Discovery / Takeover Assessment
project
acec87c600a138a5
Normalized: discovery takeover assessment
moreland_contracts
Entity Properties (gold project table)
project_id
acec87c600a138a5
name
Discovery / Takeover Assessment
client_id
—
canonical_metadata
—
created_at
2026-02-12 05:36:54.288209+00:00
updated_at
2026-02-12 05:36:54.288209+00:00
status
—
billable
—
recurring
—
squad
—
qa_partner
—
project_manager
—
lead_dev
—
description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
state
—
team_name
—
closedate
—
dealstage
—
contract_type
fixed_fee
contract_hourly_rate
—
contract_estimated_hours
—
contract_total_fee
—
58%
Separation Confidence
How distinct this entity is from others. Higher means no close matches existed when it was created. Lower means a near-match was rejected just below the 80% threshold — worth reviewing.
Moderate — a somewhat similar entity exists
100%
Avg Match Confidence
The average confidence score across all active source mappings. Shows overall quality of linkage between source records and this canonical entity.
Strong source linkage
Source Mappings (89)
| Source | Source ID | Display Name | Confidence | Method | Status | Actions | |
|---|---|---|---|---|---|---|---|
| moreland_contracts | SLy6TZ+5ShfjPg | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-03-20T02:08:36.284465+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | x8ZWuCHHqhGkPQ | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to deliver complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-03-05T02:08:34.095228+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | 7OzoQKtkyN0Qyg | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-03-04T02:09:12.678092+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | YvxZwZw384LnDA | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-03-03T12:07:02.124365+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | U4QZPgBKXXEgiA | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-03-04T18:09:15.010016+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | j83pxsCLiDIRkw | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to deliver complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-03-03T02:09:07.655550+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | SIIVmYwPPK3M0A | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-02-26T00:08:55.960984+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | +Cxx4eFFOSRCug | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-02-25T06:09:07.072164+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | 9ARFFcYk+pWrXg | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-02-24T18:09:01.099186+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | aTD8FLEvjPZJNw | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-02-19T03:12:27.998764+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | TF2sSWDDdV0jfg | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-02-20T12:08:35.425743+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | /k6RF/SSO5QCkw | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-02-23T02:08:59.292002+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | ZG6JNQq07SdKFg | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-03-06T00:08:01.957243+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | DtAXLs2/MHTdYA | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-03-06T06:07:59.422458+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | PodjIcFU9r1XHQ | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-03-19T15:20:31.724210+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | rxIqGN/+i1i6nw | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-03-28T02:10:06.314889+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | kkmO0HsaGYgjNQ | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-04-06T02:09:20.941453+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | ax/SLpRj+Qx3Wg | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to deliver complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-04-08T21:11:18.867442+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | 3S/ex4m415HWKA | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to deliver complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-04-08T02:09:42.409219+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | oXJQj52KOp2HFg | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-04-05T02:09:03.030123+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | uzZ31pKx+LYD5w | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-04-03T02:09:13.859577+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | r+emUTpDvELh/Q | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-03-31T02:10:11.972695+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | 6jiKk4YHVeKkCg | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-03-27T02:09:55.996901+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | Sjp4BfzJWvzO8w | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-03-22T02:08:41.664072+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | W9kpLCdF3rqExQ | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to deliver complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-03-06T02:08:37.114201+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | d9g8zHn7mRkwfg | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to deliver complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-02-26T18:08:58.087713+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | OEGyhpix58XEEA | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete documentation and technical artifacts.
start_date
—
extracted_at
2026-03-02T17:52:09.729147+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | f9AJQMBZVvGWDw | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-02-26T12:09:52.878272+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | TGlCtJhoSA43hw | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-02-25T18:09:25.626836+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | +nbRnOJuGWFU/g | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete documentation and technical artifacts.
start_date
—
extracted_at
2026-02-19T06:09:03.048637+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | 3gq9vFpPGeBa2g | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-02-20T06:08:39.011438+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | h+Kmqwmlg1qb1Q | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-02-22T06:07:37.856340+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | AuTlSS+jc9pcHQ | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to deliver complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-02-19T18:09:01.218363+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | UCi+GMxpH2ysWg | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-02-19T12:08:55.342794+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | c8LFRtxb5FrJdA | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-03-02T18:08:05.787976+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | I7iTGCTazX8JOw | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-03-05T12:09:13.417727+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | vZzpKOIAlmA/LA | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete documentation and technical artifacts.
start_date
—
extracted_at
2026-03-21T02:09:54.098937+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | Gu5ZMqJclkb7eg | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-04-01T02:10:55.830811+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | iywDB7DjxcVY9A | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-04-07T02:10:34.701695+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | GUWMaMPBlc3gWQ | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-03-30T02:10:28.233179+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | 1YX0Urf17aGbEQ | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-03-23T02:09:38.489358+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | bplAsBk5FiGAjw | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-03-06T12:08:10.991581+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | d8D5zI40ttyh6w | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to deliver complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-03-03T00:07:48.793110+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | CChyCXDSjf2ghw | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-03-02T17:52:18.525283+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | 0cfZpbayV3nYtw | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-02-26T02:08:52.796338+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | q0ha3Gf5Upd3QQ | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-02-25T02:08:21.456322+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | VQs7luQSOfN2gQ | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to deliver complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-02-25T12:08:55.832859+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | ERrMk8Y7iAmLIw | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-02-23T06:10:24.408580+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | pOO01c9ryOq6iA | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-02-23T18:09:24.750919+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | NOLokuz/f9k6gQ | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-02-24T02:09:19.969966+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | 7NHAKZraWLvR5g | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to deliver complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-02-22T02:08:25.718611+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | KQxVwET5HVWA5g | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-02-20T02:09:26.957202+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | G1xofABwa1/i8A | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-02-21T06:08:37.574755+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | 01b1mVciYUPvCw | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete documentation and technical artifacts.
start_date
—
extracted_at
2026-02-21T00:09:36.842903+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | 59GsT2o4Tx99eA | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to deliver complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-02-20T00:07:34.365880+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | g8SIQ7oY1+CHfA | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-02-24T00:08:21.435383+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | 6zdAynmfQb/Nig | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-02-24T12:08:19.867831+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | 6nhB633d2sEwuA | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-03-04T00:09:13.561757+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | R1ACBDh3od+MfA | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete documentation and technical artifacts.
start_date
—
extracted_at
2026-03-24T02:09:23.186476+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | c0t+De10hKp63g | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete documentation and technical artifacts.
start_date
—
extracted_at
2026-04-10T02:09:30.606744+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | UGZiJ+sAGzGiSg | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-04-04T02:09:53.750154+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | jtOi4oOx80cN+w | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-04-02T02:09:45.799963+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | 4jMVXX5dWDeR5g | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-03-26T02:10:54.742247+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | 4dyJsQixeE8PBA | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-03-19T21:25:33.886898+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | 9CFZ8Hn5o/uBKw | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-03-04T12:08:46.369515+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | 62uohaBOU5xOmQ | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-03-04T06:10:56.583245+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | lPJx7tMjGfJiIg | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-03-03T18:09:16.256167+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | N/ykVT05s8gHnw | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-02-25T00:08:04.138434+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | peRf9cGnh8rI5w | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-02-23T12:08:40.903506+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | GbGdE78ZlKdpAw | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to deliver complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-02-19T03:14:35.119485+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | fU5PjYsblKZRcA | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete documentation and technical artifacts.
start_date
—
extracted_at
2026-02-22T00:07:57.976716+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | xbWRF5d7L0NKpg | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-02-21T12:08:23.959755+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | NXj6HISWaKZyIQ | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-02-21T18:08:40.753017+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | tYswvjbYd3z4qg | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-02-21T02:09:12.872436+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | soNRHlzvCkfPtQ | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-02-22T12:08:19.871226+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | X80VoEBwyOATBQ | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to deliver complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-02-20T18:08:00.082382+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | G/MvAbdb8xSEJA | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-02-23T00:10:28.605107+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | bCLu9lmW0g7qgQ | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-02-24T06:08:38.623631+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | L7xQUdIPEeNQ/Q | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-03-03T06:08:08.445305+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | vte0FVCXRU+9pw | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to deliver complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-03-05T06:08:12.516977+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | TPbWmOIHQ+ITTw | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-03-05T00:07:22.559161+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | 4MwNLkHQFYmOow | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-03-25T02:11:05.184115+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | j0T2QTfDE0Y+oA | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-03-29T02:08:50.280816+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | Kicq18gJgKQNdQ | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-04-09T02:08:12.199425+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | gzmPDzAMBGRthA | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to deliver complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-04-11T02:08:22.842830+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | vFcYAx/e3kLLUw | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-04-12T02:07:39.805559+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | EkK8PKb9bNhn2Q | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-04-13T02:08:55.576812+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | 93+YzuA5cwXPFw | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to produce complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-04-14T02:08:47.114116+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||
| moreland_contracts | Zv3uKHtSyVDUGA | Discovery / Takeover Assessment | 1.00 | exact | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
8b87eaa3396631d9c6d3b2afd79b8969
file_name
Phase_1_Discovery_SOW[1].docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7BA3C9C27C-4561-4C7F-8405-1199A939BAA6%7D&file=Phase_1_Discovery_SOW[1].docx&action=default&mobileredirect=true
company
Zircoa
project_name
Discovery / Takeover Assessment
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Perform discovery across application, infrastructure, database, and integrations to deliver complete, actionable documentation and technical artifacts.
start_date
—
extracted_at
2026-04-09T14:02:31.356867+00:00
raw_text_preview
Phase 1 SOW — Discovery / Takeover Assessment (Discovery-only)
Client: Zircoa, Solon, OH
Systems: Homegrown Java production/reporting system (“PARS”) + integrations to SYSPRO and LabVantage LIMS; SQL Server backend; Tomcat on Linux VM; JBoss integration component(s) on Windows (and possibly Linux).
Engagement type: Discovery-only (no ongoing support commitment required)
Timeline expectation: Completed within 3–6 weeks (vendor to propose a week-by-week plan).
Onsite: As needed in Solon, OH (anticipated 1–5 days total; vendor to propose).
1) Purpose
Reduce “bus factor” and enable reliable troubleshooting and feature delivery by producing complete, actionable documentation and technical artifacts that make the system buildable, deployable, and understandable by a new team.
2) Scope of work
Vendor will perform discovery across application, infrastructure, database, and integrations to deliver the artifacts below.
A. System & environment inventory
Identify all environments and hosts (prod/non-prod if present).
Inventory all runtime components and dependencies: Tomcat instance(s) on Linux (versions, JVM params, connectors, deployment layout, log paths); JBoss/WildFly instance(s) on Windows/Linux (versions, mode, deployments, datasources, log paths); external dependencies (file shares, SMTP, AD/LDAP if used, certificates/keystores, etc.).
B. Source code + build reproducibility
Review source repositories and determine current build system(s) in use (Maven/Ant/other).
Produce a reproducible build procedure for each component, including: exact JDK version(s); build commands and prerequisites; dependency sources (artifact repos, manual jars, etc.); resulting artifacts (WAR/EAR/JAR) and where they deploy.
C. Deployment/configuration mapping
Document deploy procedures for each component: Tomcat deployment steps and configuration locations; JBoss deployment steps and configuration locations.
Identify and document environment-specific settings: connection strings, endpoints, cre
file_created_at
2026-02-06T14:15:36+00:00
file_modified_at
2026-02-06T14:15:34+00:00
created_by
Paul Franke
modified_by
Paul Franke
_dlt_meta
—
|
|||||||