Moreland 2025 Strategy

project 975e0cc5ed12dcd4
Normalized: moreland 2025 strategy
moreland_contracts
Entity Properties (gold project table)
project_id
975e0cc5ed12dcd4
name
Moreland 2025 Strategy
client_id
canonical_metadata
created_at
2026-02-12 05:36:54.288209+00:00
updated_at
2026-02-12 05:36:54.288209+00:00
status
billable
recurring
squad
qa_partner
project_manager
lead_dev
description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
state
team_name
closedate
dealstage
contract_type
time_and_materials
contract_hourly_rate
contract_estimated_hours
350.0
contract_total_fee
53%
Separation Confidence How distinct this entity is from others. Higher means no close matches existed when it was created. Lower means a near-match was rejected just below the 80% threshold — worth reviewing.
Moderate — a somewhat similar entity exists
85%
Avg Match Confidence The average confidence score across all active source mappings. Shows overall quality of linkage between source records and this canonical entity.
Good match quality

Source Mappings (91)

Source Source ID Display Name Confidence Method Status Actions
moreland_contracts TA0MsvJAupmZPQ Moreland 2025 Strategy 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
Moreland 2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-03-04T06:05:52.631771+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts R5AJA2bpbXGlKA Moreland 2025 Strategy 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
Moreland 2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-23T00:05:50.351769+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts YEqa8eDv1njHPA Moreland 2025 Strategy 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
Moreland 2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-25T12:05:03.521813+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts +1I6a98tLO9EyQ Moreland 2025 Strategy 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
Moreland 2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-20T18:04:44.009722+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts qpCzGt2YewyHvA Moreland 2025 Strategy 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
Moreland 2025 Strategy
contact_person
Justin
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-22T02:05:18.408433+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts 6OpUEA5KkZ4SPQ Moreland 2025 Strategy 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
Moreland 2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-03-03T18:05:26.204025+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts IGFCVJNKI2+xMQ Moreland 2025 Strategy 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
Moreland 2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-03-02T18:04:44.764845+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts fbL3EVngo+O9iw Moreland 2025 Strategy 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
Moreland 2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-22T06:04:31.627411+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts PLxX39HAlOd5fw Moreland 2025 Strategy 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
Moreland 2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-21T06:05:03.950906+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts kniaZ7k95oIkYw Moreland 2025 Strategy 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
Moreland 2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-03-05T12:05:27.813106+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts LCv2TX7DwVYwEQ Moreland 2025 Strategy 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
Moreland 2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-21T00:05:31.777289+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts CmA3RcXU3gOhUA Moreland 2025 Strategy 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
Moreland 2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-03-22T02:05:22.719463+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts M54uc8InVLwfIQ Moreland 2025 Strategy 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
Moreland 2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-26T00:05:11.458858+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts 5r3JNsYNd9tlCA Moreland 2025 Strategy 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
Moreland 2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-03-06T00:05:08.610118+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts P+Aqh6Z5CbFWgg Moreland 2025 Strategy 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
Moreland 2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-03-29T02:05:38.617838+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts c2rzSIcDxmF1dA Moreland 2025 Strategy 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
Moreland 2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-03-05T06:04:58.862496+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts LtHVXkZcrUBTNA Moreland 2025 Strategy 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
Moreland 2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-04-08T21:08:24.296172+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts 62E859qwMhd+3w Moreland 2025 Strategy 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
Moreland 2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-03-02T17:48:23.547938+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts ceeuLjliQxejAA Moreland 2025 Strategy 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
Moreland 2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-03-31T02:06:15.790152+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts mMfITdUVeLMTlA Moreland 2025 Strategy 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
Moreland 2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-04-15T02:05:39.746917+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts /ODdx5Du7PXWcQ Moreland 2025 Strategy 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
Moreland 2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-03-26T02:06:57.174354+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts dsSmQv9gGOKGTg Moreland 2025 Strategy 1.00 exact Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
Moreland 2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-04-09T13:59:14.974936+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts wS8jfb7axAErEw 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-26T06:05:29.799157+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts S4KvtfJSfT/itw 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-26T02:05:22.052969+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts oMA/ec+66k6WDQ 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-25T02:05:10.705017+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts jF6Q+u88dIvK2g 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-22T00:04:45.999557+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts fbjLDIMZ4H6ZiA 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-21T12:04:59.286966+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts +FKmY7u//wCADg 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-22T12:04:58.116345+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts QirIRMS8Wb/nNw 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-19T12:05:33.706221+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts 3f50nD5XKkaFQg 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-24T00:04:48.560408+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts 5oaIY6NJKSi9nA 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-03-03T00:04:36.731804+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts HhZHx1j1mijEIA 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-03-23T02:05:51.217433+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts 7czpobyZ80k9Qw 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-03-25T02:06:41.383780+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts ua6m+BQuRgE5aQ 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control.
start_date
extracted_at
2026-04-08T02:05:59.514188+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts XWkh3//Trp1yIw 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and service level agreements.
start_date
extracted_at
2026-04-05T02:05:38.417739+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts IwQOYkHCc8YCFA 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-03-30T02:06:49.636717+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts sakfZyVEQpzdOw 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-03-27T02:06:15.328195+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts TQjmZzZ1vCPPSg 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-03-04T02:05:41.089918+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts Mnwx7eOe88pacA 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-03-02T17:48:35.584890+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts yKhagjOlNEuQNw 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems.
start_date
extracted_at
2026-03-03T02:05:33.738123+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts ZQ6D+7Mzd3HI5g 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-25T18:05:34.605558+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts 2sH+DdODXQ0HyA 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-24T18:05:26.149834+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts ePsW0SUT20mQIA 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-23T18:05:43.390992+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts 93e5AHAaPaFaPQ 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Justin
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-23T06:06:03.332920+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts fujW5YyaLSonGg 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-24T02:05:46.754340+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts CXPYYo28Iti7Og 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-04-03T02:05:36.910130+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts tOJigNwRA1qmPw 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-19T03:11:16.543224+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts fdVINZtl64+rCw 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-20T06:05:01.455219+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts 3fvcnjAzJwnRsQ 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-20T00:04:34.356036+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts uVmQ0NPuyDbOGw 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-20T12:05:07.545753+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts BDY7vOXSKuW95w 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-24T06:05:01.277544+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts z5P/h4SK2eyrzQ 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-26T18:05:03.336012+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts ntnzD3lvCYBSOQ 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-04-02T02:05:59.384041+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts MWLmSf2EkALpyA 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-03-05T00:04:32.464134+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts 9JlkN72pXmavZQ 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-26T12:05:21.227853+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts Fbpwo0TZUvpEYA 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Justin
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-24T12:05:01.145561+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts nwh6bQ5nXw4WOw 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-19T03:09:09.175197+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts +RFTnxguISJ/iA 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-19T06:05:23.388691+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts t4/qAVPWvsyZnQ 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-20T02:05:55.881101+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts LJhjIcaSD63u2w 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-25T00:04:46.529393+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts Nj2HXLiM8FZpfg 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-03-19T21:22:02.315258+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts CEvCnPN8xnpjkA 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-03-24T02:05:50.867928+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts vXiUvL+aVnNeIg 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-04-06T02:05:51.011064+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts FRggP08MI6mT4w 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-04-10T02:06:10.962919+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts 1OwiUVU1QHC9uQ 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-04-11T02:05:21.775359+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts CPD8+npiTlxUaA 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-04-12T02:04:49.036502+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts Bux06oZnS3wg0Q 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-04-13T02:05:40.567090+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts +eVUZKO6U15XSA 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-04-14T02:05:45.398238+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts hdMUjta1gV8Fvw 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-04-09T02:05:22.011629+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts LUe9rsYh/m1+ZA 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-21T02:05:32.022017+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts sNzDf86HEkYr7Q 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-03-06T12:05:08.277334+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts 4toqb5zbWCouSg 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-03-04T18:05:30.900609+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts h6CUt1pbP1666Q 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-03-04T12:05:04.070387+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts 15dVTtBpzFUC2Q 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-25T06:05:21.553882+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts 1GUfwD+LbbQ7Ew 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-19T18:05:17.856404+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts btejC6CVHQkWsQ 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-21T18:04:59.601867+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts 68ZSTcBw5/O17g 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-23T02:05:27.816053+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts E5F448GY4br3bQ 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-02-23T12:05:00.901300+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts DYZbqVb4gGEpyQ 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-03-05T02:05:26.173164+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts oWvva3tx1jrU3g 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-03-19T15:17:04.431250+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts VQCUxaqRqqfQIA 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-03-20T02:05:37.681922+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts EAI2rT3t1q49rA 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-04-07T02:06:17.645075+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts Jz1NRCBsBYquVw 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-04-04T02:06:14.665426+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts QqMxq1LDsuu38Q 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-04-01T02:06:51.574013+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts kmyC1BSwzIbW+Q 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-03-28T02:06:23.216849+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts 6evqy525gbs5bQ 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-03-21T02:05:56.391252+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts KPWI+tzxTa+NmQ 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-03-06T06:04:48.634530+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts nEcQ4wKu4EqtaA 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-03-06T02:05:21.202595+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts 3/T1PC3Fl3n4SQ 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-03-04T00:05:09.988000+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts gqq8Q3vpEoDo5Q 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
Mitch
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-03-03T12:03:55.492970+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta
moreland_contracts HVsoDpOm2keOGw 2025 Strategy 0.80 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
43ce1f1aaf61561a261faccd71f3f027
file_name
RiskLD 2025.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B9D7C4FC5-6115-49CF-AB2E-3AC5AF7D42FC%7D&file=RiskLD%202025.docx&action=default&mobileredirect=true
company
RiskLD
project_name
2025 Strategy
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
350.0
total_fee_estimate
brief_project_description
Implementation and maintenance of multiple systems including Hackensack and BJC, along with support and enhancements to software version control and quality control processes.
start_date
extracted_at
2026-03-03T06:04:34.467535+00:00
raw_text_preview
RiskLD and Moreland 2025 Strategy Item 1: New 2025 rollouts Throughout 2025, RiskLD anticipates completion and maintenance of Hackensack and BJC along with the implementation of Temple and two to four other systems. Moreland will modify its team structure to support this growth activity. Create dedicated implementation teams for each 4-6 week rollout. Mitch + 0.5 developer TBD lead + 0.5 developer Justin to oversee all rollout efforts with less day-to-day engagement Manage the transition from implementation to Turbo Team Support Estimated effort per implementation is 350 hours Item 2: Support/SLA Satisfaction The RiskLD contracts include support and service level agreements. Many of the items are software-related and supported by the Moreland team. Moreland will use the Turbo Team support group to triage, complete, or assign trouble tickets. Moreland will communicate contract requirements to the Moreland Turbo Team and will create necessary 24x7 support staffing. Moreland will implement Bold Desk or Zendesk with the four severity levels and automated responses required by the SLAs Moreland will provide support statistics to the RiskLD team after the close of each week. Item 3: Version Control RiskLD has asked Moreland to make improvements to software version control to maintain a single version of the RiskLD software while affording each system to apply system-specific configurations. Each hospital within a system is expected to run in the same way. Moreland will develop a cloud-hosted central system that contains all hospital configuration data and apply modifications to the RiskLD system to reference the configurations The configurations anticipated include SQL based alerts, changes to checklist, changes to thresholds The cloud configuration will be white-listed to ensure access only from RiskLD Moreland will commit to completing an estimate and plan by early January and to build the configuration platform (without main system integration) by the end
file_created_at
2025-02-26T02:12:36+00:00
file_modified_at
2025-02-26T02:12:36+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta