Internal Constructability Review for Estimate
project
a9860ebfdcbc05de
Normalized: internal constructability review for estimate
moreland_contracts
42%
Separation Confidence
How distinct this entity is from others. Higher means no close matches existed when it was created. Lower means a near-match was rejected just below the 80% threshold — worth reviewing.
Moderate — a somewhat similar entity exists
100%
Avg Match Confidence
The average confidence score across all active source mappings. Shows overall quality of linkage between source records and this canonical entity.
Strong source linkage
Source Mappings (1)
| Source | Source ID | Display Name | Confidence | Method | Status | Actions | |
|---|---|---|---|---|---|---|---|
| moreland_contracts | 95ff49c2559ae5167fe9f0d3ff8ef2f4 | Internal Constructability Review for Estimate | 1.00 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
95ff49c2559ae5167fe9f0d3ff8ef2f4
file_name
6.6.25 - Thompson - Internal Constructability Review Meeting.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B3592C3FA-E4D0-4D85-988D-1431B2A6FA5E%7D&file=6.6.25%20-%20Thompson%20-%20Internal%20Constructability%20Review%20Meeting.docx&action=default&mobileredirect=true
company
—
project_name
Internal Constructability Review for Estimate
contact_person
—
contract_type
—
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Review and estimate constructability for internal project involving sanitary lines and material pricing.
start_date
—
extracted_at
2026-07-24T02:28:09.545062+00:00
raw_text_preview
6.6.25 – Thompson -Internal Constructability Review for Estimate
Reach out to Corsillo – on tie in with addition sanitary lines to existing. Already a grinder pump can we tie into that.
Poured walls vs. block – pricing exercise.
Brumberg may be doing poured walls. Reach out to Andrew.
Ask well guy
If stick material is cheaper than trusses than go with stick framing.
Maybe quote material both ways.
*Huddle with Lakes/HVAC on conditioned air system.
*Look into electrical, 200amp at property? Service upgrade? Check with Anthony, can we just assume a subpanel
*send drawings and rough sow on demo to Marty he can get high level pricing back
file_created_at
2026-07-23T12:45:40+00:00
file_modified_at
2026-07-23T12:45:40+00:00
created_by
Dean Tompkins
modified_by
Dean Tompkins
_dlt_meta
—
|
|||||||