:08:34.142835+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts KY+k58rkV1Tw1g Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-25T18:07:47.534982+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts exgAGFhNhOt0BA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-25T12:07:39.292076+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts VeW5xTuDSP9nZw Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-25T02:06:48.957438+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts 4AI5kflj8cz5Ng Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-24T12:07:14.148287+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts xYyttAMPoO8LDA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-24T00:07:11.306525+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts G3GJryr4BXS0Og Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-21T12:06:56.478688+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts T5+vMUfbNqXoNA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
30.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-22T02:07:07.023548+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts 17QKDedw92X/fg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-22T12:06:54.086565+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts ImN9hztDEc+rfA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-20T02:07:59.400446+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts /nC9ke7zKyj2mw Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-21T02:07:31.247119+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts OsXixN+6reXhAQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting Sotera Health LLC with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-24T00:06:47.177877+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts XZk1Lg1AK7h8uA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-23T18:08:16.221331+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts UHwX9jnpHDxUnQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-23T02:07:51.302900+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts 1smBZFYt/DRUuA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-25T00:06:54.330117+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts 4aT5tLLPoatn2Q Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-24T18:07:50.068486+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts BkOrqHpXHGKs6Q Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-03T06:06:57.275190+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts cxZnuWZjSUUwtg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-05T02:06:59.222273+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts plNFyU3drJbi6A Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-05T00:06:18.250599+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts 4FnvaNMBtU/jYA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-06T00:06:59.691459+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts MLdP4Gi1Q4a2Ig Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-19T15:18:50.042126+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts lVkllBpq+/rH6Q Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-19T21:23:50.495617+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts WnyNkSoCAf+3ow Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-06T12:06:58.721418+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts NcJsI1CRmQk9tg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-22T02:07:05.932459+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts zjv9Qut7cXDX9w Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-25T02:09:17.796235+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts TolQbf8Ica3fqg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-11T02:07:13.788883+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts RGYxP3zBD5LQTQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-11T02:06:53.307214+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts Hg36L137he5NCw Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-12T02:06:38.501197+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts UwHa+SQbbxN6Fw Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-12T02:06:20.094695+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts dzrlbSwn9QeMGQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-13T02:07:45.043441+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts tiiz8Qe6gPjtOw Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-13T02:07:21.975590+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts iLTC7diLkqWqfQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-23T02:07:39.931529+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts W5tStIvCFQuJDg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-23T02:07:59.475463+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts BAVQnAUTLOhOlA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-14T02:07:36.455952+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts I1ygxFRko7lXnA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting Sotera Health LLC with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-14T02:07:15.897106+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts M8Vmr6flArg4AA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-15T02:07:27.006345+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts z7o2elgNc4dOvw Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-15T02:07:03.561518+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts ygEnRE2UUqhgeQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-16T02:07:54.994125+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts gmKQXYASkUjdSg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-16T02:07:25.819144+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts iJbwTdQjYZRqJg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-17T02:07:26.349390+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts sn67tLp9l4tiJQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-17T02:06:58.255213+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts aipiU12oatbZbA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-18T02:07:40.730689+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts ulnj3HHkm0Y2zQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting Sotera Health LLC with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-18T02:07:15.919086+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts 44t6oj+C5wwqvw Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-19T02:06:14.145822+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts UvhN+7ILFPcYWA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-19T02:06:36.608703+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts CQyqyfG2NTirbg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-20T02:07:31.028962+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts c0tpfPwdust8PA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-20T02:07:52.389952+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts 4TsmfhB19YyIyA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-21T02:07:28.001484+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts hbVxwp3lo5Q2/A Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-21T02:06:59.354905+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts 4iXejIf/0vQxQQ Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-22T02:08:18.911083+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts /UAaQSnRl2o+mg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting Sotera Health LLC with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-22T02:07:58.138463+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts xdkJvitY9Tq5wA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-24T02:08:10.632334+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts 9FYlTtTwXLjtOg Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-24T02:07:48.003005+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Background Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service. Key considerations: Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over. Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment. Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback. This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment. Project Scope and Approach Project Scope Moreland will assist Sotera in implementing the following changes: Network Connectivity & Security Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
moreland_contracts 65xH1blvgpz+uA Sterigenics GPS Database Environment Migration 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-09T14:01:16.303066+00:00
raw_text_preview
May 5, 2025 Jim Kolz Sotera Health LLC 9100 South Hills Blvd, Suite 300 Broadview Heights, OH 44147 Re: Sterigenics GPS Database Environment Migration Dear Jim: MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider. Engagement Overview {{engagement_overview}} Project Approach We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses. The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025. Responsibilities The following table outlines the key responsibilities for Sotera and Moreland. Fees and Expenses The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour. Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera. Assumptions This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly. Sotera will dedicate a project leader to the Project. New DB runs the same (or backward-compatible) engine version as current prod. Only connection strings/secrets change—no code refactor expected. Sterigenics QA owns full regression testing; MorelandConnect assists triage only. Sotera will provide access to IT resources as requested. Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta