Software Outline Phase #1

project b5c0ce6bf1c030f2
Normalized: software outline phase 1
moreland_contracts
36%
Separation Confidence How distinct this entity is from others. Higher means no close matches existed when it was created. Lower means a near-match was rejected just below the 80% threshold — worth reviewing.
Moderate — a somewhat similar entity exists
100%
Avg Match Confidence The average confidence score across all active source mappings. Shows overall quality of linkage between source records and this canonical entity.
Strong source linkage

Source Mappings (1)

Source Source ID Display Name Confidence Method Status Actions
moreland_contracts 0037b460ee4783879ef10e410434cfb5 Software Outline Phase #1 1.00 fuzzy+embedding Active
Source Record bronze_moreland_contracts_ma_project_contracts
file_hash
0037b460ee4783879ef10e410434cfb5
file_name
Software Outline-phase #1.pdf
file_path
https://morelandpartners.sharepoint.com/sites/MorelandConnect-BusinessDevelopment/Shared%20Documents/Internal%20-%20Business%20Development/NuCo/Software%20Outline-phase%20%231.pdf
company
NuCo Services
project_name
Renovation Software Development
contact_person
contract_type
time_and_materials
hourly_rate
estimated_hours
total_fee_estimate
brief_project_description
Development of a renovation software system accessible through a web portal for managing inspections, orders, and reports.
start_date
extracted_at
2026-07-02T02:08:24.202611+00:00
raw_text_preview
Software Outline Phase #1 Initial minimum requirements Sof tware systems shall be accessible through a web -site portal A minimum of access for ( 2) different entities initially •The entities that shall be party to the renovation software shall be: oRenovation Lender s oNuCo Services oEvent ually adding 3 additional entities interface Pre-closing process Order entry •Initially orders will be placed by lenders via E-mai l to NuCo Services oThe intent would be to con vert to API f rom l enders originatin g system •Manuel s etup in system per custom er/lender oProject file setup •Email to borrower with Inspection / report / fee agreement and v ia signature capture system oSigned copy automatically goes into software project file •Invoice sent to borrower via QuickBooks oEvent ually via API through QuickBooks oEventually, via NuCo integrated accounting oPayment would be automatic, with inter nal release in soft ware to dispatch field inspector •Software should keep project files in an orderly fashi on with visible displays of status and progre ss Mapping •Mapping showing active inspectors and locations oMapping to distinguish betwee n FHA inspectors and regular inspectors oEventually software should pull FHA inspector up date f rom HUD website on a weekly basis Inspector s •Manually select an inspector near the borrower’s proper ty location oEventually this should become a selection by the software •Initiall y Service Requests via email and signature capture system to field inspectors oEventually being an automatic dispatch via software oSigned copy coming back into so ftware project file EXAMPLE ONLY • Inspector to set up inspection date/ time with borrower and advise N uCo of the same with in Service Request time constraints Inspections • Inspector to complete inspection of any Manda tory repair s and to upload inspection information with all home notable defect and 90 pictures into software. o Eventually all defects to be id
file_created_at
2026-05-13T21:26:38+00:00
file_modified_at
2026-05-13T21:26:38+00:00
created_by
Jeff Kavlick
modified_by
Jeff Kavlick
_dlt_meta