GPS Information Tab – Facility Downtime Schedule
project
99d3255486485418
Normalized: gps information tab facility downtime schedule
moreland_contracts
Entity Properties (gold project table)
project_id
99d3255486485418
name
GPS Information Tab – Facility Downtime Schedule
client_id
—
canonical_metadata
—
created_at
2026-02-12 05:36:54.288209+00:00
updated_at
2026-02-12 05:36:54.288209+00:00
status
—
billable
—
recurring
—
squad
—
qa_partner
—
project_manager
—
lead_dev
—
description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
state
—
team_name
—
closedate
—
dealstage
—
contract_type
time_and_materials
contract_hourly_rate
200.0
contract_estimated_hours
40.0
contract_total_fee
8000.0
56%
Separation Confidence
How distinct this entity is from others. Higher means no close matches existed when it was created. Lower means a near-match was rejected just below the 80% threshold — worth reviewing.
Moderate — a somewhat similar entity exists
100%
Avg Match Confidence
The average confidence score across all active source mappings. Shows overall quality of linkage between source records and this canonical entity.
Strong source linkage
Source Mappings (180)
| Source | Source ID | Display Name | Confidence | Method | Status | Actions | |
|---|---|---|---|---|---|---|---|
| moreland_contracts | ZDCwrHI8dQAmEA | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-04-09T14:00:57.722506+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | RVxRwbqelZUhzw | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-04-08T02:07:50.383981+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | w5SOo5ME5NL2xA | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-04-05T02:07:18.837762+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | nMfhtC0BExWfuQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-04-04T02:08:14.245748+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | xcZQ0bcJty9QsA | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-04-03T02:07:28.924468+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | y8WEkcjwY7DjfA | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-31T02:08:21.100571+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | Pdv6zWNsgEz7Bg | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-30T02:08:36.744442+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | AIv/TAh+ndbjIQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-26T02:09:03.730068+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | TrJ8bdDuFSvRTw | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-26T02:09:07.396538+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 1xpDd/b8ZL0l8g | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-19T21:23:56.691475+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | mcDodgYuwW2Qyw | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
8000.0
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-05T12:07:31.519140+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 0TqS1OM6NXfuAQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-05T02:07:03.945806+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | LQnjpBxjPfNBgA | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-03T12:05:38.026979+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | dwbRS7Vne08urA | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
8000.0
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-03T06:06:32.932968+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | IVOFMV0a4X24sQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-24T12:06:56.172240+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | ZdZ8SA9BTX8/qA | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-23T18:07:56.662305+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 77rdUAzWI0ISLA | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
8000.0
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-23T02:07:34.427259+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | yEv7uP3LyHIgtQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-21T02:07:34.452590+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | uTrimAcySC8rMw | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-19T06:07:39.368816+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | JXSoX4IFD0t0TA | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-19T03:11:07.066965+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | +hyFALZijif41A | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-19T12:07:34.725556+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | qfnUzfJR1gPz3Q | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-22T00:06:44.567343+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | fiF3Fahvntgo/A | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-21T12:07:02.474764+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | fer4uKxKIVzb2A | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-23T12:07:08.364926+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | F/moUss+sCPJgg | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-23T06:08:33.521978+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | PYTadrnxrZDRzw | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-23T06:08:37.341536+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | h+kFbG+lXfudnA | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-02T17:50:46.174041+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | nzQiqU4jFsBBqg | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-04T00:07:30.221537+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | QKsWbbxaIAYcyA | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-19T15:18:55.769899+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | yZLI7gaxGY5gYw | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-22T02:07:11.208987+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | Tyv+pwmloimPZw | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-24T02:07:44.423869+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | /9OZbz+H0Nn9YQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-25T02:08:48.957828+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | f69Liq3FsPv+3w | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-29T02:07:16.472437+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | Do6GR41/RAp0hQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-04-10T02:07:59.225744+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | Au2ZC8fLuIHzjQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-04-10T02:08:01.877976+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | /RGNctLRo5cBFg | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-04-08T02:07:54.456244+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | flJQkYLXjr2r2Q | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-04-07T02:08:26.278817+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | wz22wr+YoHabYA | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-04-06T02:07:40.246792+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | A6HmUatp/yJKKw | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-04-03T02:07:32.707802+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | HEXZB2oX0ZFUXw | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-04-02T02:07:58.150092+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | ipvb9f5AdM4CDQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-04-01T02:08:57.303619+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | mZTnJ9YPcalNJQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-28T02:08:25.027264+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | LFXp27mYwnPuag | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-27T02:08:07.756597+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | Ujct2j/sWBM/8w | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-06T12:06:39.374798+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | ikm9NTwXufyDMA | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-06T02:07:06.438127+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | brrCe/n0bmZoyg | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-06T00:06:44.539949+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 4WTFmvPfVPWZTw | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-04T18:07:40.739623+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | sFGQ3jDvWFmWPQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-04T00:07:27.093349+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | NHsOhYBxqwhT+g | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-04T06:08:56.285824+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | BG8KMGmKf/Qkrg | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-04T02:07:51.890327+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | RVggRbQX/j2pFg | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-04T18:07:37.951258+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | ++lUScIGBa/3YQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-02T18:06:42.702787+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | ZRwt5B4tM1YvFA | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-02T17:50:31.779440+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | JBumZM4v2QbpAw | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-26T12:08:06.804547+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | n0hOyA3Vi+ofsQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-25T18:07:50.178142+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | jXyFMR2wIaZ4lw | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-25T12:07:08.250445+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | l1Y+Smp76HdzDg | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-24T06:07:13.224638+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | U3cqiAoOaGAmyg | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-25T06:07:28.421411+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | pb5FSUBf4Ct5Mg | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-23T02:07:29.929172+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 7CSBE8oHr8YjvQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
8000.0
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-21T06:07:16.320551+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | BRu5jIXDo6WkuQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-19T03:13:16.010046+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | Ma07v1qe7B+fRg | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
8000.0
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-19T03:13:13.205673+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | QdLmL/ey5sCDJw | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-19T18:07:30.485381+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | L02NJqXhrtn5AA | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-21T02:07:37.377516+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 5UL1+jwUrB4LlA | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-20T12:07:13.753431+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | aCfd1ISF0oD+WA | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
8000.0
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-20T06:07:15.916809+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | iNb+A6QH9IqvFQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-19T12:07:31.922519+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | a+AF59Xh8pDKuw | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-20T02:08:05.207688+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | RdYk7I4P0yHeUw | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-23T00:08:22.107923+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | qJSpieJwUkZ5Rg | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-23T18:07:53.849034+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | mY51BmVvC14S8A | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-25T00:06:36.213580+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | dWt+ccCdeGSVAQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-03T00:06:27.626852+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | TStpxBrBmcpHFA | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-26T18:07:18.535921+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | QXGdIvkabyB6wg | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-03T00:06:30.107892+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | kdKNW4I54F+NkA | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-05T06:06:41.234432+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | ZaaP0DMaP+e5nQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-05T12:07:28.575486+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | Dy6e9uzmlZeROQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-05T00:06:01.398535+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | GGDHWUXxeMP0qw | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-19T21:23:53.595694+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | s3TEtDrcSdHSRQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-21T02:07:59.612438+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | S7MaVFN2+JA4jw | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-23T02:07:58.053529+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | Yi1pOA0lGxfsGw | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-23T02:07:54.899359+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | LaCiSRPBbs8SsQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-24T02:07:46.612818+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | RensTon2ntSXJw | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-29T02:07:12.828094+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | b5EErQuvlMMNqw | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-04-06T02:07:43.027305+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | FaxSpabK7CgisQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-04-09T02:06:51.518510+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | udBcF7FsY6X4Tg | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-04-07T02:08:29.706436+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | bfssHQfm3XsbXA | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-04-05T02:07:21.731166+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | D/9KYRrSMTjKKA | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-04-04T02:08:17.185977+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | oXsU+oOyY05wNQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-30T02:08:39.300745+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | NuYJiHHKk5PcBw | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-06T12:06:42.426182+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 7V0u67sfltXtvw | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-05T06:06:43.926526+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 0XhgSgzYvSeerA | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-03T18:07:36.279994+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | /UVWVaucqNLX4g | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-04T12:07:12.197715+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | F8dJHZKknAfhig | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-03T02:07:41.626700+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | B6/WJ1Im+vNieA | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
8000.0
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-26T02:07:28.456333+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | eitNYtTeU+QgsQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-25T00:06:38.868154+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | ZdxruQpMoFfCuQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-25T02:06:54.357910+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | pLnaR9gBzjrc0Q | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-24T18:07:33.775000+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | J3SzPsTM1wBDCQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-24T06:07:09.699103+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | KKiFo/RlCNxvgQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
8000.0
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-23T12:07:10.611426+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | JJfDu/k5qU0ZJw | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-24T00:06:50.222227+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | O1366k1b/DJ3Lw | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-24T02:07:59.466205+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | vfiPpQJMIK/BYQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-22T12:06:56.649155+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | oBoD+5yV/GZ8IQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-22T06:06:17.625587+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | sdhjcN4N56kubQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-19T03:11:09.666695+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | GN/fKlZevgHG5w | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-22T00:06:40.660568+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | sEgFHuwDkeu8rw | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-21T06:07:18.897768+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | UStnZdTh/zr6MA | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-21T12:06:59.478949+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | ad176XO/wGGpZw | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-21T18:07:11.841566+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | XlGRDaeOaP9XQw | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-22T06:06:20.250654+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | Jj9BoxvEdQJHbQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
8000.0
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-22T12:06:59.546800+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 316WCKDFGpY/fA | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-21T00:08:10.937260+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | zArw8hb8l3v0Bw | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-20T00:06:14.884199+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | JyVuqV0MDwREUA | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-20T18:06:43.264225+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | sjbHUsAHntPnkw | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-24T00:06:52.990301+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | dR6wuQJq21n92w | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-24T02:07:56.671184+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 27uzf9s3Mzsuww | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-02T17:50:49.239954+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | zMdQW9t2WO6GNg | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-26T18:07:15.515007+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | fovsRsORCqcC6A | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-05T02:07:01.657319+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 7wgbLRkRyPQAow | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-05T00:06:03.369553+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | Qq+oGJTqJGGUEg | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-20T02:07:08.973884+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | dFKd9SzphisyBQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-21T02:08:02.396510+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 1ko4dunRF0s+Gg | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
8000.0
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-28T02:08:27.882048+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | AGf5C/DjcaE6ag | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
8000.0
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-04-01T02:09:00.207684+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | NjpGvA1yH2sPhg | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-04-08T21:09:54.789903+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 06KZybYR5+tUhA | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-04-09T02:06:53.937730+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | MBO3RdilIJ++UQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
8000.0
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-04-02T02:07:55.509516+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 8qq28jS65iv+yQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-31T02:08:17.981682+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | Z9yUZWuZau9HlA | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-27T02:08:04.906306+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | TsFiRqXPSGH+tg | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-20T02:07:06.478025+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | jFt4/MtP43ZgtQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-06T02:07:08.940789+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | jQB80FJeSGg/jQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-06T00:06:42.418857+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | uT9D0x2MWFXmCQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
8000.0
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-06T06:06:31.508359+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | bHzce5ve1kV1ug | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-06T06:06:34.124501+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | oRusUJnn58/1Uw | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-04T02:07:49.327063+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | Cl9esI2A8rF44g | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-04T12:07:15.831825+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | rhEM3YgCIPUCHA | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-04T06:08:52.814655+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | XI/PhjgQNuhW1A | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-02T17:50:35.243069+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | Tk4a4KsKtwXquA | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
8000.0
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-03T02:07:37.280237+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 6xdFNwn1P5u1mg | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-03T12:05:40.916940+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | jPxapkZBKJPNJw | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-03T18:07:39.376801+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | Pfy7gHWE5ya/OQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-03T06:06:34.840781+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 2pXVSCpTTRTpCQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-26T12:08:02.964363+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | XyLIu3isu6EX1g | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-26T02:07:24.360201+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | SZI+qvrL03siVg | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-26T00:07:24.329303+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | ARSug2s5DUvqaQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-26T00:07:28.387967+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 2zEgsBFI8XsR+Q | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-25T18:07:53.185001+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | mgAROpUivrotXg | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-24T18:07:30.818322+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | n5qhilPbMs4gxw | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-25T02:06:51.578011+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | S6c8OTSpEnuUdw | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-19T06:07:35.756109+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | acC4EyvoT5fOAw | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-20T00:06:17.365662+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | xLXrTyho5CoMYA | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-20T18:06:40.498721+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | DXmX+Xmy7WcwIQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-20T06:07:12.443824+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | Un7N2uXZ9zJfIw | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-22T02:07:09.407332+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 6ay+BaUhW0pXjA | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-22T02:07:12.131132+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | VDXEsFZ22MkxbA | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-21T18:07:09.073737+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | Tede8A+3aBo84g | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
8000.0
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-20T12:07:10.617801+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | gV+dBYYtwQ4StQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-19T18:07:33.947559+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | cNRu28gn1oMxdQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-21T00:08:07.369190+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | xYgbU57MrrO5yQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-20T02:08:02.110675+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | lDbjotJGcmGGYw | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-23T00:08:17.885125+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | H7vj3Gb7kvlF4Q | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-25T06:07:31.653851+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | GKVIZcYlrmCQtA | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-25T12:07:05.057156+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | zt565NIt88Q96g | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
8000.0
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-02-24T12:06:58.360524+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | CSEK+Y9t0qwn5A | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-02T18:06:45.096910+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | /B4t69L3OINcwg | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-19T15:18:52.874575+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | YWNyipIfSEALzA | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-22T02:07:08.561952+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | sBE6vgZg/5bsMQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-03-25T02:08:54.847540+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | zs3bVcaIACjd6A | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-04-08T21:09:56.896729+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | TZXzYEqVWuMumA | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-04-11T02:06:58.733343+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | HX/TaTpnijtNnQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-04-11T02:06:56.121536+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | zh8xgC6ecVnbog | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-04-12T02:06:24.434159+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | FSFEmffLTwFI5g | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-04-12T02:06:22.356265+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | L6/T4DfBLSypJQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-04-13T02:07:24.172674+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | Y5oD8CDp2YLJ6w | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-04-13T02:07:26.435539+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 7ZBKlWy5GX5Hdg | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-04-14T02:07:21.229676+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 2AwTVNoCkY5BRQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-04-14T02:07:18.532718+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | h4MoSZJSB/h9jQ | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
3c066d42a3a295e6c8c7242db0d59724
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B2303EB0F-0C45-4A02-96B3-DB91FB773CA8%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
8000.0
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-04-15T02:07:09.919256+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:17:07+00:00
file_modified_at
2025-10-08T15:31:20+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | FCXOh7MWlfZO4Q | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-04-15T02:07:06.023500+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||
| moreland_contracts | 6PSTGc2Z0eQe3g | GPS Information Tab – Facility Downtime Schedule | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
0640f7105c1034c6e1e517992a413041
file_name
Sterigenics - Moreland Arrangement Letter - GPS Downtime Info Tab - DRAFT.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BBE7F0655-F4C1-4AAE-A8C6-9C2C574E377A%7D&file=Sterigenics%20-%20Moreland%20Arrangement%20Letter%20-%20GPS%20Downtime%20Info%20Tab%20-%20DRAFT.docx&action=default&mobileredirect=true
company
Sotera Health LLC
project_name
GPS Information Tab – Facility Downtime Schedule
contact_person
Jim Kolz
contract_type
time_and_materials
hourly_rate
200.0
estimated_hours
40.0
total_fee_estimate
—
brief_project_description
Assisting Sotera with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
start_date
2025-11-01
extracted_at
2026-04-09T14:00:55.185578+00:00
raw_text_preview
October 8, 2025
Jim Kolz
Sotera Health LLC
9100 South Hills Blvd, Suite 300
Broadview Heights, OH 44147
Re: GPS Information Tab – Facility Downtime Schedule
Dear Jim:
MorelandConnect LLC ("Moreland") is pleased to provide this Arrangement Letter ("Agreement") confirming our consulting services (the "Services") to assist Sotera Health LLC ("Sotera") with adding a Facility Downtime Schedule capability to the GPS system via a new Information tab.
Background
Sotera requires a simple, reliable way for authorized users to view planned facility downtime. We will introduce a new Information tab in GPS that exposes a Facility Downtime Schedule for facilities the user is permitted to access. Facilities will be grouped by technology, and users can drill into an individual facility to view upcoming downtime windows with start/end dates and a computed duration (inclusive days). The data will originate from entries made in E1 and synchronized into a new GPS reference table.
Project Scope and Approach
Project Scope
Moreland will assist Sotera in implementing the following improvements:
Information Tab & Navigation
Add a new Information tab in GPS and include a “Facility Downtime Schedule” entry.
Link to a facilities list grouped by technology with drill-down navigation per facility.
Access Control
Limit visibility to facilities explicitly assigned to the user in the User profile.
Enforce existing GPS authorization patterns for facility access.
Integrate data from the new proposed table that will be populated via ETL
Scaffold the new GPS downtime table (fields for effective/expired dates, reason code, partial/full, comments, audit) into a backend database object
Facility Grouping & Metadata
Retrieve technology classification from the technology classification reference table
Define fallback behavior for missing/invalid technology mappings and log exceptions.
Downtime Schedule UI
Facility drill-down view with a table of planned events: Start Date, End Date, Duration (inclusive
file_created_at
2025-10-08T15:31:38+00:00
file_modified_at
2025-10-08T15:31:35+00:00
created_by
Justin Wray
modified_by
Justin Wray
_dlt_meta
—
|
|||||||