Sterigenics GPS Database Environment Migration
project
85baafe618fa742f
Normalized: sterigenics gps database environment migration
moreland_contracts
Entity Properties (gold project table)
project_id
85baafe618fa742f
name
Sterigenics GPS Database Environment Migration
client_id
—
canonical_metadata
—
created_at
2026-02-12 05:36:54.288209+00:00
updated_at
2026-02-12 05:36:54.288209+00:00
status
—
billable
—
recurring
—
squad
—
qa_partner
—
project_manager
—
lead_dev
—
description
Assisting with migration of the GPS Database environment to a new hosting provider.
state
—
team_name
—
closedate
—
dealstage
—
contract_type
time_and_materials
contract_hourly_rate
185.0
contract_estimated_hours
40.0
contract_total_fee
7400.0
42%
Separation Confidence
How distinct this entity is from others. Higher means no close matches existed when it was created. Lower means a near-match was rejected just below the 80% threshold — worth reviewing.
Moderate — a somewhat similar entity exists
100%
Avg Match Confidence
The average confidence score across all active source mappings. Shows overall quality of linkage between source records and this canonical entity.
Strong source linkage
Source Mappings (198)
| Source | Source ID | Display Name | Confidence | Method | Status | Actions | |
|---|---|---|---|---|---|---|---|
| moreland_contracts | 0Ffmj1WKOn380A | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-10T02:07:56.505047+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | BWh397JJqCaZQA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-09T14:00:52.604170+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | ozqLgvx7ESc1Tw | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-09T02:07:10.028446+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 3mibZHmK5lU4xw | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-09T02:06:49.200718+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | dzbos47dU+EI2w | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-08T21:10:11.774824+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | NkjBCpq7NR1+Sg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-24T02:07:42.059507+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | +e9nI4cRe5FqYA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-06T00:06:39.771319+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | bNxTh5XW1iUJbg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-05T06:07:02.417088+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | zOHtWuezInX+HA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-04T00:07:52.787071+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | x1XXgWDBGlH4yQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-03T18:08:01.064401+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 6UbFdM4gXhk2yw | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-03T06:06:30.654878+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | McD4tnkHSAvpYw | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-26T02:07:47.145358+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 0V0jeQpl1d+ClQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-26T02:07:19.977954+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | O/zqnidWU0uo8g | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-26T00:07:21.198852+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | dpjsLJKTAkxVEQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-26T00:07:46.476642+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | WnumtxdAZXjXmQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-24T18:07:27.979345+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | gtB99OPxAd9UyA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-25T06:07:53.943153+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | GC0efggcrBvdbw | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-24T06:07:32.836589+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | ZWXxo6wy/geKMg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-24T12:06:53.742019+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | Y9l0o1ksCDJIpg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-25T00:06:33.296668+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | y0LICntpw9GsgA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-25T02:07:11.927518+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | S86fhZ1tjKyaIg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-23T06:08:59.496071+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 3UiMJi0ve1GOUw | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-24T02:08:16.508125+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | z5bgjZD6TizbRw | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-23T18:07:51.067641+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | mnXTzLKh0OT7tA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-22T12:07:17.953174+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | A9C7s0IFDlBG/w | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-21T06:07:36.621842+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | Y64qE+5QcUCV8g | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-21T00:08:03.905871+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | riZzHu2Fgx+K+A | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-19T06:08:03.245503+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | Z825T7RS1/luAw | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-19T03:11:04.586448+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | x2w8qME4dp7CRg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-20T06:07:37.688432+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 7xYYI7w/Je2wsQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-21T18:07:06.032429+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | hQO+vSCuAStF4A | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-22T06:06:38.203602+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 9IFVMf6RQNT2/w | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-22T00:06:37.805897+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | JNNlPccU3fSbIA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-21T02:07:57.299651+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | piVDfOXiGiCGJA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-21T12:07:21.959303+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | yslJA9VqDaMdPA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-20T00:06:12.218215+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | Khxte4ta7sIekw | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-24T06:07:05.686838+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | lt8unNYbdMlQgA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-02T17:50:28.864292+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 3fXBWhbAKFQRvQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-26T18:07:40.578518+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | pNTA6yYx+Ff1hA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-05T06:06:38.480710+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 7lt9vuQEeRkWGQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-06T06:06:50.983619+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | zo4uWlXFSjLnDA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-06T06:06:28.269876+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 1cZxHNyXNvhEYA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-20T02:07:25.224092+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | dAsDNRKQDlDNAw | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-21T02:07:56.260455+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | Q2YcTSBr50b3Jg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-21T02:08:23.051839+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | CmzyJNQf/mpVQg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-24T02:08:03.803421+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | jtCojqrLNL6N2Q | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-25T02:08:43.477418+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | iZKpTZ8+NFvNQw | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-29T02:07:36.971591+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 29tjsJ7oY5nzJQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-30T02:08:59.196654+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | peY1LthcD2Gk8A | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
30.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-30T02:08:34.060784+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | wRtTY4jR6689vQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-06T02:08:02.315293+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | a/N4Lst9gOTnvw | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-07T02:08:22.450376+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | mq8SRKT0eHE1vg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-07T02:09:05.415645+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | D2s4K1qakxONPw | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-08T02:08:14.269062+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 6ShRjzvlLbDWRg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-06T02:07:37.835984+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | a9lvWG9oHSnhpA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-02T02:07:52.668029+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | rPhWPGru9xu8Ng | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-31T02:08:10.872688+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | tS8Xg41tUyn9KA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-26T02:08:59.998562+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | gn4PLeRfphA/0A | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-26T02:09:29.254836+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | AvjK4nTCG9AtcA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-06T12:06:36.970908+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | IXfgLDqb9vACwg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-06T02:07:03.362043+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | mU/cJIhzjV1gxg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-05T12:07:53.021217+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | K/3AgxLMx1aVXQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-05T00:05:59.298716+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | jAU/nbKF1vOI4w | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-04T12:07:08.745083+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 8IpAFF1svcRtYQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-03T18:07:32.952602+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | EMa2F4VLxFTM8g | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-04T18:07:35.515520+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | lRDjUE7t9ckz4A | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-03T00:06:49.683165+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | U2xP5fwERMi01g | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera Health LLC with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-25T06:07:25.438858+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | wuiAJsELOgWwSQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-23T06:08:29.102239+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | lo4QRnk1uIUa8Q | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting Sotera Health LLC with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-23T12:07:05.976233+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | OGN8ucFoNUdv2Q | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting Sotera Health LLC with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-19T03:13:10.626737+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | aMG57CcyJqGcYQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting Sotera Health LLC with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-19T06:07:31.754132+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | kLhMnODizX2XRA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-19T03:13:33.725943+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | vaTYIrzXPa6ZDg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-20T18:07:02.166334+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | axrSCxoLlTwuqg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-22T06:06:14.984952+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | xxX868FPgUbiuQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-20T18:06:37.795341+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 416pt2SZZc1+ig | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-21T00:08:31.740907+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 5bGltKs9oD4FNw | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-20T06:07:08.816072+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | khIJzKnwHQZAig | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-19T12:07:55.064676+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | zPYw26OIOm2HEw | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-20T12:07:32.541371+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | QeNRDhQLuY7bDg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-20T00:06:35.211693+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | DP1YZi9EtLKjsQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-19T18:07:52.939353+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | q0AQNynfaHMGoQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-19T12:07:28.735558+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 5eNHrfF/86FnUA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-23T02:07:27.650909+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | bxosMv4+5uThzg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting Sotera Health LLC with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-23T00:08:13.747847+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | EGOypFl/m0A2GA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-03T02:08:01.385205+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | fqSl4TeQHi414A | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-02T18:07:03.124920+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | rRLgIAOxC2UM1A | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-05T12:07:25.681403+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 3C7gor5ivWFTAw | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-19T21:24:15.561526+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | SRtzkpJOJ0bFiA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-22T02:07:28.717356+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | PVtMBSUn6ycrYw | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-23T02:07:51.419404+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | /vtr8y7n6FC/yg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-28T02:08:21.848226+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | OtNcvGnguvMZOQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-08T21:09:52.740863+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 3i9o0ek7HtQFOA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-10T02:08:20.783508+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | fiJ5fjKTb2Xu4g | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-08T02:07:46.917978+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | gsSZLLmsdNEPEQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-05T02:07:16.744385+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | l5NMMRi+11Ba+A | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-04T02:08:10.328926+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | KHImerYkhN4pAg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-03T02:07:26.126396+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | hK3Cy+u06BKC9g | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-02T02:08:16.858009+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | CkI9CSjWEQESfQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-01T02:08:54.542475+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | TcH9jjI8iGIIeQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-01T02:09:26.027272+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | Aoy7mjGiYMwX2g | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-31T02:08:43.442798+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | igMyshNuImt9mA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-06T02:07:26.180781+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 6s+kOAFBwKdugg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-05T02:07:24.241832+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | mPgzG+5/G1qUWQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-03T12:05:58.565354+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | /wZvEEU4mGqAbw | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-04T06:08:49.273254+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | f2lkXAfhBRyzRQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-03T12:05:35.727034+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | jA3GZLVet4AJWg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-02T17:50:56.742010+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | vVok36iWZtpJEw | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-04T06:09:19.452329+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | BQzmjBZjrHyLxg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-03T02:07:34.498935+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 410yU8urBbEQnA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-02T17:50:43.011585+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 8Suyc9IKXfGSMA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-02T17:51:09.812330+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | HS52/Zg8SeNyDQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-26T12:07:59.274738+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 3r2qxCl9bzO/yg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-25T18:08:12.633402+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | ACJ/qyG+RcrIhQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-25T12:07:02.007300+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | Qrgutf48xbyb0w | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-23T00:08:53.779289+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 6mkCfk5bxfeirQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-24T02:07:53.836607+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | oZmn0eWfc9XgbQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-19T03:11:27.976290+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | lXvmRvj18KG2+g | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-20T02:08:23.805110+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | eQCvYTX3TdaQGg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-20T12:07:07.977666+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | YgHsrz8XJFCMpA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-21T18:07:35.895077+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | KaVAoxezMajATA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-21T06:07:13.728579+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 2/9Apnotom75Cg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-22T02:07:29.557184+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | WrMGj9l7BwreuA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-22T00:07:02.298045+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | KKzEXNbJStAbVA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-19T18:07:27.266661+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | AKKT58i1uvPe0Q | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-23T12:07:29.453487+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | d56Urb6heTyCLw | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-19T15:19:13.799766+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | oTZRDvprilH4mg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-20T02:07:04.342899+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | v91iFJ4smgfFNg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-28T02:08:49.646627+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | /8UumMyWCqb0mw | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-29T02:07:09.947296+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 8ZQJlFBjD43Vhg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-05T02:07:38.411200+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | /tVX+7vu6UdjbA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-04T02:08:36.528916+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 2YP+ggoCWGA0FQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-03T02:07:51.123142+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | mdFHMS3pN3E0wQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-27T02:08:30.869367+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | cv9i5Uc69GoUDA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-27T02:08:01.761499+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | vA8siyOBVyCWJQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-23T02:08:17.224901+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | iO7eNOh79B2D9Q | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-04T02:07:45.776196+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | QyHWzTKtRTC75Q | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-04T00:07:23.317240+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 5YJsiD8LDD+hRg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-04T18:08:00.489105+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | GRhFReLd6n/yPA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-04T02:08:10.997999+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 6nAWENechJRnyw | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-04T12:07:35.072919+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | oht/NAR7a5YW9A | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting Sotera Health LLC with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-03T00:06:25.295427+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | dZ1JE7MxM+8XrA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-02T18:06:40.467192+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | QXtRpDmGcq4GGA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-26T18:07:12.456938+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | JztVj745HK3p0Q | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-26T12:08:34.142835+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | KY+k58rkV1Tw1g | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-25T18:07:47.534982+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | exgAGFhNhOt0BA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-25T12:07:39.292076+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | VeW5xTuDSP9nZw | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-25T02:06:48.957438+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 4AI5kflj8cz5Ng | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-24T12:07:14.148287+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | xYyttAMPoO8LDA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-24T00:07:11.306525+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | G3GJryr4BXS0Og | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-21T12:06:56.478688+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | T5+vMUfbNqXoNA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
30.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-22T02:07:07.023548+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 17QKDedw92X/fg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-22T12:06:54.086565+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | ImN9hztDEc+rfA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-20T02:07:59.400446+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | /nC9ke7zKyj2mw | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-21T02:07:31.247119+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | OsXixN+6reXhAQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting Sotera Health LLC with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-24T00:06:47.177877+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | XZk1Lg1AK7h8uA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-23T18:08:16.221331+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | UHwX9jnpHDxUnQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-23T02:07:51.302900+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 1smBZFYt/DRUuA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-25T00:06:54.330117+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 4aT5tLLPoatn2Q | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-02-24T18:07:50.068486+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | BkOrqHpXHGKs6Q | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-03T06:06:57.275190+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | cxZnuWZjSUUwtg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-05T02:06:59.222273+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | plNFyU3drJbi6A | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-05T00:06:18.250599+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 4FnvaNMBtU/jYA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-06T00:06:59.691459+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | MLdP4Gi1Q4a2Ig | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-19T15:18:50.042126+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | lVkllBpq+/rH6Q | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-19T21:23:50.495617+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | WnyNkSoCAf+3ow | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-06T12:06:58.721418+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | NcJsI1CRmQk9tg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-22T02:07:05.932459+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | zjv9Qut7cXDX9w | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-03-25T02:09:17.796235+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | TolQbf8Ica3fqg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-11T02:07:13.788883+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | RGYxP3zBD5LQTQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-11T02:06:53.307214+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | Hg36L137he5NCw | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-12T02:06:38.501197+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | UwHa+SQbbxN6Fw | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-12T02:06:20.094695+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | dzrlbSwn9QeMGQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-13T02:07:45.043441+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | tiiz8Qe6gPjtOw | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-13T02:07:21.975590+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | iLTC7diLkqWqfQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-23T02:07:39.931529+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | W5tStIvCFQuJDg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-23T02:07:59.475463+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | BAVQnAUTLOhOlA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-14T02:07:36.455952+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | I1ygxFRko7lXnA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting Sotera Health LLC with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-14T02:07:15.897106+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | M8Vmr6flArg4AA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-15T02:07:27.006345+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | z7o2elgNc4dOvw | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-15T02:07:03.561518+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | ygEnRE2UUqhgeQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-16T02:07:54.994125+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | gmKQXYASkUjdSg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-16T02:07:25.819144+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | iJbwTdQjYZRqJg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-17T02:07:26.349390+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | sn67tLp9l4tiJQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-17T02:06:58.255213+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | aipiU12oatbZbA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-18T02:07:40.730689+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | ulnj3HHkm0Y2zQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting Sotera Health LLC with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-18T02:07:15.919086+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 44t6oj+C5wwqvw | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-19T02:06:14.145822+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | UvhN+7ILFPcYWA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-19T02:06:36.608703+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | CQyqyfG2NTirbg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-20T02:07:31.028962+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | c0tpfPwdust8PA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-20T02:07:52.389952+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 4TsmfhB19YyIyA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-21T02:07:28.001484+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | hbVxwp3lo5Q2/A | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-21T02:06:59.354905+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 4iXejIf/0vQxQQ | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-22T02:08:18.911083+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | /UAaQSnRl2o+mg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting Sotera Health LLC with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-22T02:07:58.138463+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | xdkJvitY9Tq5wA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-24T02:08:10.632334+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 9FYlTtTwXLjtOg | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
29f2737c3ae4b10b3d8b6c92d5bdbc65
file_name
Sterigenics - Moreland Arrangement Letter - GPS DB Migration.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B49E668E9-9971-443E-B39A-C47AFD7FB59F%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20DB%20Migration.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
50.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-24T02:07:48.003005+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Background
Sterigenics’ GPS application currently connects to its SQL database over a dedicated site-to-site VPN. Sotera Health is migrating that database to a new hosting environment, which requires re-establishing a trusted network path and updating application endpoints—without disrupting ongoing feature work or production service.
