Thompson Feasibility Pricing Review
project
b4098b3f4cc29e65
Normalized: thompson feasibility pricing review
moreland_contracts
59%
Separation Confidence
How distinct this entity is from others. Higher means no close matches existed when it was created. Lower means a near-match was rejected just below the 80% threshold — worth reviewing.
Moderate — a somewhat similar entity exists
87%
Avg Match Confidence
The average confidence score across all active source mappings. Shows overall quality of linkage between source records and this canonical entity.
Good match quality
Source Mappings (3)
| Source | Source ID | Display Name | Confidence | Method | Status | Actions | |
|---|---|---|---|---|---|---|---|
| moreland_contracts | 962b7b364ad188d691ddc2e40c121a21 | Thompson Feasibility Pricing Review | 1.00 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
962b7b364ad188d691ddc2e40c121a21
file_name
6.11.25 - Thompson HVAC review with Lakes.docx
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/_layouts/15/Doc.aspx?sourcedoc=%7B90CBE2A2-363E-43E7-8541-A236944B7C77%7D&file=6.11.25%20-%20Thompson%20HVAC%20review%20with%20Lakes.docx&action=default&mobileredirect=true
company
Lakes/HVAC
project_name
Thompson Feasibility Pricing Review
contact_person
—
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
22500.0
brief_project_description
Feasibility pricing review for converting garage to living space and addressing plumbing and HVAC considerations.
start_date
—
extracted_at
2026-07-24T02:28:06.294763+00:00
raw_text_preview
6.11.25 - Thompson Feasibility Pricing Review with Lakes/HVAC
Garage to living space does it need to be elevated up?
Account for crawl space access. The opening from existing basement will be filled with MEPs won’t have space to get in.
Confirm crawl space opening/hallway width so we can map out MEPs
17” wide furnace plus the elbow/throat is 14” wide plus filter/air cleaner
Back of furnace duct will run off of – 28x34” footprint.
Plumbing could run the sanitary line under the slab if needed.
$2,500 mudroom/laundry/master bath
$20k for addition
file_created_at
2026-07-23T12:45:40+00:00
file_modified_at
2026-07-23T12:45:40+00:00
created_by
Dean Tompkins
modified_by
Dean Tompkins
_dlt_meta
—
|
|||||||
| moreland_contracts | e98d754abc7546f775718ecd41ef9f1a | Thompson | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
e98d754abc7546f775718ecd41ef9f1a
file_name
Design Surfaces Countertop Quote Quartz Selection - Thompson 10.17.25.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Payne%20Tompkins/Payne%20%26%20Tompkins%20Upload/Thompson,%20Christy%20(Daughter)%20%26%20Sue%20(Mother)/02%20Quotes/19%20Countertops/Design%20Surfaces%20Countertop%20Quote%20Quartz%20Selection%20-%20Thompson%2010.17.25.pdf
company
Payne & Tompkins Design Renovations
project_name
Thompson
contact_person
Meghan Bergstedt
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
—
brief_project_description
Installation of quartz countertops in various areas including kitchenette, primary bathrooms, laundry, and back entry.
start_date
—
extracted_at
2026-07-24T02:30:44.718168+00:00
raw_text_preview
Estimate# 17939 - 1
Date: 7/31/2025
printed on W ednesday , October 15, 2025 05:10 pm
Design Surfaces
24000 Sperry Drive
Westlake, OH 44145
P: 440.899.9900
http://www.designsurfacesdist.com/
Bill To: Payne & Tompkins Design Renovations
10690 Mayfield Road
Chardon, OH 44024
United States
P: (440) 226-5040
M: (440) 474-3423 Job Name: Thompson
Attn: Meghan Bergstedt
9850 Peck Rd
Mantua, OH 44255
P: (419) 618-8598
Sales Rep Created By Payment Terms Expiry Date
David David Net 30 Aug 05, 2025
Description Quantity Unit
PriceExtended
Kitchenette & Pantry
QSL-CALA VERONA-3CM / MSI Calacatta V erona 3cm Quartz 27.00 SF
Eased and Polished Edge / No Charge 38.00 LF
Kitchen Undermount Sink Cutout 1.00 EA
Installation - No Tearout/New Cabinets 27.00 SF
Laser Template 1.00 EA
Subtotal $2,978.00
Sue Primary Bathroom
QSL-CALA VERONA-3CM / MSI Calacatta V erona 3cm Quartz 17.00 SF
Eased and Polished Edge / No Charge 11.00 LF
Vanity Undermount Cutout 1.00 EA
Installation - No Tearout/New Cabinets 17.00 SF
Subtotal $1,663.00
Christy Primary Bathroom
QSL-CALA VERONA-3CM / MSI Calacatta V erona 3cm Quartz 20.00 SF
Eased and Polished Edge / No Charge 13.00 LF
Vanity Undermount Cutout 2.00 EA
Installation - No Tearout/New Cabinets 20.00 SF
Subtotal $2,080.00
Sue Laundry
QSL-CALA VERONA-3CM / MSI Calacatta V erona 3cm Quartz 6.00 SF
Eased and Polished Edge 7.00 LF
Laundry Under Mount Sink Cut Out 1.00 EA
Installation - No Tearout/New Cabinets 6.00 SF
Subtotal $784.00
Christy Shower Parts
QSL-CALA VERONA-3CM / MSI Calacatta V erona 3cm Quartz 9.00 SF
Eased and Polished Edge 17.00 LF
Subtotal $733.00
Back Entry - T op of Ramp Countertop
QSL-CALA VERONA-3CM / MSI Calacatta V erona 3cm Quartz 6.00 SF
Eased and Polished Edge / No Charge 5.00 LF
Installation - No Tearout/New Cabinets 6.00 SF
Subtotal $534.00
Terms and Conditions:
Pricing on estimates subject to change . All Sales are final. Inspect material prior to installation, as installation means acceptance. No
returns on special order
file_created_at
2026-07-23T12:45:52+00:00
file_modified_at
2026-07-23T12:45:52+00:00
created_by
Dean Tompkins
modified_by
Dean Tompkins
_dlt_meta
—
|
|||||||
| moreland_contracts | 7dd35956ab100c4297fb123ea31b8e20 | Thompson | 0.80 | fuzzy+embedding | Active |
|
|
|
Source Record
bronze_moreland_contracts_ma_project_contracts
file_hash
7dd35956ab100c4297fb123ea31b8e20
file_name
Tile Labor - Premier marble - Thompson.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/Payne%20Tompkins/Payne%20%26%20Tompkins%20Upload/Thompson,%20Christy%20(Daughter)%20%26%20Sue%20(Mother)/02%20Quotes/18%20Tile/Tile%20Labor%20-%20Premier%20marble%20-%20Thompson.pdf
company
Payne & Tompkins
project_name
Thompson
contact_person
Daniel
contract_type
fixed_fee
hourly_rate
—
estimated_hours
—
total_fee_estimate
23500.0
brief_project_description
Master Baths
start_date
—
extracted_at
2026-07-24T02:30:34.301257+00:00
raw_text_preview
PREMIER MARBLE AND TILEINVOICE 440-313-7172
Premiermarble-tile@live.com
14725 Madison Rd.
Middlefield, Ohio
44062
Christy’s primary bath floor square footage I got 140sqft. In the email you sent the square footage is 350, maybe I’m missing something in the print. This price does not include any heated floor or trench drain. Best regards, Matthew Clifton Attention: Daniel
PD
Payne & Tompkins
10690 Mayfield Rd
Chardon, Ohio 44024
Date: 8/15/25 Project Title: Thompson
Project Description: Master Baths
Invoice Number: 53200
DescriptionQuantityUnit PriceCostChristy’s shower150$ 9,500.00Christy bathroom floor140$ 3,500.00Sue’s shower walls200$ 10,500.00Sue’s shower floor42Subtotal$ 23,500.00Tax8.50%Total$ 23,500.00
file_created_at
2026-07-23T12:45:51+00:00
file_modified_at
2026-07-23T12:45:51+00:00
created_by
Dean Tompkins
modified_by
Dean Tompkins
_dlt_meta
—
|
|||||||