Key considerations:
Secure connectivity – A new site-to-site VPN (or equivalent IPSec tunnel) must be provisioned between the GPS application network and the new database subnet before cut-over.
Parallel development – To avoid interrupting active development and QA, the existing GPS Dev environment will remain online while a parallel Dev-New instance is stood up. An additional IIS site will point only to the new database server, letting engineers validate schema, connection strings, and data access logic without touching the legacy Dev environment.
Production continuity – In Production, a one-time database endpoint swap (plus VPN cut-over) is sufficient; no extra IIS site is required because we’ll schedule the change during an agreed maintenance window and run dual tunnels only as a temporary fallback.
This migration approach preserves ongoing testing and rollout cadence while ensuring a clean, securely tunneled transition to the new database environment.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following changes:
Network Connectivity & Security
Provision a new IPSec / site-to-site VPN between the GPS application subnet and the new database subnet supplied by Sotera
file_created_at
2025-06-16T15:48:41+00:00
file_modified_at
2025-06-16T15:48:41+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 65xH1blvgpz+uA | Sterigenics GPS Database Environment Migration | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
63c561a78f3303365e993055d2ce0013
file_name
Sterigenics - Moreland Arrangement Letter -Template.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2D3196F4-4275-4AC8-84E0-29955B8D06F0%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-Template.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
Sterigenics GPS Database Environment Migration
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
185.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting with migration of the GPS Database environment to a new hosting provider.
start_date
2025-05-01
extracted_at
2026-04-09T14:01:16.303066+00:00
raw_text_preview
May 5, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: Sterigenics GPS Database Environment Migration
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with migration of the GPS Database environment to a new hosting provider.
Engagement Overview
{{engagement_overview}}
Project Approach
We will utilize Agile methodology for this enhancement project. The scope items listed above have been reviewed with the Sotera team but may be adjusted as development progresses.
The estimated effort for this enhancement is 30 - 50 hours. We’re carrying a 20-hr contingency for VPN provisioning issues/delays or non-standard schema issues. If those risks don’t materialize the actual effort will be closer to the low end. The project is scheduled to start in May 2025 and to be completed by August 1, 2025.
Responsibilities
The following table outlines the key responsibilities for Sotera and Moreland.
Fees and Expenses
The Services will be performed and billed on a time and materials basis to Sotera billed at the end of each month through the Project. The blended hourly rate for the Moreland resources is $185 per hour.
Sotera will reimburse Moreland for out-of-pocket expenses that are approved in advance by Sotera.
Assumptions
This Arrangement Letter is based upon the following assumptions. If these assumptions change and/or are modified, the Arrangement Letter will need to be adjusted accordingly.
Sotera will dedicate a project leader to the Project.
New DB runs the same (or backward-compatible) engine version as current prod.
Only connection strings/secrets change—no code refactor expected.
Sterigenics QA owns full regression testing; MorelandConnect assists triage only.
Sotera will provide access to IT resources as requested.
Sotera will provide access to existing documen
file_created_at
2025-08-22T15:22:41+00:00
file_modified_at
2025-08-22T15:25:01+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||